Project overview

Aureate is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800023266. Aureate is located at Near Old Post Office Village Kanjur Bhandup W. This is a New Project being developed by Beauty Ganraj Construction Llp.

Aureate has 1 BHK, 2 BHK, Office space & Shop Apartments with carpet areas ranging from 2162 to 507 Sq.ft. Carpet. The Project has total 48 of which 48 are currently available for sale.

Aureate is being developed on a total land area of 34576 Sq.ft. out of which 1477 Sq.ft. i.e 4% is reserved for recreational purposes. Aureate has 1 Wings / Towers Aureate

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Aureate
  • Location:
  • Near Old Post Office Village Kanjur Bhandup W
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Beauty Ganraj Construction Llp
  • Phone:
  • Address:
  • Cts No 149,149/1, Beuaty Landmark, Jangal Mangal Road, Near Beauty Heights, Bhandup, 400078
Project RERA Details
MAHA REARA No: P51800023266
Project Type Residential
RERA Project Status New Project
Funding Bank INDUSIND BANK
Proposed Possession 30 Dec 2025
Revised Possession
Extended Possession
Litigations Yes
Last Modified 24 Jan 2023
Last Retrived 28 Jul 2025
Aureate QR Code
Aureate
MahaRERA - P51800023266
Apartment Details & Configuration
TypeArea
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )
2 BHK47.06 Sq.mts. ( 507 Sq.ft. )
Office space200.89 Sq.mts. ( 2162 Sq.ft. )
Shop37.58 Sq.mts. ( 405 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aureatelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Proposed Rg
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Substation Commenced
Energy management
Na
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply
Work Not Strted
Buildings / Wings in Aureate
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aureate by Beauty Ganraj Construction Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

34576 Sq. ft.

Project Area

1477 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

48 apartments in total
Total
48
Booked
0
Available
48

Saleable Area Statistics (Sq. ft.)

21635 Total
Total
21635
Booked
0
Available
21635
Total 48 apartments in project. 0 apartments booked. 0% apartments booked.
Total 21635 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Aureate

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AureateDec 2024211110045
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )30
None Booked0% Booked
0% Booked
2 BHK47.06 Sq.mts. ( 507 Sq.ft. )16
None Booked0% Booked
0% Booked
Office space200.89 Sq.mts. ( 2162 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop37.58 Sq.mts. ( 405 Sq.ft. )1
None Booked0% Booked
0% Booked
48 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building AureateCompletion
Excavation
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Beauty Ganraj Construction Llp
for Project
Aureate
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation