Project overview

Auris Bliss is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000970. Auris Bliss is located at Cts No. 3654 3653 3652 3651 365 366 367 368 371 Pt. This is a Ongoing being developed by Transcon-Sheth Creators Private Limited.

Auris Bliss has 2 BHK & 2ANDHALF BHK Apartments with carpet areas ranging from 614 to 792 Sq.ft. Carpet. The Project has total 310 of which 1 are currently available for sale.

Auris Bliss is being developed on a total land area of 8410 Sq.ft. Auris Bliss has 1 Wings / Towers Auris Bliss

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Auris Bliss
  • Location:
  • Cts No. 3654 3653 3652 3651 365 366 367 368 371 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Transcon-Sheth Creators Private Limited
  • Phone:
  • Address:
  • Waterford Building
Project RERA Details
MAHA REARA No: P51800000970
Project Type Others
RERA Project Status Ongoing
Architect Vilas Kharche
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Last Modified 02 Nov 2017
Last Retrived 26 Jul 2025
Auris Bliss QR Code
Auris Bliss
MahaRERA - P51800000970
Apartment Details & Configuration
TypeArea
2 BHK57 Sq.mts. ( 614 Sq.ft. )
2 BHK61.3 Sq.mts. ( 660 Sq.ft. )
2ANDHALF BHK73.55 Sq.mts. ( 792 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Auris Blisslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
.
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Sub Station Only
Energy management
As Per Moef Requirements
Fire Protection And Fire Safety Requirements
As Per Cfo Requirements
GYMNASIUM AND SWIMMING POOL
.
Landscaping & Tree Planting
Proposed On E-Deck
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp
Solid Waste Management And Disposal
.
Storm Water Drains10% completed
10% Complete
Swd
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Stp
Water Conservation, Rain water Harvesting50% completed
50% Complete
Rwh Only
Water Supply
Bmc Water Connection
Buildings / Wings in Auris Bliss
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Auris Bliss by Transcon-Sheth Creators Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8410 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

310 apartments in total
Total
310
Booked
309
Available
1

Saleable Area Statistics (Sq. ft.)

198456 Total
Total
198456
Booked
197842
Available
614
Total 310 apartments in project. 309 apartments booked. 99% apartments booked.
Total 198456 Sq.ft. saleable area. 197842 saleable area booked.
100% area booked.

Auris Bliss

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Auris BlissDec 20234311170493
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57 Sq.mts. ( 614 Sq.ft. )200
199 Booked99% Booked
99% Booked
2 BHK61.3 Sq.mts. ( 660 Sq.ft. )86
86 Booked100% Booked
100% Booked
2ANDHALF BHK73.55 Sq.mts. ( 792 Sq.ft. )24
24 Booked100% Booked
100% Booked
310 total apartments / 309 apartments booked. 99% apartments booked.
Work Description in Building Auris BlissCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress45% done
45% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress45% done
45% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress82% done
82% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Transcon-Sheth Creators Private Limited
for Project
Auris Bliss
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation