Project overview

Arista is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003375. Arista is located at 26 Pt. This is a Ongoing being developed by M/S. Sahajanand Developers.

Arista has 0, 2 BHK & 3 BHK Apartments with carpet areas ranging from 0 to 862 Sq.ft. Carpet. The Project has total 414 of which 97 are currently available for sale.

Arista is being developed on a total land area of 93210 Sq.ft. out of which 42549 Sq.ft. i.e 46% is reserved for recreational purposes. Arista has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Kalpataru Radiance DKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Kalpataru Radiance AKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Kalpataru Radiance BKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Ekta Tripolis Phase IEkta Everglade Homes Private LimitedCts 22A/10 22A/11A, 22A/14 Pt, 2601/130-06-2021 00:00:00
AthenaM/S. Sahajanand Developers26 Pt31-03-2020 00:00:00
Constrution Of 24 Lig Ts On Cts No 356 P At Siddharth Nagar Goregaon West Mumbai 400062Mumbai Housing And Area Development BoardCts No 356 Part30-06-2019 00:00:00
AristaM/S. Sahajanand Developers26 Pt30-12-2022 00:00:00
Aspen ParkMessrs. Unique Real Estate DevelopersCts No. 554/C30-12-2020 00:00:00
Sunteck City Avenue 1Sunteck Realty Limited112A31-03-2020 00:00:00
Ashtha Goregaon WestTown Developers41631-12-2019 00:00:00
Lotus ResidencyLotus Logistics And Developers Pvt Ltd136/2, 137/1 To 730-06-2021 00:00:00
Om Shubh LabhBali Realty Llp695, 695/1 To 695/630-06-2018 00:00:00
34 Park EstateM/S Reddy Builders & Developers50 A Part, 55 Part, 49 Part31-07-2028 00:00:00
Kalpataru Radiance EKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Samarth ResidencyAjay Sitaram Surve560, 1 To 630-12-2022 00:00:00
Pearl MajesticChandiwala Enterprises40 Pt 40 1 To 36284 Pt 284 1 To 23 And30-12-2023 00:00:00
Siddharth Nagar Sukhvilla Chs LtdDilip Hiralal DoshiPlot No 6 - Cts No 350 Part 350/ 13 To 1630-06-2018 00:00:00
Redevlopment Of Sundresh Chs LtdRaj Corporation27431-12-2017 00:00:00
Siddharth Nagar Abhiman Chs Ltd Building No-25Mumbai Shelter Housing Development Pvt Ltd347 Part31-12-2019 00:00:00
Goregaon Pearl Chs Ltd - Wing ASsd Escatics Pvt. Ltd.40010430-06-2017 00:00:00
Dineshkunj Chs LtdSwastik Realty Pvt Ltd188 Cts No.60730-06-2018 00:00:00
Shivoham HeightsRajputana Heights6851 To 8, 685, 68431-12-2017 00:00:00
Pahhal AvenueUmmang Realtors Llp799/1 To 8, 79931-12-2019 00:00:00
Redevelopment Of Navchandrakunj ChslPranav Constructions LimitedPlot No.42, Cts No.734/A, 734/1 To 630-03-2022 00:00:00
SamadhanShivam Parivar Developers Pvt Ltd26Part30-06-2021 00:00:00
Laxmi HeightsLaxmidevi DevelopersPlot No 30731-12-2018 00:00:00
Swati C.H.S. LtdDilip Hiralal DoshiCts No 348 P 348 70 To 7230-06-2018 00:00:00
Siddarth Nagar Arunodaya Chs LtdChiraginfraprojectspvt LtdMumbai Suburban, 40006231-03-2018 00:00:00
VivanGoregaon Electrical Industries LlpCts No 92 To 9731-12-2028 00:00:00
Siddharth Nagar Shivam Chs LtdVirendra Hiralal DoshiCts No 348 Part31-03-2025 00:00:00
Shree Hari EnclaveParesh PatelGoregaon West, Mumbai Suburban31-12-2025 00:00:00
Aspen GardenMessrs. Unique Real Estate DevelopersCts No. 554/A31-12-2018 00:00:00
Sunteck City Avenue 2Sunteck Realty Limited112B30-04-2022 00:00:00
Samosaran ApartmentsMahavir Construction Company400062, Mumbai Suburban31-12-2020 00:00:00
Prime Builders And Developers - SadhuadarshPrime Builders And Developers538/13 538/1530-11-2020 00:00:00
Dridhena Developers And RealtorsDridhena Developers And Realtors662, 662/1 To 528-02-2019 00:00:00
Dharmanath KrupaBali Landmarks Llp679/1 To 679/7, 67931-12-2018 00:00:00
Shatrunjay PlazaAcme Metal Industries Pvt LtdCts 36A And 36B Of Village Goregaon30-12-2024 00:00:00
Redevelopment Of Mettivilla ChslPranav Constructions LimitedCts No 659 659/1 To 659/530-12-2028 00:00:00
Golden Star Residency Building No 2Arundhati Ajay Kadam1227/7, 1227/630-09-2018 00:00:00
OshiSahyog Homes Limited1C/3 Pt, 410/C Pt30-12-2022 00:00:00
VeronaSahyog Homes Limited406 Pt31-07-2023 00:00:00
Imperial Heights Wing C And DEpitome Residency Private Limited1 Part30-06-2019 00:00:00
Bali LaxmiBali Spaces Llp531 531/1 To 531/930-06-2024 00:00:00
Shastri Nagar Prerna C.H.S.Ltd.Confiable ConstructionsCts No. 219 Pt30-06-2025 00:00:00
Siddharth Nagar SamataWhite Water Developers35330-04-2023 00:00:00
Building On Sub Plot - D, Cts No 101/B Of Village GoregaonSkyline Construction Co.Part Of Sub Plot D Cts No 101 B Of Village Goregaon At Oshiwara District Centre Goregaon W Mumbai31-10-2019 00:00:00
Goregaon Janseva Chs Ltd Wing A And BKarwa And Kewal Kiran RealtorsCs No. 267 Part30-12-2021 00:00:00
Shiv GangaAnjani Kumar Co Pvt Ltd696, 696/130-06-2023 00:00:00
Mandor Heights Phase-IiA S K Construction Co626 626 1To430-03-2023 00:00:00
Siddharth Nagar Sukhvilla Chs Ltd Phase- 2Dilip Hiralal DoshiPlot No 6 Cts No 350 Part 350/13 To 1630-03-2022 00:00:00
4Th Avenue Sunteck City, Odc, Goregaon WestSatguru Corporate Services Pvt. Ltd.158, 161 Part30-12-2025 00:00:00
Siddharth Nagar Swami Vivekanand ChslDhariwal Developers (India) Private Limited353 Part30-12-2026 00:00:00
Kandivali Sai Prassana Chs LtdAshwin EnterpriseCts Nos.955 Of Village Kandivali, Plot No 1131-10-2023 00:00:00
Satra OneBleu Noir Infrastructure Development Pvt. Ltd.217A Pt31-12-2024 00:00:00
Gokul ParadiseShree Radhe ConstructionCts 527 527 1 To 631-12-2024 00:00:00
Viniyog Chs Ltd.Vinayak Developers190, 190/1 To 430-07-2020 00:00:00
AnandiSadhna Global Construction400062, Mumbai Suburban31-12-2017 00:00:00
Raj SpacesRajesh SurtiMumbai Suburban, 40006203-03-2010 00:00:00
Chandan HiraBali Shelters LlpCts No 703 Plot No 8130-09-2024 00:00:00
Vidya NidhiLaxmi Aakar Realty57231-03-2024 00:00:00
MotivillaAakar Shiv Infra Venture755/1 To 6, 75531-03-2024 00:00:00
Sushanku Avenue 36Sushanku Realty Private Limited268A/131-12-2025 00:00:00
Sejal Kajal Apartment Chs LtdNeminath Realtors9031-07-2026 00:00:00
Bali DivineBali Estates Llp710 710/1 To 710/831-07-2025 00:00:00
DeshabhimaniSiroyafm Constructions Pvt LtdMumbai Suburban, 40006206-07-2010 00:00:00
Regent PalaceSadhna InfrastructuresCts 649, 649/1 To 431-03-2018 00:00:00
HariniwasShree Balaji Corporation594/1 To 5, 59430-12-2021 00:00:00
Siddharth Nagar Siddhivinayak Chs LtdInfinity ConstructionsCts 348/62 To 6531-12-2027 00:00:00
Redevelopment Of Mangal Karini ChslAnjani Kumar Developers Llp270,270/1 To 1831-12-2026 00:00:00
63 Rishabraj AvenueRishabraj Infra Llp58730-07-2028 00:00:00
Laxmi CallistaLaxmidevi Developers283A01-09-2019 00:00:00
The MeadowsGuruashish Construction Private LimitedPlot No.R-10, Cts No-260/9A19-11-2019 00:00:00
AmanPatel DevelopersMumbai Suburban, 40006201-05-2017 00:00:00
Vallabh Krupa ChslGun Rajan Constructions644/A/131-10-2026 00:00:00
MatrusmrutiGio Properties41702-10-2025 00:00:00
RivaanM/S Meghna Infracon Llp275, 275/1 To 275/928-12-2028 00:00:00
Redevelopment Of Om Manikanta ChslPranav Constructions LimitedCts No. 217/A27-12-2027 00:00:00
Rajputana ResidencyRajputana Residency LlpPlot No 221 Cts No 555 555/1 To 2 Survey No 105 To 110 146 And 14731-12-2028 00:00:00
Deepali Darshan J. P. Nagar Co-Operative Housing Society LimitedWestin Sankalp Developers108,108/1, 108/2 And 108/331-12-2026 00:00:00
Project Details
  • Project:
    Arista
  • Location:
  • 26 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    M/S. Sahajanand Developers
  • Phone:
  • Address:
  • Palm Spring Centre
Project RERA Details
MAHA REARA No: P51800003375
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Con Arch India
Funding Bank YES BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 31 Dec 2025
Litigations No Litigations
Last Modified 16 Oct 2023
Last Retrived 26 Jul 2025
Arista QR Code
Arista
MahaRERA - P51800003375
Apartment Details & Configuration
TypeArea
2 BHK64.54 Sq.mts. ( 695 Sq.ft. )
2 BHK64.72 Sq.mts. ( 697 Sq.ft. )
2 BHK64.88 Sq.mts. ( 698 Sq.ft. )
3 BHK91.07 Sq.mts. ( 980 Sq.ft. )
2 BHK64.9 Sq.mts. ( 699 Sq.ft. )
2 BHK65.32 Sq.mts. ( 703 Sq.ft. )
3 BHK94.78 Sq.mts. ( 1020 Sq.ft. )
00 Sq.mts. ( 0 Sq.ft. )
2 BHK76.19 Sq.mts. ( 820 Sq.ft. )
2 BHK80.1 Sq.mts. ( 862 Sq.ft. )
3 BHK104.84 Sq.mts. ( 1128 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aristalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
3952.9 Sq Mtr Will Be Handed Over To Apex Body
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Will Be Handed Over To Apex Body
Energy management
Na
Fire Protection And Fire Safety Requirements
Will Be Handed Over To Apex Body As Per Cfo Noc
Landscaping & Tree Planting
Will Be Handed Over To Apex Body
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Handed Over To Apex Body
Solid Waste Management And Disposal
Will Be Handed Over To Apex Body
Storm Water Drains
Will Be Handed Over To Apex Body
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Will Be Handed Over To Apex Body
Water Conservation, Rain water Harvesting
Rwh Will Be Handed Over To Apex Body
Water Supply
Will Be Handed Over To Apex Body
Buildings / Wings in Arista
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Arista by M/S. Sahajanand Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

93210 Sq. ft.

Project Area

42549 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

414 apartments in total
Total
414
Booked
317
Available
97

Saleable Area Statistics (Sq. ft.)

383557 Total
Total
383557
Booked
286750
Available
96807
Total 414 apartments in project. 317 apartments booked. 76% apartments booked.
Total 383557 Sq.ft. saleable area. 286750 saleable area booked.
75% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AMar 2021221014050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.54 Sq.mts. ( 695 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK64.72 Sq.mts. ( 697 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK64.88 Sq.mts. ( 698 Sq.ft. )17
17 Booked100% Booked
100% Booked
3 BHK91.07 Sq.mts. ( 980 Sq.ft. )17
17 Booked100% Booked
100% Booked
66 total apartments / 66 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMar 2021221014055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.72 Sq.mts. ( 697 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK64.9 Sq.mts. ( 699 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK65.32 Sq.mts. ( 703 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK94.78 Sq.mts. ( 1020 Sq.ft. )17
17 Booked100% Booked
100% Booked
66 total apartments / 66 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 20214912140356
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
2 BHK76.19 Sq.mts. ( 820 Sq.ft. )84
49 Booked58% Booked
58% Booked
2 BHK80.1 Sq.mts. ( 862 Sq.ft. )42
35 Booked83% Booked
83% Booked
3 BHK104.84 Sq.mts. ( 1128 Sq.ft. )156
101 Booked64% Booked
64% Booked
282 total apartments / 185 apartments booked. 65% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress45% done
45% Booked
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress45% done
45% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
work-in-progress90% done
90% Booked
X number of Slabs of Super Structure
work-in-progress45% done
45% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Sahajanand Developers
for Project
Arista
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation