Project overview

Asavari Co Op Hsg Soc Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045809. Asavari Co Op Hsg Soc Ltd is located at Survye No 16. This is a New being developed by Trimity Constructions.

Asavari Co Op Hsg Soc Ltd has REHAB 2BHK, Sale 1BHK, SALE 2BHK & Sale 2BHK Apartments with carpet areas ranging from 348 to 490 Sq.ft. Carpet. The Project has total 14 of which 12 are currently available for sale.

Asavari Co Op Hsg Soc Ltd is being developed on a total land area of 5446 Sq.ft. out of which 4286 Sq.ft. i.e 79% is reserved for recreational purposes. Asavari Co Op Hsg Soc Ltd has 1 Wings / Towers Asavari Co Op Hsg Soc Ltd

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Asavari Co Op Hsg Soc Ltd
  • Location:
  • Survye No 16
  • Const. Stage:
    New
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Trimity Constructions
  • Phone:
  • Address:
  • Hubtown Rhythm Building
Project RERA Details
MAHA REARA No: P51700045809
Project Type Residential / Group Housing
RERA Project Status New
Architect Jitesh
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Jan 2025
Last Retrived 26 Jul 2025
Asavari Co Op Hsg Soc Ltd QR Code
Asavari Co Op Hsg Soc Ltd
MahaRERA - P51700045809
Apartment Details & Configuration
TypeArea
REHAB 2BHK45.52 Sq.mts. ( 490 Sq.ft. )
REHAB 2BHK45.33 Sq.mts. ( 488 Sq.ft. )
Sale 1BHK32.29 Sq.mts. ( 348 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Asavari Co Op Hsg Soc Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Asavari Co Op Hsg Soc Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Asavari Co Op Hsg Soc Ltd by Trimity Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5446 Sq. ft.

Project Area

4286 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

14 apartments in total
Total
14
Booked
2
Available
12

Saleable Area Statistics (Sq. ft.)

6705 Total
Total
6705
Booked
978
Available
5727
Total 14 apartments in project. 2 apartments booked. 14% apartments booked.
Total 6705 Sq.ft. saleable area. 978 saleable area booked.
15% area booked.

Asavari Co Op Hsg Soc Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Asavari Co Op Hsg Soc LtdDec 202481010141
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
REHAB 2BHK45.52 Sq.mts. ( 490 Sq.ft. )4
None Booked0% Booked
0% Booked
REHAB 2BHK45.33 Sq.mts. ( 488 Sq.ft. )4
None Booked0% Booked
0% Booked
Sale 1BHK32.29 Sq.mts. ( 348 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE 2BHK45.33 Sq.mts. ( 488 Sq.ft. )2
1 Booked50% Booked
50% Booked
Sale 2BHK45.52 Sq.mts. ( 490 Sq.ft. )3
1 Booked33% Booked
33% Booked
14 total apartments / 2 apartments booked. 14% apartments booked.
Work Description in Building Asavari Co Op Hsg Soc LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Trimity Constructions
for Project
Asavari Co Op Hsg Soc Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.