Project overview

Auris Serenity Tower 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001413. Auris Serenity Tower 2 is located at Cts No 328 Part 325/A/1 Part 326 Part 327 Part. This is a Ongoing being developed by Transcon-Sheth Creators Private Limited.

Auris Serenity Tower 2 has 2 BHK, 3 BHK & 4 BHK Apartments with carpet areas ranging from 1193 to 807 Sq.ft. Carpet. The Project has total 340 of which 1 are currently available for sale.

Auris Serenity Tower 2 is being developed on a total land area of 9937 Sq.ft. Auris Serenity Tower 2 has 1 Wings / Towers Tower 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Auris Serenity Tower 2
  • Location:
  • Cts No 328 Part 325/A/1 Part 326 Part 327 Part
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Transcon-Sheth Creators Private Limited
  • Phone:
  • Address:
  • Waterford Building
Project RERA Details
MAHA REARA No: P51800001413
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Vilas Kharche
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 28 Jul 2017
Last Retrived 26 Jul 2025
Auris Serenity Tower 2 QR Code
Auris Serenity Tower 2
MahaRERA - P51800001413
Apartment Details & Configuration
TypeArea
2 BHK74.25 Sq.mts. ( 799 Sq.ft. )
2 BHK74.8 Sq.mts. ( 805 Sq.ft. )
2 BHK75 Sq.mts. ( 807 Sq.ft. )
3 BHK110.8 Sq.mts. ( 1193 Sq.ft. )
3 BHK111.7 Sq.mts. ( 1202 Sq.ft. )
3 BHK121.9 Sq.mts. ( 1312 Sq.ft. )
3 BHK122.75 Sq.mts. ( 1321 Sq.ft. )
4 BHK149.45 Sq.mts. ( 1609 Sq.ft. )
4 BHK150.25 Sq.mts. ( 1617 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Auris Serenity Tower 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Approx 4420.71Sq.Mtr Rg To Be Handed Over To Apex
Childrens Play Area
To Be Handed Over To Apex Body
Club House with Gymnasium Steam and Sauna
To Be Handed Over To Apex Body
Community Buildings
Na
Counter for Refreshment Bar
To Be Handed Over To Apex Body
Electrical Meter Room, Sub-Station, Receiving Station10% completed
10% Complete
Receiving Station To Be Handed Over To Apex
Energy management15% completed
15% Complete
As Per Moef Requirement To Be Handed Over To Apex
Fire Protection And Fire Safety Requirements35% completed
35% Complete
As Per Cfo To Be Handed Over To Apex Body
Grill Bar
To Be Handed Over To Apex Body
Landscaping & Tree Planting
Proposed On Edeck To Be Handed Over To Apex Body
Open Parking
Na
Outdoor Pavillion
To Be Handed Over To Apex Body
Podium RCC Structure for Tower 2
To Be Handed Over To Apex Body
Pool Deck
To Be Handed Over To Apex Body
Senior Citizen Corner
To Be Handed Over To Apex Body
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Stp To Be Handed Over To Apex Body
Solid Waste Management And Disposal
Garbage Room To Be Handed Over To Apex Body
Storm Water Drains10% completed
10% Complete
Swd To Be Handed Over To Apex Body
Street Lighting
Na
Swimming Pool
To Be Handed Over To Apex Body
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
As Per Moef Requirement To Be Handed Over To Apex
Water Conservation, Rain water Harvesting15% completed
15% Complete
Rwh Only To Be Handed Over To Apex Body
Water Supply
Bmc Water Connection To Be Handed Over To Apexbody
Buildings / Wings in Auris Serenity Tower 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Auris Serenity Tower 2 by Transcon-Sheth Creators Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9937 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

340 apartments in total
Total
340
Booked
339
Available
1

Saleable Area Statistics (Sq. ft.)

369252 Total
Total
369252
Booked
368447
Available
805
Total 340 apartments in project. 339 apartments booked. 99% apartments booked.
Total 369252 Sq.ft. saleable area. 368447 saleable area booked.
100% area booked.

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Dec 20226210160558
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK74.25 Sq.mts. ( 799 Sq.ft. )30
30 Booked100% Booked
100% Booked
2 BHK74.8 Sq.mts. ( 805 Sq.ft. )86
85 Booked98% Booked
98% Booked
2 BHK75 Sq.mts. ( 807 Sq.ft. )58
58 Booked100% Booked
100% Booked
3 BHK110.8 Sq.mts. ( 1193 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK111.7 Sq.mts. ( 1202 Sq.ft. )43
43 Booked100% Booked
100% Booked
3 BHK121.9 Sq.mts. ( 1312 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK122.75 Sq.mts. ( 1321 Sq.ft. )37
37 Booked100% Booked
100% Booked
4 BHK149.45 Sq.mts. ( 1609 Sq.ft. )15
15 Booked100% Booked
100% Booked
4 BHK150.25 Sq.mts. ( 1617 Sq.ft. )43
43 Booked100% Booked
100% Booked
340 total apartments / 339 apartments booked. 99% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Transcon-Sheth Creators Private Limited
for Project
Auris Serenity Tower 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation