Atmaram Plaza is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000003881. Atmaram Plaza is located at 327. This is a Ongoing being developed by Shreeyan Developers.

Atmaram Plaza has 1 BHK & 2 BHK Apartments with carpet areas ranging from 331 to 472 Sq.ft. Carpet. The Project has total 55 of which 43 are currently available for sale.

Atmaram Plaza is being developed on a total land area of 35091 Sq.ft. out of which 1469 Sq.ft. i.e 4% is reserved for recreational purposes. Atmaram Plaza has 1 Wings / Towers Atmaram Plaza

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Atmaram Plaza
  • Location:
  • 327
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Shreeyan Developers
  • Phone:
  • Address:
  • Padmini Sadan
Project RERA Details
MAHA REARA No: P99000003881
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sameer Desai
Funding Bank STATE BANK OF INDIA
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 06 Aug 2017
Last Retrived 28 Jul 2025
Atmaram Plaza QR Code
Atmaram Plaza
MahaRERA - P99000003881
Apartment Details & Configuration
TypeArea
1 BHK30.72 Sq.mts. ( 331 Sq.ft. )
1 BHK32.48 Sq.mts. ( 350 Sq.ft. )
2 BHK40.91 Sq.mts. ( 440 Sq.ft. )
2 BHK41.78 Sq.mts. ( 450 Sq.ft. )
2 BHK43.88 Sq.mts. ( 472 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Atmaram Plazalast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Work In Progress
Landscaping & Tree Planting
Work In Progress
Open Parking15% completed
15% Complete
More Parking Availabe For Two Wheeler
Sewerage (Chamber, Lines, Septic Tank , STP)
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work In Progress
Water Supply
Vvcmc Water Supply After Oc
Buildings / Wings in Atmaram Plaza
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Atmaram Plaza by Shreeyan Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

35091 Sq. ft.

Project Area

1469 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

55 apartments in total
Total
55
Booked
12
Available
43

Saleable Area Statistics (Sq. ft.)

20477 Total
Total
20477
Booked
4713
Available
15765
Total 55 apartments in project. 12 apartments booked. 21% apartments booked.
Total 20477 Sq.ft. saleable area. 4713 saleable area booked.
23% area booked.

Atmaram Plaza

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Atmaram PlazaJan 1900810101518
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.72 Sq.mts. ( 331 Sq.ft. )7
1 BHK32.48 Sq.mts. ( 350 Sq.ft. )34
2 BHK40.91 Sq.mts. ( 440 Sq.ft. )7
2 BHK41.78 Sq.mts. ( 450 Sq.ft. )5
2 Booked40% Booked
40% Booked
2 BHK43.88 Sq.mts. ( 472 Sq.ft. )2
2 Booked100% Booked
100% Booked
55 total apartments / 12 apartments booked. 21% apartments booked.
Work Description in Building Atmaram PlazaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shreeyan Developers
for Project
Atmaram Plaza
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation