Project overview

Apurva Vaishali Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800050330. Apurva Vaishali Chsl is located at 2636. This is a New being developed by Diravya Developers Llp.

Apurva Vaishali Chsl has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 395 to 721 Sq.ft. Carpet. The Project has total 22 of which 2 are currently available for sale.

Apurva Vaishali Chsl is being developed on a total land area of 4038 Sq.ft. Apurva Vaishali Chsl has 1 Wings / Towers Apurva Vaishali Chsl

ProjectDeveloperLocationPossession
Shree Rasraj TowerK Mehta And Company2472/1 To 12, 247231-12-2019 00:00:00
Navkar AtlantisNavkar Lifespaces Private LimitedDaulat Nagar30-11-2017 00:00:00
Redevelopment Of Sanjog Chs LtdHeritage Lifestyles LlpPlot No 135 Cts No 250131-12-2018 00:00:00
Ashtavinayak NxAshtavinayak InfrastructureGut No 19 Cts No 932331-03-2019 00:00:00
Shiv AaradhanaBrightmen Buildspaces Llp281, 281/1 To 930-12-2023 00:00:00
Modispaces TashkentModispaces Real Estate Pvt LtdCts No 1418, 1418/1 To 1418/15 Of Village Eksar31-12-2018 00:00:00
Shambhav DarshanAavishkar EnterprisesMumbai Suburban, 40006630-06-2020 00:00:00
Sbi Employees Prashant ChsAditya Developers40006618-05-2020 00:00:00
Shree KrishnaShakuntala BhoirMumbai Suburban, 40006831-12-2018 00:00:00
Target The MallMahendra Jamnadas Kara590/1 To 6 F P No 33, Cts No 59031-12-2017 00:00:00
Star PlazaSevenstar Developers68, 66/1 To 12, 67/1 To 24, 6730-12-2022 00:00:00
Ratna Mohan Triveni ChslAtul Corporates72 A / 7431-12-2018 00:00:00
Redevelopment Of Divya Jyoti Co-Operative Housing Society LimitedD V Developers LlpPlot No 51, Cts Nos. 2575 And 2575 1 To 430-12-2021 00:00:00
Kumbhavati NiwasKrishna Bhooraram Purohit465, 4652, 465130-12-2021 00:00:00
Kaveri HeightsKaveri GoldCts No 607/A30-12-2021 00:00:00
Sanghvi SolitaireSanghvi Premises Private LimitedCts No 31B Part31-12-2018 00:00:00
Borivali Dipti Co-Op Hsg LtdShree Riddhi Siddhi Builders213030-06-2019 00:00:00
Rooprajat EnclaveSiddhivinayak Developers55 5730-12-2021 00:00:00
Torna ApartmentRajmudra Construction Pvt Ltd211831-01-2018 00:00:00
Nishchay Wing FShreeraj Developer Llp1779 Part30-12-2024 00:00:00
The Borivali Neel Akash ChslTriveni Developers400066, Mumbai Suburban31-12-2018 00:00:00
RudranshSpa Jain Real Estate Private LimitedPlot No 122 Cts No 2527 2527 1 To 4 Village Eksar31-12-2017 00:00:00
TatvaGitanjali Infratech Limited68/A/131-12-2018 00:00:00
Signature-IChaubey Realties Private LimitedC.T.S No. 2698/2697/2700/2699/2699-1 To331-12-2021 00:00:00
Marina Enclave Wing J,K,L Phase -IGurukrupa Developers D N Nagar Project507 / 44-130-12-2020 00:00:00
Sbi Ragvihar ChsTuvin Consultancy Llp41210-12-2020 00:00:00
Swayambhu ResidencyYogiraj Builders And Developers226A130-09-2021 00:00:00
Gaurishankar Bungalow RedevelopmentS S RealityCts No.211931-12-2019 00:00:00
Nishchay - Wing EShreeraj Developer Llp1779 Part30-12-2024 00:00:00
Nishchay Wing DShreeraj Developer Llp1779 Part30-12-2024 00:00:00
Unicorn HeightsTeoama Infrastructure Private LimitedCts No 19/327, Plot No Am-330-06-2025 00:00:00
Shiv LilamNavkarmik Infra & Development Private Limited285 B 101-03-2025 00:00:00
Borivali New Roma Sadan ChslSumukh Infraproject659.2030-06-2023 00:00:00
Parag - Reserve Co-Op Hsg SocSadguru Buildspacespvt. Ltd.536/C30-12-2020 00:00:00
Navkar HeightsNavkar Groups Private Limited214130-12-2021 00:00:00
Maa EnrichDhanish Jitendra Shah46/1To431-05-2018 00:00:00
Kashi BhuvanBharat V Kenny1011/A31-12-2024 00:00:00
Blue Star Crystal ChslParadigm Blue Star Llp11712-07-2027 00:00:00
Apurva Vaishali ChslDiravya Developers Llp263630-09-2025 00:00:00
Arkade CrownArkade Developers Private LimitedCts No. 143031-12-2025 00:00:00
Rishabraj ChambersRishabraj Estate Developers Pvt Ltd2624, 2624/1 To 9, 262331-12-2025 00:00:00
Shiv ParbatV3 Partners1732/1115-03-2027 00:00:00
Shri Hari BuildingShri Neelkanth DevelopersCts No 265531-01-2019 00:00:00
Vklal Hari Phase IVeekaylal Investment Company Private Limited230830-12-2025 00:00:00
Samet Sikar MahalKothari Construction Company353, 351, 351/1 To 1631-12-2018 00:00:00
KrishnaSunit EnterpriseCts No 1142 1143 114730-12-2028 00:00:00
Aakasha ChslTrivenidevelopers462 462/1 To 531-12-2017 00:00:00
Shree Sai Prasad Sra Chs LtdArjun WaghmareBorivali West31-12-2018 00:00:00
Sai LeelaLaxmi Associates2488, 2488/1 To 2131-12-2019 00:00:00
Sai JharokhaSwastik Space2395F30-09-2017 00:00:00
Parmarth Niketan - Redevelopment Of Mani BhuvanJ V Constructions & Developers2688/ 1 To 9, 268831-12-2019 00:00:00
Rakhi Tower Phase 2 9Th To 11Th Floor PartWestern DevelopmentsMumbai Suburban, 40006621-12-2020 00:00:00
A And O EminenteAshapura Housing Private Limited400068, Mumbai Suburban31-12-2021 00:00:00
Rakhi Tower Phase 1Western Developments332A 332B 332C 332D 332E21-12-2019 00:00:00
Ami ChslMehta Group4831-12-2018 00:00:00
Saikrupa ChsHasmukh R Hirani267030-06-2019 00:00:00
Casa PalazzoM/S. Paradigm Real Estates Llp4/10, Bearing Cts No. 38431-03-2019 00:00:00
Radha Madhav ChslShri Krishna Chaitanya EnterprisesCts No 17330-09-2018 00:00:00
New Tashkent Terrace ChslAmar Associates5181 To 7, 51801-10-2018 00:00:00
Shri Vallabh ResidencySwadhinta Builders Llp 1326/A/126-01-2022 00:00:00
State Sector Bank Employees Chs Ltd Kailas BuildingKonark Structural Engineers Private Limited1417 & 1417/131-03-2025 00:00:00
Bhavik Darshan Chs Ltd And Gajmukh Chs LtdKonark Structural Engineers Private Limited2456/A, 2456/B, 2456/B/1, 2456/B/2, 2456/B/331-12-2027 00:00:00
Borivali Sai Smruti Cooperative Housing Society LimitedM/S Sapphire Developers2351A30-06-2027 00:00:00
Aditya Aryan / EjajDinesh C Agarwal2334/2/A And B, 2303/1, Cts 2301/5 To C, 2334/1 And 331-03-2018 00:00:00
SanskritiJem And Associates2497, 2497/1 To 431-01-2021 00:00:00
Park ResidencyPavan Sheth And Associates Aop105-A And 10631-01-2021 00:00:00
Borivali Sagar ChslMahavir Infraprojects2408, 2408/1To1331-03-2026 00:00:00
Harsiddhi Sadan Chs LtdRk Construction20830-06-2025 00:00:00
Arvind NiwasHridyaa Infraprojects LlpFp No. 71J Of Tps Ii Cts No 457, 457/1 To 457/430-06-2025 00:00:00
Earth Residency Wing C And Wing DEarth Estate Developers Pvt Ltd1805 Dahisar Division Mumbai28-08-2023 00:00:00
AsharaDevleela Developers504B-Fp86 Part31-12-2019 00:00:00
New Shiv Krupa Chsl Triveni ContourTriveni DevelopersMumbai Suburban, 40006631-03-2018 00:00:00
Ashoka Co-Op Hsg Society LimitedM/S Design Builders Pvt Ltd1570/B31-03-2019 00:00:00
KarmyogKrishnir Realtors And Developers400066, Mumbai Suburban31-03-2020 00:00:00
Shivoham EnclaveSiddheshwar Builders Pvt. Ltd.389 Pt, 398/1-8 Of Village Kanheri, 389/131-143, 396/1-15, 395, 39730-06-2022 00:00:00
Garden ViewSmlife Shreeji Developers Llp30-05-2025 00:00:00
Chheda BhuvanHaresh Popatlal Chheda2739, 2739/1 To 231-12-2026 00:00:00
Shree YashodhanK Mehta And Company6330-09-2025 00:00:00
Teenmurty SummitM/S Teenmurty Summit Realty Llp19731-07-2022 00:00:00
Elite TowerElite Construction Co.400066, Mumbai Suburban31-07-2023 00:00:00
Adinath HeightsShri Neelkanth Developers2740 ,274131-03-2026 00:00:00
AudumbarVas Builder & Developers265831-12-2019 00:00:00
Patel Associates A/C New BelevuePatel Associates A/C New BelevueTps Ii Borivali, Cts No.11, F.P. 8A30-06-2021 00:00:00
Jaliyan Heights BorivaliJaliyan Developer2507, 2506/1, 2508, 2507/1, 2509, 2509/1, Plot No.134 And 184 Ol S No.177, 250630-07-2021 00:00:00
Chaitanya Om Shivam - Om Shivam Premises CslChaitanya Enterprises680A/1/ 831-05-2024 00:00:00
Om Moti Nagar ChslRenovator Construction505 1 To 505 7, 50530-06-2024 00:00:00
MatruchhayaM/S. Rishabraj Balaji Infra2680/1 To 9, 268031-12-2024 00:00:00
Proposed Redevelopment Of Prakashkunj ChslYash Realtors & Developers2637 1 - 5, 263730-12-2023 00:00:00
Redevelopment Of Pravesh ChslPranav Constructions LimitedF P No 2428-11-2023 00:00:00
Rishabraj DivineM/S. Rishabraj Balaji Infra2758, 2758/1 To 630-10-2023 00:00:00
101 BoulevardH M Developers117 ,118, 118/ 1 To 330-06-2026 00:00:00
PavapuriKum Kum Enterprises1231-12-2026 00:00:00
Borivali Kesar Kripa Chs LtdBorivali Kesar Kripa Chs Ltd1731-12-2027 00:00:00
Shashwat ResidencyRushi Realty India Pvt Ltd8, 13, 14/1, 14, 9, Cts No 7, 14/2, 10/1 To 6, 15/1 Cts No 2770 Final Plot No 7-B30-12-2022 00:00:00
Bldg No.1 Dahisar Sai Sadan Chs LtdTrumph Developers2334 Pt31-12-2019 00:00:00
Dahisar Sunderbaug Co-Op Housing Society Ltd.Rishabraj Estate Developers Pvt Ltd951 And 951/131-12-2018 00:00:00
Shreeji LeelaK Mehta And Company2466, 2466 / (1 To 4)30-06-2028 00:00:00
Nl Park ViewBeautiful Properties Private Limited80G ,80H30-05-2028 00:00:00
Pratham - By ShraddhaShraddha Prime Projects LimitedCts No.-197(Pt),Survey No.-5131-12-2029 00:00:00
66 Aventus AvenueAventus Infrastructure Llp2696, 2696/1 To 2531-12-2029 00:00:00
Nicco Vanashri And Nicco HeightsNew India Construction CompanyF.P.No. 109 Of Tps Borivali No Iii31-12-2028 00:00:00
Shiv Guru TowerRajlaxmi Developers905A ,90631-12-2027 00:00:00
Poonam ChslDigam Lifespaces Llp2718, 2718/1, 2718/2, 2718/331-10-2027 00:00:00
Dahisar Sagar Co-Operative Housing Society LimitedM/S. Trilogy Realtors Private Limited282431-12-2029 00:00:00
Sankeshwar DarshanM/S. Rishabraj Balaji Infra267930-10-2023 00:00:00
Jay Shrinath ChslK Mehta And Company2467A30-06-2025 00:00:00
ShivalayaParadigm Friends Realtors Llp 02-01-2029 00:00:00
Avyukta MeghaKhushi Spaces Llp30-12-2028 00:00:00
Nirala OpalShree Nirala Construction30-06-2029 00:00:00
Megh Mahal ChslSamarpan Homes & Developers31-12-2027 00:00:00
Sambhav Darshan Purshottam Park Co-Operative Housing Society LtdSamarpan Homes & Developers31-12-2027 00:00:00
Golden GatewayD.N Developers270931-12-2029 00:00:00
Construction Of 86 Tenements Out Of 430 Mig Tenements Of Old Magathane Village BorivaliMaharashtra Housing And Area Development AuthorityCts No 183 Pt 184 Pt 185 Pt 186 Pt 187 Pt 196 Pt 197 Pt And 201 Pt13-12-2018 00:00:00
Parimal HeritageDvnm Realty Private LimitedCts 2645A/3 Village Eksar31-03-2027 00:00:00
Ami OneAmi Wiseowlzz Realty31-12-2027 00:00:00
Raj CapitalRaj Insignia Private Limited175231-08-2026 00:00:00
Sbies Geetanjali ChslB.Chopda Construction Pvt LtdCts No. 2710 A, Old Cts 2710 And 271131-07-2019 00:00:00
Jeevan Shobha Chsl And Bhansali ChslHirani Realtors Llp2762A, 2762B, 2762 B1 To 2762 B8.31-03-2026 00:00:00
Redevelopment Of Kripadham Chs LtdKripa Realtors1951 To 4, 19531-12-2017 00:00:00
Project Details
  • Project:
    Apurva Vaishali Chsl
  • Location:
  • 2636
  • Const. Stage:
    New
  • Possession:
    30 Sep 2025
Developer Details

  • Developer:
    Diravya Developers Llp
  • Phone:
  • Address:
  • Jalkirti Apt
Project RERA Details
MAHA REARA No: P51800050330
Project Type Residential / Group Housing
RERA Project Status New
Architect Chirag Rayani
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Sep 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Apr 2023
Last Retrived 26 Jul 2025
Apurva Vaishali Chsl QR Code
Apurva Vaishali Chsl
MahaRERA - P51800050330
Apartment Details & Configuration
TypeArea
1 BHK36.66 Sq.mts. ( 395 Sq.ft. )
1 BHK39.44 Sq.mts. ( 425 Sq.ft. )
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )
1 BHK40.71 Sq.mts. ( 438 Sq.ft. )
1 BHK44.18 Sq.mts. ( 476 Sq.ft. )
2 BHK53.56 Sq.mts. ( 577 Sq.ft. )
2 BHK55.78 Sq.mts. ( 600 Sq.ft. )
3 BHK66.98 Sq.mts. ( 721 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Apurva Vaishali Chsllast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
On Gorund Floor
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Drawings
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
Landscaping & Tree Planting100% completed
95% Complete
As Per Drawings
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Drawings
Solid Waste Management And Disposal100% completed
95% Complete
As Per Swm Noc
Storm Water Drains100% completed
95% Complete
As Per Swd Noc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
As Per Approvals
Buildings / Wings in Apurva Vaishali Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Apurva Vaishali Chsl by Diravya Developers Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4038 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

22 apartments in total
Total
22
Booked
20
Available
2

Saleable Area Statistics (Sq. ft.)

11817 Total
Total
11817
Booked
10846
Available
971
Total 22 apartments in project. 20 apartments booked. 90% apartments booked.
Total 11817 Sq.ft. saleable area. 10846 saleable area booked.
92% area booked.

Apurva Vaishali Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Apurva Vaishali ChslSep 20259101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.66 Sq.mts. ( 395 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK39.44 Sq.mts. ( 425 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK40.71 Sq.mts. ( 438 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK44.18 Sq.mts. ( 476 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.56 Sq.mts. ( 577 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK55.78 Sq.mts. ( 600 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK66.98 Sq.mts. ( 721 Sq.ft. )4
4 Booked100% Booked
100% Booked
22 total apartments / 20 apartments booked. 90% apartments booked.
Work Description in Building Apurva Vaishali ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Diravya Developers Llp
for Project
Apurva Vaishali Chsl
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation