Project overview

Atmiya Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700024195. Atmiya Residency is located at Plot 75/2 And 77 And 74 And 75/1. This is a New being developed by Akshar Infra.

Atmiya Residency has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 219 to 395 Sq.ft. Carpet. The Project has total 234 of which 214 are currently available for sale.

Atmiya Residency is being developed on a total land area of 72657 Sq.ft. Atmiya Residency has 3 Wings / Towers A Wing,B-Wing,C-Wing

ProjectDeveloperLocationPossession
Deep Laxmi HeightDeeplaxmi HeightsBhiwandi30-12-2024 00:00:00
Lodha Bellavista - Wing B1Macrotech Developers LimitedGat No.61/1/1,2,3,4 30-12-2025 00:00:00
Fennelia CommercialAcme Housing India Private LimitedGat No 61/1/1,2,330-12-2025 00:00:00
Nasheman-E-ZohraM M Builders &Amp; Developers421302, Thane, Bhiwandi01-03-2026 00:00:00
Sun City Phase ISunrise DevelopersThane15-03-2026 00:00:00
Shree Ganesha EnterprisesShree Ganesha EnterprisesThane, Kopar30-12-2022 00:00:00
Sai Vaibhav ParadiseShree Sai DevelopersOld Survey No. 165, New Survey No. 26 Hissa No.330-06-2022 00:00:00
Salasar Exotica - ISalasar AssociatesSurvey No 7630-06-2025 00:00:00
Pushkar Co Op Hsg Society PraposedAmeya DevelopersCts No 823 824 S No 93A Plot No 88 8912-02-2024 00:00:00
Centrum Business Square Phase 1Squarefeet ConstructionD 130-06-2027 00:00:00
Shruti ApartmentVikrant V Raikar Huf - -Plot No 9 Sector 23 Ghansoli30-11-2023 00:00:00
Jasmine ResidencyA.A.Corp.Survey No 5/9 5/10 6/6A 6/724-11-2025 00:00:00
Sai Aashiyana - IiSai Sakshi DevelopersSurvey No 81 5 A 81 5 B30-06-2026 00:00:00
Aashray Aanand Phase-IiDream CorprationS.No-140/2A,141/1B And 141/1/E/5/B/130-11-2022 00:00:00
Maatr WatersMaatr Enterprises24/1 12/430-09-2023 00:00:00
Bhagwat And Jay VyankateshChaturthi Vastu Developers804 A B30-06-2027 00:00:00
Khushi ApartmentPavan Hastimal JainPlot No 113 22-05-2023 00:00:00
Shree Mangalmurti Builders And DevelopersVasanti Kashinath ChaudhariS No 65/4/1 Part Plot No 1130-09-2022 00:00:00
Larkins 315 Fio-AM/S Pushpak Developers31531-12-2024 00:00:00
Siddhakala HeightsRushabh Developers40060430-06-2024 00:00:00
Samruddhi ResidencyShree Sai Ganesh Developers16630-06-2025 00:00:00
Satyam Seven SkiesJai Jalaram EnterprisesPlot No.7A, Sector 17, Kharghar30-06-2024 00:00:00
Sai Kripa ResidencyGokuldham Builders &Amp; DevelopersThane, 42100310-04-2024 00:00:00
Indra NeelSonam Spark Infra Private Limited444/2B30-06-2026 00:00:00
Mahalaxmi ResidencySanjay Vasant ThakkarTika No 12 Cts No 59A30-06-2023 00:00:00
L M TowerL M Realty110/8, 110/1228-08-2023 00:00:00
Wisteria Square 1Rajdeep Realtors & Developers Pvt LtdS No 105 1 Pt And 2 Pt30-06-2024 00:00:00
Srushti Residency Building EPappu Developers & GroupS. No 69-21 And 28-3130-06-2024 00:00:00
Panvelkar PrestigeEshan DevelopersGut No 11 Plot No 13 14 15 16 17 18 19 20 21 Pt Cts No 928830-06-2024 00:00:00
Gulmohar Pink CityAmi Buildcon935330-06-2023 00:00:00
Kings CourtAmi Sai Construction35230-06-2023 00:00:00
Sector 2A - Wing BEversmile Properties Private LimitedNew Survey No 66Pt And 68Pt Of Village Penkarpada30-12-2027 00:00:00
Al Amin TowerS V BuildersBhiwandi30-06-2023 00:00:00
Hema KunjBhadrankar Enterprises LlpCts No 1618, New Survey No 359, H. Nos 2/1D And 1F28-08-2023 00:00:00
Maatr SkyeMaatr Ventures78/2/130-09-2025 00:00:00
Chadha ResidencyChadha Developers And PromotersG.No 21, 1361,2 G.No. 1386, 1410 At Karav G.No 262,3,4 G.No 281B,1C,1D,1E,2A,2B,2C,2D,4 And G.No 324,343,371,230-09-2026 00:00:00
Rai S NisargRai Residency Private LimitedKalyan E31-12-2025 00:00:00
The Icon Phase 3Leading Frontier Private Limited61/2F, 61/2G31-12-2026 00:00:00
The Icon Phase 4Leading Frontier Private Limited6021, 602231-12-2026 00:00:00
Jadhav GadhShree Samarth DevelopersSr No 13 H No 1031-12-2022 00:00:00
Sector 2A - Wing AEversmile Properties Private LimitedNew Survey No.68 Pt Of Village Penkarpada30-06-2027 00:00:00
Arihant City Phase-Ii - A BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Arihant City Phase-Ii - B BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Arihant City Phase-Ii - C BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Shree Mauli PrabhaShree Prabha ConstructionCts No 8872 8873 Plot No 2031-07-2024 00:00:00
Project Details
  • Project:
    Atmiya Residency
  • Location:
  • Plot 75/2 And 77 And 74 And 75/1
  • Const. Stage:
    New
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Akshar Infra
  • Phone:
  • Address:
  • Swagat Chs
Project RERA Details
MAHA REARA No: P51700024195
Project Type Residential / Group Housing
RERA Project Status New
Architect Destination Architecture Interior Design
Funding Bank BANK OF INDIA
Proposed Possession 30 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Jan 2020
Last Retrived 26 Jul 2025
Atmiya Residency QR Code
Atmiya Residency
MahaRERA - P51700024195
Apartment Details & Configuration
TypeArea
1 BHK25.56 Sq.mts. ( 275 Sq.ft. )
1 BHK25.95 Sq.mts. ( 279 Sq.ft. )
1 BHK26.24 Sq.mts. ( 282 Sq.ft. )
1 BHK26.53 Sq.mts. ( 286 Sq.ft. )
1 BHK27.09 Sq.mts. ( 292 Sq.ft. )
1 BHK28.58 Sq.mts. ( 308 Sq.ft. )
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )
1RK26.05 Sq.mts. ( 280 Sq.ft. )
1RK20.02 Sq.mts. ( 215 Sq.ft. )
1RK20.15 Sq.mts. ( 217 Sq.ft. )
1RK22.15 Sq.mts. ( 238 Sq.ft. )
1 BHK25.03 Sq.mts. ( 269 Sq.ft. )
1 BHK25.07 Sq.mts. ( 270 Sq.ft. )
1 BHK25.57 Sq.mts. ( 275 Sq.ft. )
1 BHK26.39 Sq.mts. ( 284 Sq.ft. )
1 BHK26.99 Sq.mts. ( 291 Sq.ft. )
1 BHK27.16 Sq.mts. ( 292 Sq.ft. )
1 BHK27.34 Sq.mts. ( 294 Sq.ft. )
1 BHK27.62 Sq.mts. ( 297 Sq.ft. )
1 BHK27.83 Sq.mts. ( 300 Sq.ft. )
1RK19.66 Sq.mts. ( 212 Sq.ft. )
1RK20.4 Sq.mts. ( 220 Sq.ft. )
1 BHK25.33 Sq.mts. ( 273 Sq.ft. )
1 BHK25.53 Sq.mts. ( 275 Sq.ft. )
1 BHK26.4 Sq.mts. ( 284 Sq.ft. )
1 BHK27.05 Sq.mts. ( 291 Sq.ft. )
1 BHK27.93 Sq.mts. ( 301 Sq.ft. )
1 BHK28.12 Sq.mts. ( 303 Sq.ft. )
1RK20.39 Sq.mts. ( 219 Sq.ft. )
1RK24.18 Sq.mts. ( 260 Sq.ft. )
2 BHK33.82 Sq.mts. ( 364 Sq.ft. )
2 BHK34.6 Sq.mts. ( 372 Sq.ft. )
2 BHK35.36 Sq.mts. ( 381 Sq.ft. )
2 BHK35.43 Sq.mts. ( 381 Sq.ft. )
2 BHK36.43 Sq.mts. ( 392 Sq.ft. )
2 BHK36.67 Sq.mts. ( 395 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Atmiya Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Commenced
Community Buildings
Not Commenced.Will Be Provided As Per Kbmc Norms.
Electrical Meter Room, Sub-Station, Receiving Station
Not Commenced. Will Be Provided As Per Kbmc Norms.
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Commenced.Will Be Provided As Per Kbmc Norms.
Landscaping & Tree Planting
Not Commenced.Will Be Provided As Per Kbmc Norms.
Open Parking
Not Commenced
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Commenced.Will Be Provided As Per Kbmc Norms.
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Commenced.Will Be Provided As Per Kbmc Norms.
Street Lighting
Not Commenced.Will Be Provided As Per Kbmc Norms.
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Commenced.Will Be Provided As Per Kbmc Norms.
Water Supply
Not Commenced
Buildings / Wings in Atmiya Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Atmiya Residency by Akshar Infralast updated on 26 Jul 2025 as per information obtained from MARA RERA.

72657 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

234 apartments in total
Total
234
Booked
20
Available
214

Saleable Area Statistics (Sq. ft.)

63414 Total
Total
63414
Booked
4681
Available
58733
Total 234 apartments in project. 20 apartments booked. 8% apartments booked.
Total 63414 Sq.ft. saleable area. 4681 saleable area booked.
7% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 20248101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.56 Sq.mts. ( 275 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK25.95 Sq.mts. ( 279 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK26.24 Sq.mts. ( 282 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK26.53 Sq.mts. ( 286 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK27.09 Sq.mts. ( 292 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK28.58 Sq.mts. ( 308 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK26.05 Sq.mts. ( 280 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK20.02 Sq.mts. ( 215 Sq.ft. )28
None Booked0% Booked
0% Booked
1RK20.15 Sq.mts. ( 217 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK22.15 Sq.mts. ( 238 Sq.ft. )3
None Booked0% Booked
0% Booked
84 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

B-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B-WingDec 20248101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.03 Sq.mts. ( 269 Sq.ft. )7
3 Booked42% Booked
42% Booked
1 BHK25.07 Sq.mts. ( 270 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK25.57 Sq.mts. ( 275 Sq.ft. )3
1 Booked33% Booked
33% Booked
1 BHK26.39 Sq.mts. ( 284 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK26.99 Sq.mts. ( 291 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.16 Sq.mts. ( 292 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK27.34 Sq.mts. ( 294 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK27.62 Sq.mts. ( 297 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK27.83 Sq.mts. ( 300 Sq.ft. )6
None Booked0% Booked
0% Booked
1RK19.66 Sq.mts. ( 212 Sq.ft. )3
2 Booked66% Booked
66% Booked
1RK20.4 Sq.mts. ( 220 Sq.ft. )25
12 Booked48% Booked
48% Booked
77 total apartments / 20 apartments booked. 25% apartments booked.
Work Description in Building B-WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C-WingDec 20248101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.33 Sq.mts. ( 273 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK25.53 Sq.mts. ( 275 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK26.4 Sq.mts. ( 284 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK27.05 Sq.mts. ( 291 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK27.93 Sq.mts. ( 301 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK28.12 Sq.mts. ( 303 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK25.53 Sq.mts. ( 275 Sq.ft. )8
None Booked0% Booked
0% Booked
1RK20.39 Sq.mts. ( 219 Sq.ft. )12
None Booked0% Booked
0% Booked
1RK24.18 Sq.mts. ( 260 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK33.82 Sq.mts. ( 364 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK34.6 Sq.mts. ( 372 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK35.36 Sq.mts. ( 381 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK35.43 Sq.mts. ( 381 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK36.43 Sq.mts. ( 392 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK36.67 Sq.mts. ( 395 Sq.ft. )3
None Booked0% Booked
0% Booked
73 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C-WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Akshar Infra
for Project
Atmiya Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation