Project overview

Aryana Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800034432. Aryana Heights is located at 236-A Cts No5662 (Pt) F.P.No 311 A. This is a New being developed by M/S M Raveshia Realty Llp.

Aryana Heights has 2 BHK Apartments with carpet areas ranging from 537 to 667 Sq.ft. Carpet. The Project has total 60 of which 60 are currently available for sale.

Aryana Heights is being developed on a total land area of 8774 Sq.ft. Aryana Heights has 1 Wings / Towers Aryana Heights

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Aryana Heights
  • Location:
  • 236-A Cts No5662 (Pt) F.P.No 311 A
  • Const. Stage:
    New
  • Possession:
    31 Mar 2026
Developer Details

  • Developer:
    M/S M Raveshia Realty Llp
  • Phone:
  • Address:
  • Casablanca
Project RERA Details
MAHA REARA No: P51800034432
Project Type Residential / Group Housing
RERA Project Status New
Architect M/S K-Arch Planning - Elevation And Interior Architect
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Apr 2022
Last Retrived 26 Jul 2025
Aryana Heights QR Code
Aryana Heights
MahaRERA - P51800034432
Apartment Details & Configuration
TypeArea
2 BHK49.87 Sq.mts. ( 537 Sq.ft. )
2 BHK53.31 Sq.mts. ( 574 Sq.ft. )
2 BHK61.5 Sq.mts. ( 662 Sq.ft. )
2 BHK61.98 Sq.mts. ( 667 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aryana Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Planting As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Rcc Pipes With Inspection
Street Lighting
On Electricity Supply
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rwh Pits For Rainwater. Dual Water Supply
Water Supply
Municipal Water And Ground Water
Buildings / Wings in Aryana Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aryana Heights by M/S M Raveshia Realty Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8774 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

60 apartments in total
Total
60
Booked
0
Available
60

Saleable Area Statistics (Sq. ft.)

36597 Total
Total
36597
Booked
0
Available
36597
Total 60 apartments in project. 0 apartments booked. 0% apartments booked.
Total 36597 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Aryana Heights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Aryana HeightsMar 2026171210072
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK49.87 Sq.mts. ( 537 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK53.31 Sq.mts. ( 574 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK61.5 Sq.mts. ( 662 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK61.98 Sq.mts. ( 667 Sq.ft. )15
None Booked0% Booked
0% Booked
60 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Aryana HeightsCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
M/S M Raveshia Realty Llp
for Project
Aryana Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation