Project overview

Arista is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003375. Arista is located at 26 Pt. This is a Ongoing being developed by M/S. Sahajanand Developers.

Arista has 0, 2 BHK & 3 BHK Apartments with carpet areas ranging from 0 to 862 Sq.ft. Carpet. The Project has total 414 of which 97 are currently available for sale.

Arista is being developed on a total land area of 93210 Sq.ft. out of which 42549 Sq.ft. i.e 46% is reserved for recreational purposes. Arista has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Arista
  • Location:
  • 26 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    M/S. Sahajanand Developers
  • Phone:
  • Address:
  • Palm Spring Centre
Project RERA Details
MAHA REARA No: P51800003375
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Con Arch India
Funding Bank YES BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 31 Dec 2025
Litigations No Litigations
Last Modified 16 Oct 2023
Last Retrived 26 Jul 2025
Arista QR Code
Arista
MahaRERA - P51800003375
Apartment Details & Configuration
TypeArea
2 BHK64.54 Sq.mts. ( 695 Sq.ft. )
2 BHK64.72 Sq.mts. ( 697 Sq.ft. )
2 BHK64.88 Sq.mts. ( 698 Sq.ft. )
3 BHK91.07 Sq.mts. ( 980 Sq.ft. )
2 BHK64.9 Sq.mts. ( 699 Sq.ft. )
2 BHK65.32 Sq.mts. ( 703 Sq.ft. )
3 BHK94.78 Sq.mts. ( 1020 Sq.ft. )
00 Sq.mts. ( 0 Sq.ft. )
2 BHK76.19 Sq.mts. ( 820 Sq.ft. )
2 BHK80.1 Sq.mts. ( 862 Sq.ft. )
3 BHK104.84 Sq.mts. ( 1128 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aristalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
3952.9 Sq Mtr Will Be Handed Over To Apex Body
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Will Be Handed Over To Apex Body
Energy management
Na
Fire Protection And Fire Safety Requirements
Will Be Handed Over To Apex Body As Per Cfo Noc
Landscaping & Tree Planting
Will Be Handed Over To Apex Body
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Handed Over To Apex Body
Solid Waste Management And Disposal
Will Be Handed Over To Apex Body
Storm Water Drains
Will Be Handed Over To Apex Body
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Will Be Handed Over To Apex Body
Water Conservation, Rain water Harvesting
Rwh Will Be Handed Over To Apex Body
Water Supply
Will Be Handed Over To Apex Body
Buildings / Wings in Arista
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Arista by M/S. Sahajanand Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

93210 Sq. ft.

Project Area

42549 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

414 apartments in total
Total
414
Booked
317
Available
97

Saleable Area Statistics (Sq. ft.)

383557 Total
Total
383557
Booked
286750
Available
96807
Total 414 apartments in project. 317 apartments booked. 76% apartments booked.
Total 383557 Sq.ft. saleable area. 286750 saleable area booked.
75% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AMar 2021221014050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.54 Sq.mts. ( 695 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK64.72 Sq.mts. ( 697 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK64.88 Sq.mts. ( 698 Sq.ft. )17
17 Booked100% Booked
100% Booked
3 BHK91.07 Sq.mts. ( 980 Sq.ft. )17
17 Booked100% Booked
100% Booked
66 total apartments / 66 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMar 2021221014055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.72 Sq.mts. ( 697 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK64.9 Sq.mts. ( 699 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK65.32 Sq.mts. ( 703 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK94.78 Sq.mts. ( 1020 Sq.ft. )17
17 Booked100% Booked
100% Booked
66 total apartments / 66 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 20214912140356
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
2 BHK76.19 Sq.mts. ( 820 Sq.ft. )84
49 Booked58% Booked
58% Booked
2 BHK80.1 Sq.mts. ( 862 Sq.ft. )42
35 Booked83% Booked
83% Booked
3 BHK104.84 Sq.mts. ( 1128 Sq.ft. )156
101 Booked64% Booked
64% Booked
282 total apartments / 185 apartments booked. 65% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress45% done
45% Booked
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress45% done
45% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
work-in-progress90% done
90% Booked
X number of Slabs of Super Structure
work-in-progress45% done
45% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Sahajanand Developers
for Project
Arista
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation