Project overview

Auris Serenity Tower 3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001082. Auris Serenity Tower 3 is located at Cts No 326 Part 375 Part 376/A Part 376/A Part 376/A/3 376/A/4 382 Part. This is a Ongoing being developed by Transcon-Sheth Creators Private Limited.

Auris Serenity Tower 3 has 2 BHK & 3 BHK Apartments with carpet areas ranging from 1080 to 1029 Sq.ft. Carpet. The Project has total 332 of which 1 are currently available for sale.

Auris Serenity Tower 3 is being developed on a total land area of 8831 Sq.ft. Auris Serenity Tower 3 has 1 Wings / Towers Tower 3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Auris Serenity Tower 3
  • Location:
  • Cts No 326 Part 375 Part 376/A Part 376/A Part 376/A/3 376/A/4 382 Part
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Transcon-Sheth Creators Private Limited
  • Phone:
  • Address:
  • Waterford Building
Project RERA Details
MAHA REARA No: P51800001082
Project Type Others
RERA Project Status Ongoing
Architect Vilas Kharche
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Last Modified 17 Nov 2023
Last Retrived 26 Jul 2025
Auris Serenity Tower 3 QR Code
Auris Serenity Tower 3
MahaRERA - P51800001082
Apartment Details & Configuration
TypeArea
2 BHK73.75 Sq.mts. ( 794 Sq.ft. )
2 BHK74.85 Sq.mts. ( 806 Sq.ft. )
2 BHK75.15 Sq.mts. ( 809 Sq.ft. )
3 BHK95.4 Sq.mts. ( 1027 Sq.ft. )
3 BHK95.6 Sq.mts. ( 1029 Sq.ft. )
3 BHK100.35 Sq.mts. ( 1080 Sq.ft. )
3 BHK124.3 Sq.mts. ( 1338 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Auris Serenity Tower 3last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space15% completed
15% Complete
Approx 4420.71Sq.Mtr Rg To Be Handed Over To Apex
Childrens Play Area
To Be Handed Over To Apex Body
Club House with Gymnasium Steam and Sauna75% completed
75% Complete
To Be Handed Over To Apex Body
Community Buildings
Na
Counter for Refreshment Bar
To Be Handed Over To Apex Body
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Receiving Station To Be Handed Over To Apex
Energy management15% completed
15% Complete
As Per Moef Requirement To Be Handed Over To Apex
Fire Protection And Fire Safety Requirements50% completed
50% Complete
As Per Cfo To Be Handed Over To Apex Body
Grill Bar
To Be Handed Over To Apex Body
Landscaping & Tree Planting50% completed
50% Complete
Proposed On Edeck To Be Handed Over To Apex Body
Open Parking
Na
Outdoor Pavillion
To Be Handed Over To Apex Body
Podium RCC Structure for Tower 375% completed
75% Complete
To Be Handed Over To Apex Body
Pool Deck
To Be Handed Over To Apex Body
Senior Citizen Corner
To Be Handed Over To Apex Body
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
Stp To Be Handed Over To Apex Body
Solid Waste Management And Disposal50% completed
50% Complete
Garbage Room To Be Handed Over To Apex Body
Storm Water Drains60% completed
60% Complete
Swd To Be Handed Over To Apex Body
Street Lighting
Na
Swimming Pool
To Be Handed Over To Apex Body
Treatment And Disposal Of Sewage And Sullage Water60% completed
60% Complete
As Per Moef Requirement To Be Handed Over To Apex
Water Conservation, Rain water Harvesting52% completed
52% Complete
Rwh Only To Be Handed Over To Apex Body
Water Supply40% completed
40% Complete
Bmc Water Connection To Be Handed Over To Apexbody
Buildings / Wings in Auris Serenity Tower 3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Auris Serenity Tower 3 by Transcon-Sheth Creators Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8831 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

332 apartments in total
Total
332
Booked
331
Available
1

Saleable Area Statistics (Sq. ft.)

326720 Total
Total
326720
Booked
325382
Available
1338
Total 332 apartments in project. 331 apartments booked. 99% apartments booked.
Total 326720 Sq.ft. saleable area. 325382 saleable area booked.
100% area booked.

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Dec 20236210160609
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK73.75 Sq.mts. ( 794 Sq.ft. )58
58 Booked100% Booked
100% Booked
2 BHK74.85 Sq.mts. ( 806 Sq.ft. )34
34 Booked100% Booked
100% Booked
2 BHK75.15 Sq.mts. ( 809 Sq.ft. )66
66 Booked100% Booked
100% Booked
3 BHK95.4 Sq.mts. ( 1027 Sq.ft. )19
19 Booked100% Booked
100% Booked
3 BHK95.6 Sq.mts. ( 1029 Sq.ft. )39
39 Booked100% Booked
100% Booked
3 BHK100.35 Sq.mts. ( 1080 Sq.ft. )58
58 Booked100% Booked
100% Booked
3 BHK124.3 Sq.mts. ( 1338 Sq.ft. )58
57 Booked98% Booked
98% Booked
332 total apartments / 331 apartments booked. 99% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress23% done
23% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress23% done
23% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress43% done
43% Booked
Sanitary Fittings within the flats / premises
work-in-progress43% done
43% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress33% done
33% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Transcon-Sheth Creators Private Limited
for Project
Auris Serenity Tower 3
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation