Project overview

Aquaria Grande, Wing B Floor 33-38 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007959. Aquaria Grande, Wing B Floor 33-38 is located at Cts No.1448/8A And 1448/8D. This is a Ongoing being developed by Club Aquaria Enterprises.

Aquaria Grande, Wing B Floor 33-38 has 3 BHK, 3 point 5 BHK & 4 BHK Apartments with carpet areas ranging from 1639 to 2298 Sq.ft. Carpet. The Project has total 17 of which 6 are currently available for sale.

Aquaria Grande, Wing B Floor 33-38 is being developed on a total land area of 9774 Sq.ft. Aquaria Grande, Wing B Floor 33-38 has 1 Wings / Towers Wing B Floor 33-38

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Aquaria Grande, Wing B Floor 33-38
  • Location:
  • Cts No.1448/8A And 1448/8D
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Club Aquaria Enterprises
  • Phone:
  • Address:
  • Platina
Project RERA Details
MAHA REARA No: P51800007959
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Teearch
Funding Bank INDUSIND BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 19 Mar 2020
Last Retrived 26 Jul 2025
Aquaria Grande, Wing B Floor 33-38 QR Code
Aquaria Grande, Wing B Floor 33-38
MahaRERA - P51800007959
Apartment Details & Configuration
TypeArea
3 BHK152.26 Sq.mts. ( 1639 Sq.ft. )
3 point 5 BHK172.78 Sq.mts. ( 1860 Sq.ft. )
4 BHK202.97 Sq.mts. ( 2185 Sq.ft. )
4 BHK213.48 Sq.mts. ( 2298 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aquaria Grande, Wing B Floor 33-38 last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space90% completed
90% Complete
Provided
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Transformer
Energy management95% completed
95% Complete
Transformer
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
Landscaping & Tree Planting95% completed
95% Complete
On Ground And Podium Top
Open Parking90% completed
90% Complete
Provided
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Stp
Solid Waste Management And Disposal82% completed
82% Complete
Garbage Chute Provision
Storm Water Drains100% completed
95% Complete
As Per Swd Remarks
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water90% completed
90% Complete
Stp
Water Conservation, Rain water Harvesting90% completed
90% Complete
Rwh As Per Consultant
Water Supply82% completed
82% Complete
Connection After Oc By Bmc
Buildings / Wings in Aquaria Grande, Wing B Floor 33-38
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aquaria Grande, Wing B Floor 33-38 by Club Aquaria Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9774 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

17 apartments in total
Total
17
Booked
11
Available
6

Saleable Area Statistics (Sq. ft.)

33028 Total
Total
33028
Booked
22090
Available
10938
Total 17 apartments in project. 11 apartments booked. 64% apartments booked.
Total 33028 Sq.ft. saleable area. 22090 saleable area booked.
67% area booked.

Wing B Floor 33-38

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B Floor 33-38Dec 202071000043
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK152.26 Sq.mts. ( 1639 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 point 5 BHK172.78 Sq.mts. ( 1860 Sq.ft. )6
4 BHK202.97 Sq.mts. ( 2185 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK213.48 Sq.mts. ( 2298 Sq.ft. )5
5 Booked100% Booked
100% Booked
17 total apartments / 11 apartments booked. 64% apartments booked.
Work Description in Building Wing B Floor 33-38Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Club Aquaria Enterprises
for Project
Aquaria Grande, Wing B Floor 33-38
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation