Project overview

Ashtavinayak Homes is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000017084. Ashtavinayak Homes is located at Plot No. 1 To 7, Of Survey No. 1316B . This is a New being developed by R.K. Builders & Developers.

Ashtavinayak Homes has 1 BHK Apartments with carpet areas ranging from 342 to 433 Sq.ft. Carpet. The Project has total 118 of which 52 are currently available for sale.

Ashtavinayak Homes is being developed on a total land area of 75414 Sq.ft. out of which 7526 Sq.ft. i.e 10% is reserved for recreational purposes. Ashtavinayak Homes has 4 Wings / Towers Girijatmaj- Type A1,Mahaganpati- Type B,Siddhivinayak- Type A,Vighneshwar- Type B1

ProjectDeveloperLocationPossession
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Shiv Aangan ResidencyDhananjay DevelopersSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
Nana Patil ResidencyQuality Builders & DevelopersPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
Satyam OrchidGirija InfrastructurePlot No 1030-12-2021 00:00:00
Fiora EMacrotech Developers Limited260/1A (Pt)31-03-2026 00:00:00
Savaliya HeightsShree Savaliya Homes LlpOld Sno 477 New Sno 119 Hno 131-12-2026 00:00:00
Ramakant ArcadeVastu EnterprisesCts No. 244, 25431-05-2023 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Project Details
  • Project:
    Ashtavinayak Homes
  • Location:
  • Plot No. 1 To 7, Of Survey No. 1316B
  • Const. Stage:
    New
  • Possession:
    28 Aug 2022
Developer Details

  • Developer:
    R.K. Builders & Developers
  • Phone:
  • Address:
  • Kanchan Kunj
Project RERA Details
MAHA REARA No: P99000017084
Project Type Residential / Group Housing
RERA Project Status New
Architect Gauresh P Navalkar
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 28 Aug 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Jul 2018
Last Retrived 28 Jul 2025
Ashtavinayak Homes QR Code
Ashtavinayak Homes
MahaRERA - P99000017084
Apartment Details & Configuration
TypeArea
1 BHK31.73 Sq.mts. ( 342 Sq.ft. )
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )
1 BHK31.91 Sq.mts. ( 343 Sq.ft. )
1 BHK32 Sq.mts. ( 344 Sq.ft. )
1 BHK32.04 Sq.mts. ( 345 Sq.ft. )
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )
1 BHK37.66 Sq.mts. ( 405 Sq.ft. )
1 BHK31.48 Sq.mts. ( 339 Sq.ft. )
1 BHK31.79 Sq.mts. ( 342 Sq.ft. )
1 BHK39.64 Sq.mts. ( 427 Sq.ft. )
1RK22.13 Sq.mts. ( 238 Sq.ft. )
1RK22.36 Sq.mts. ( 241 Sq.ft. )
Shop6.13 Sq.mts. ( 66 Sq.ft. )
Shop9.43 Sq.mts. ( 102 Sq.ft. )
Shop10.87 Sq.mts. ( 117 Sq.ft. )
Shop12.13 Sq.mts. ( 131 Sq.ft. )
Shop18.81 Sq.mts. ( 202 Sq.ft. )
1 BHK27.71 Sq.mts. ( 298 Sq.ft. )
Shop8.73 Sq.mts. ( 94 Sq.ft. )
Shop13.7 Sq.mts. ( 147 Sq.ft. )
Shop13.86 Sq.mts. ( 149 Sq.ft. )
Shop14.86 Sq.mts. ( 160 Sq.ft. )
Shop15.32 Sq.mts. ( 165 Sq.ft. )
1 BHK40.23 Sq.mts. ( 433 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ashtavinayak Homeslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Completed
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Ashtavinayak Homes
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ashtavinayak Homes by R.K. Builders & Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

75414 Sq. ft.

Project Area

7526 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

118 apartments in total
Total
118
Booked
66
Available
52

Saleable Area Statistics (Sq. ft.)

39083 Total
Total
39083
Booked
23468
Available
15615
Total 118 apartments in project. 66 apartments booked. 55% apartments booked.
Total 39083 Sq.ft. saleable area. 23468 saleable area booked.
60% area booked.

Girijatmaj- Type A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Girijatmaj- Type A1Aug 202161010111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.73 Sq.mts. ( 342 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.91 Sq.mts. ( 343 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK32 Sq.mts. ( 344 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.04 Sq.mts. ( 345 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK37.66 Sq.mts. ( 405 Sq.ft. )6
None Booked0% Booked
0% Booked
34 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Girijatmaj- Type A1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Mahaganpati- Type B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mahaganpati- Type BAug 202161010111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.48 Sq.mts. ( 339 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK31.79 Sq.mts. ( 342 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.91 Sq.mts. ( 343 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK39.64 Sq.mts. ( 427 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK22.13 Sq.mts. ( 238 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK22.36 Sq.mts. ( 241 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop6.13 Sq.mts. ( 66 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop9.43 Sq.mts. ( 102 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.87 Sq.mts. ( 117 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12.13 Sq.mts. ( 131 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop18.81 Sq.mts. ( 202 Sq.ft. )1
None Booked0% Booked
0% Booked
25 total apartments / 18 apartments booked. 72% apartments booked.
Work Description in Building Mahaganpati- Type BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Siddhivinayak- Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Siddhivinayak- Type AAug 2021610101150
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.71 Sq.mts. ( 298 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.91 Sq.mts. ( 343 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK32.04 Sq.mts. ( 345 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 BHK37.66 Sq.mts. ( 405 Sq.ft. )5
5 Booked100% Booked
100% Booked
Shop8.73 Sq.mts. ( 94 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.7 Sq.mts. ( 147 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.86 Sq.mts. ( 149 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.86 Sq.mts. ( 160 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop15.32 Sq.mts. ( 165 Sq.ft. )2
None Booked0% Booked
0% Booked
39 total apartments / 29 apartments booked. 74% apartments booked.
Work Description in Building Siddhivinayak- Type ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Vighneshwar- Type B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vighneshwar- Type B1Aug 202161010111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.79 Sq.mts. ( 342 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK31.91 Sq.mts. ( 343 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK40.23 Sq.mts. ( 433 Sq.ft. )4
4 Booked100% Booked
100% Booked
20 total apartments / 19 apartments booked. 95% apartments booked.
Work Description in Building Vighneshwar- Type B1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
R.K. Builders & Developers
for Project
Ashtavinayak Homes
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation