Project overview

Arihant Aakarshan Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000034793. Arihant Aakarshan Phase I is located at 35/1A,35/1B,35/1C &36/0. This is a New being developed by Arihant Superstructures Limited.

Arihant Aakarshan Phase I has 1 BHK & 2 BHK Apartments with carpet areas ranging from 318 to 476 Sq.ft. Carpet. The Project has total 618 of which 618 are currently available for sale.

Arihant Aakarshan Phase I is being developed on a total land area of 135992 Sq.ft. out of which 54247 Sq.ft. i.e 40% is reserved for recreational purposes. Arihant Aakarshan Phase I has 6 Wings / Towers Adora,Benecia,Fidel,Huberto,Isabelle,Jonas

ProjectDeveloperLocationPossession
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Project Details
  • Project:
    Arihant Aakarshan Phase I
  • Location:
  • 35/1A,35/1B,35/1C &36/0
  • Const. Stage:
    New
  • Possession:
    31 Mar 2030
Developer Details

  • Developer:
    Arihant Superstructures Limited
  • Phone:
  • Address:
  • "Arihant Aura"
Project RERA Details
MAHA REARA No: P52000034793
Project Type Others
RERA Project Status New
Architect Yogita Bhndarkar
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Mar 2030
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Apr 2022
Last Retrived 28 Jul 2025
Arihant Aakarshan Phase I QR Code
Arihant Aakarshan Phase I
MahaRERA - P52000034793
Apartment Details & Configuration
TypeArea
1 BHK29.58 Sq.mts. ( 318 Sq.ft. )
2 BHK44.18 Sq.mts. ( 476 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Arihant Aakarshan Phase Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Work Not Started
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Work Not Started
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting
Work Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Treated
Solid Waste Management And Disposal
Work Not Started
Storm Water Drains
Work Not Started
Street Lighting
Work Not Started
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply
G I Water Line Network
Buildings / Wings in Arihant Aakarshan Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Arihant Aakarshan Phase I by Arihant Superstructures Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

135992 Sq. ft.

Project Area

54247 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

618 apartments in total
Total
618
Booked
0
Available
618

Saleable Area Statistics (Sq. ft.)

229459 Total
Total
229459
Booked
0
Available
229459
Total 618 apartments in project. 0 apartments booked. 0% apartments booked.
Total 229459 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Adora

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AdoraMar 2030131010361
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.58 Sq.mts. ( 318 Sq.ft. )51
None Booked0% Booked
0% Booked
2 BHK44.18 Sq.mts. ( 476 Sq.ft. )52
None Booked0% Booked
0% Booked
103 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building AdoraCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Benecia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BeneciaMar 2030131010361
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.58 Sq.mts. ( 318 Sq.ft. )51
None Booked0% Booked
0% Booked
2 BHK44.18 Sq.mts. ( 476 Sq.ft. )52
None Booked0% Booked
0% Booked
103 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building BeneciaCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Fidel

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
FidelMar 2030131010361
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.58 Sq.mts. ( 318 Sq.ft. )51
None Booked0% Booked
0% Booked
2 BHK44.18 Sq.mts. ( 476 Sq.ft. )52
None Booked0% Booked
0% Booked
103 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building FidelCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Huberto

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
HubertoMar 2030131010361
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.58 Sq.mts. ( 318 Sq.ft. )77
None Booked0% Booked
0% Booked
2 BHK44.18 Sq.mts. ( 476 Sq.ft. )26
None Booked0% Booked
0% Booked
103 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building HubertoCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Isabelle

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
IsabelleMar 2030131010361
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.58 Sq.mts. ( 318 Sq.ft. )103
None Booked0% Booked
0% Booked
103 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building IsabelleCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Jonas

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
JonasMar 2030131010361
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.58 Sq.mts. ( 318 Sq.ft. )77
None Booked0% Booked
0% Booked
2 BHK44.18 Sq.mts. ( 476 Sq.ft. )26
None Booked0% Booked
0% Booked
103 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building JonasCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Arihant Superstructures Limited
for Project
Arihant Aakarshan Phase I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation