Project overview

Athena Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006924. Athena Enclave is located at Sno 9 Hno 3/1/2/2/A. This is a Ongoing being developed by Jai Mata Di Developers.

Athena Enclave has 1 BHK & 2 BHK Apartments with carpet areas ranging from 384 to 550 Sq.ft. Carpet. The Project has total 62 of which 13 are currently available for sale.

Athena Enclave is being developed on a total land area of 22820 Sq.ft. Athena Enclave has 3 Wings / Towers Athena Enclave Type A1,Athena Enclave Type B,Avantika Building Type A

ProjectDeveloperLocationPossession
Greenworld Developers Pvt. LtdGreenworld Devlopers Pvt. Ltd.2990 Pt A30-06-2021 00:00:00
ShivamGagan Developers & EngineersSurvey No 46 Hissa No.16 P31-03-2019 00:00:00
GeetanjaliHonest Homes16/11 18/3 19/1531-12-2019 00:00:00
Keshar Aagan Cooperative Housing SocietyGagan HomesPlot No 14/6 Survey No 42/A30-09-2026 00:00:00
Balaji AquaBalaji WorldOld Survey No. 39, Hissa No- 3/2/A, 3/2/C, 3/2/D05-11-2029 00:00:00
V Ten ResidencyV Ten Realty Private LimitedSurvey No 105 Hissa No 1 Village Chikanghar Kalyan 30-12-2020 00:00:00
Mangeshi FloraOm Realty123 7 2 123 231-03-2019 00:00:00
Shivaay ResidencyRohan Krishnapalsingh ThakurS.No. 42/14/B/C30-06-2019 00:00:00
Shrushti AvenueKishore DesaiThane, 42130131-12-2017 00:00:00
Nirman HeightsNirman HabitatsS No 12,Hissa No 4,Plot No531-08-2018 00:00:00
Ashapura PrasadAshapura Nirman DevelopersCts No. 7380 To 7384 And 7389, Survey No. 4231-12-2018 00:00:00
Balaji Exotica-Phase 1Balaji WorldSurvey No-16,H.No-8/2,Plot No-230-12-2022 00:00:00
Disha Co Operative Housing Society LtdGagan Developers And EngineersSurvey No 19 Hissa No 13 Part31-01-2020 00:00:00
Chavan AdvaitamSaideep ConstructionsS.No.9 H.No. 3/1/2/2/C/1, 3/1/2/2/C/2 & S. No.15 H.No.4/131-12-2026 00:00:00
Pancham Co. Operative Hsg SocietyYuvraj Constructions131(P)30-06-2025 00:00:00
Patel MountPatel Group & CoS.No.42A, Hissa No. 2(Pt),3(Pt),(4Pt),7(Pt),8(Pt),9(Pt),24(Pt)30-06-2024 00:00:00
Gayatri NiwasGayatri Builders2991231-12-2025 00:00:00
Suviam Pearl Phase ILaxmi Construction CoSurvey No.36, Hissa No.3/131-12-2026 00:00:00
Bhakti WindsorBhakti Realtors121/3B31-10-2026 00:00:00
Om Yashlaxmi ApartmentOm Developers1135B/ 1136 / 113731-12-2019 00:00:00
Jigar Construction VenusPraful Haribhai SenjaliaSurvey No 110 / 1A And 1B31-03-2019 00:00:00
Tycoons Square Avenue Iii Tower CTycoons Avanti Projects Llp421301, Thane31-07-2020 00:00:00
Mauli PrideMauli Krupa DevelopersSurvey No- 21, Hissa No- A01-12-2027 00:00:00
Empire TowerEkadanta DevelopersS No. 110/1A/1B/8 Plot No 9,1031-12-2026 00:00:00
Om VardhastaZk RealtySurvey No 12, Hissa No 4/R31-12-2027 00:00:00
Patels OrionDesire RealtySurvey No 86/1/131-03-2030 00:00:00
Manali Heights A WingMitali Construction1/4, 121/7B31-12-2018 00:00:00
Athena EnclaveJai Mata Di DevelopersSno 9 Hno 3/1/2/2/A30-12-2023 00:00:00
The Chalets AvenueAssets Reality12/130-11-2018 00:00:00
Ami Darshan E WingAarohi Development Corporation99-A1/2,99B31-12-2017 00:00:00
Atmaram Kene ResidencyMega DevelopersSn 82/7 And Sn 87/831-12-2018 00:00:00
Pluto C WingBhakti RealtoraB/123/1A31-12-2017 00:00:00
Patel Colossus Phase IiPatel Group & CoSurvey No. 42A, H.N. 2 Pt, 3, Pt, 4 Pt, 7 Pt, 8 Pt, 9Pt30-12-2023 00:00:00
AmikrupaAarohi Development Corporation99-A12,99B30-09-2020 00:00:00
Namdev ViharNamdev ConstructionS.No. 121 H.No. 7A2 7A330-12-2021 00:00:00
Capsule Business HubMaa Vaishnavi Builders & Developers2848A/1/130-06-2021 00:00:00
Sai VyankateshAnjana Sahebrao ChavanS No 16 H No 7 And S No 19 H No 130-06-2021 00:00:00
Patel Colossus - Phase IiiPatel Group & CoSurvey No. 42A, H.No. 2 Pt, 3 Pt, 4 Pt, 7 Pt, 8Pt, 9 Pt, 24Pt30-12-2023 00:00:00
Patel Colossus Phase 1Patel Group & CoS. No. 42 A, H.N 2 Pt, 3 Pt, 4 Pt, 7 Pt, 8 Pt, 9 Pt, 24 Pt30-12-2022 00:00:00
Bharat Residency Shivsai Builders & DevelopersS No 84 H No 7 /11 B31-05-2018 00:00:00
Jalal MansionMaryam Enterprises1545,154931-12-2018 00:00:00
Shiv SiddhiKedar ConstructionSurvey No 1 Hissa No 3/A-130-06-2023 00:00:00
Project Details
  • Project:
    Athena Enclave
  • Location:
  • Sno 9 Hno 3/1/2/2/A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Jai Mata Di Developers
  • Phone:
  • Address:
  • Athena Complex
Project RERA Details
MAHA REARA No: P51700006924
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Anil R Nirgude
Funding Bank INDUSIND BANK
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 16 Aug 2017
Last Retrived 26 Jul 2025
Athena Enclave QR Code
Athena Enclave
MahaRERA - P51700006924
Apartment Details & Configuration
TypeArea
1 BHK35.65 Sq.mts. ( 384 Sq.ft. )
2 BHK51.13 Sq.mts. ( 550 Sq.ft. )
2 BHK47.1 Sq.mts. ( 507 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Athena Enclavelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Done
Energy management
Not Done
Fire Protection And Fire Safety Requirements
Not Done
Landscaping & Tree Planting
Not Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Done
Solid Waste Management And Disposal
Not Done
Storm Water Drains
Not Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Not Done
Water Conservation, Rain water Harvesting
Not Done
Water Supply
Not Done
Buildings / Wings in Athena Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Athena Enclave by Jai Mata Di Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

22820 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

62 apartments in total
Total
62
Booked
49
Available
13

Saleable Area Statistics (Sq. ft.)

26074 Total
Total
26074
Booked
20629
Available
5445
Total 62 apartments in project. 49 apartments booked. 79% apartments booked.
Total 26074 Sq.ft. saleable area. 20629 saleable area booked.
79% area booked.

Athena Enclave Type A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Athena Enclave Type A1Dec 202281012000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.65 Sq.mts. ( 384 Sq.ft. )18
10 Booked55% Booked
55% Booked
2 BHK51.13 Sq.mts. ( 550 Sq.ft. )6
4 Booked66% Booked
66% Booked
24 total apartments / 14 apartments booked. 58% apartments booked.
Work Description in Building Athena Enclave Type A1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Athena Enclave Type B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Athena Enclave Type BJun 202371016000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.65 Sq.mts. ( 384 Sq.ft. )11
9 Booked81% Booked
81% Booked
2 BHK47.1 Sq.mts. ( 507 Sq.ft. )5
4 Booked80% Booked
80% Booked
16 total apartments / 13 apartments booked. 81% apartments booked.
Work Description in Building Athena Enclave Type BCompletion
Basement (if any)
work-in-progress50% done
50% Booked
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress50% done
50% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress50% done
50% Booked
X number of Podiums
X number of Slabs of Super Structure

Avantika Building Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Avantika Building Type ADec 202261012000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.65 Sq.mts. ( 384 Sq.ft. )18
18 Booked100% Booked
100% Booked
2 BHK51.13 Sq.mts. ( 550 Sq.ft. )4
4 Booked100% Booked
100% Booked
22 total apartments / 22 apartments booked. 100% apartments booked.
Work Description in Building Avantika Building Type ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress48% done
48% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jai Mata Di Developers
for Project
Athena Enclave
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation