Project overview

Arthaya is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800052037. Arthaya is located at C.T.S. No.-673. This is a New being developed by Sri Artha Buildtech Private Limited.

Arthaya has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 405 to 743 Sq.ft. Carpet. The Project has total 208 of which 195 are currently available for sale.

Arthaya is being developed on a total land area of 18173 Sq.ft. out of which 1527 Sq.ft. i.e 8% is reserved for recreational purposes. Arthaya has 2 Wings / Towers Rehab Wing,Sale Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Arthaya
  • Location:
  • C.T.S. No.-673
  • Const. Stage:
    New
  • Possession:
    30 Apr 2028
Developer Details

  • Developer:
    Sri Artha Buildtech Private Limited
  • Phone:
  • Address:
  • Rumeet Apartments
Project RERA Details
MAHA REARA No: P51800052037
Project Type Others
RERA Project Status New
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Apr 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 19 Jul 2023
Last Retrived 26 Jul 2025
Arthaya QR Code
Arthaya
MahaRERA - P51800052037
Apartment Details & Configuration
TypeArea
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )
Shop14.83 Sq.mts. ( 160 Sq.ft. )
Shop16.96 Sq.mts. ( 183 Sq.ft. )
1 BHK37.65 Sq.mts. ( 405 Sq.ft. )
1 BHK41.07 Sq.mts. ( 442 Sq.ft. )
1 BHK44.99 Sq.mts. ( 484 Sq.ft. )
2 BHK51.97 Sq.mts. ( 559 Sq.ft. )
2 BHK60.68 Sq.mts. ( 653 Sq.ft. )
3 BHK69 Sq.mts. ( 743 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Arthayalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
141.82 Sq.M Of Rg Area Available
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room And Substation
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Fire Noc
Landscaping & Tree Planting
Trees To Be Planted
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank To Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Tank
Water Supply
Connection From Bmc After Completion
Buildings / Wings in Arthaya
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Arthaya by Sri Artha Buildtech Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

18173 Sq. ft.

Project Area

1527 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

208 apartments in total
Total
208
Booked
13
Available
195

Saleable Area Statistics (Sq. ft.)

86782 Total
Total
86782
Booked
7166
Available
79616
Total 208 apartments in project. 13 apartments booked. 6% apartments booked.
Total 86782 Sq.ft. saleable area. 7166 saleable area booked.
8% area booked.

Rehab Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab WingApr 2028231010018
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )109
None Booked0% Booked
0% Booked
Shop14.83 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.96 Sq.mts. ( 183 Sq.ft. )1
None Booked0% Booked
0% Booked
111 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rehab WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Sale Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale WingApr 2028171010050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.65 Sq.mts. ( 405 Sq.ft. )15
1 BHK41.07 Sq.mts. ( 442 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK44.99 Sq.mts. ( 484 Sq.ft. )17
2 BHK51.97 Sq.mts. ( 559 Sq.ft. )17
8 Booked47% Booked
47% Booked
2 BHK60.68 Sq.mts. ( 653 Sq.ft. )17
3 BHK69 Sq.mts. ( 743 Sq.ft. )17
97 total apartments / 13 apartments booked. 13% apartments booked.
Work Description in Building Sale WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sri Artha Buildtech Private Limited
for Project
Arthaya
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation