Project overview
Atlanta Heights (A3) - 19Th Floor is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000923. Atlanta Heights (A3) - 19Th Floor is located at 194 B. This is a Ongoing being developed by Rare Townships Private Limited.
Atlanta Heights (A3) - 19Th Floor has 2 BHK, 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 634 to 1073 Sq.ft. Carpet. The Project has total 8 of which 1 are currently available for sale.
Atlanta Heights (A3) - 19Th Floor is being developed on a total land area of 46722 Sq.ft. Atlanta Heights (A3) - 19Th Floor has 1 Wings / Towers Rising City - Atlanta Heights - Above 19Th Floor
| Project | Developer | Location | Possession |
| MAHA REARA No: |
P51800000923 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
Ongoing |
| Architect |
Citygold Management Service Private Limited |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
30 Dec 2024 |
| Revised Possession |
30 Dec 2024 |
| Extended Possession |
30 Dec 2025 |
| Litigations |
No Litigations |
| Last Modified |
11 Oct 2024 |
| Last Retrived |
26 Jul 2025 |
Atlanta Heights (A3) - 19Th Floor QR Code
Atlanta Heights (A3) - 19Th Floor
MahaRERA - P51800000923
| Type | Area |
| 2 BHK | 78.59 Sq.mts. ( 846 Sq.ft. ) |
| 2 BHK | 81 Sq.mts. ( 872 Sq.ft. ) |
| 2 BHK | 82.74 Sq.mts. ( 891 Sq.ft. ) |
| 2 BHK | 58.88 Sq.mts. ( 634 Sq.ft. ) |
| 2.5 BHK | 76.4 Sq.mts. ( 822 Sq.ft. ) |
| 3 BHK | 99.73 Sq.mts. ( 1073 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Atlanta Heights (A3) - 19Th Floorlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Layout Amenity |
|
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Layout Amenity |
|
|
|
Layout Amenity |
Fire Protection And Fire Safety
Requirements
|
|
Building / Layout Amenity |
Landscaping & Tree Planting
|
|
Layout Amenity |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Building / Layout Amenity |
Solid Waste Management And Disposal
|
|
Layout Amenity |
|
|
|
Layout Amenity |
|
|
|
Layout Amenity |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Layout Amenity |
Water Conservation, Rain water Harvesting
|
|
Layout Amenity |
|
|
|
Building / Layout Amenity |
Buildings / Wings in Atlanta Heights (A3) - 19Th Floor
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Atlanta Heights (A3) - 19Th Floor by Rare Townships Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
8
apartments in total
Saleable Area Statistics (Sq. ft.)
6662
Total
Total 8 apartments in project. 7 apartments booked. 87% apartments booked.
Total 6662 Sq.ft. saleable area. 5840 saleable area booked.
88% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Rising City - Atlanta Heights - Above 19Th Floor | Dec 2023 | 1 | 1 | 0 | 1 | 2 | 1 | 9 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 78.59 Sq.mts. ( 846 Sq.ft. ) | 1 | |
| 2 BHK | 81 Sq.mts. ( 872 Sq.ft. ) | 1 | |
| 2 BHK | 82.74 Sq.mts. ( 891 Sq.ft. ) | 2 | |
| 2 BHK | 58.88 Sq.mts. ( 634 Sq.ft. ) | 2 | |
| 2.5 BHK | 76.4 Sq.mts. ( 822 Sq.ft. ) | 1 | |
| 3 BHK | 99.73 Sq.mts. ( 1073 Sq.ft. ) | 1 | |
8 total apartments / 7 apartments booked. 87% apartments booked. |
| Work Description in Building Rising City - Atlanta Heights - Above 19Th Floor | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Rare Townships Private Limited
for Project
Atlanta Heights (A3) - 19Th Floor
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |