Project overview
Apna Ghar Phase Iii Nx is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045229. Apna Ghar Phase Iii Nx is located at 401107. This is a New Project being developed by Seven Eleven Construction Pvt Ltd.
Apna Ghar Phase Iii Nx has 1RK Apartments with carpet areas ranging from 204 to 204 Sq.ft. Carpet. The Project has total 299 of which 299 are currently available for sale.
Apna Ghar Phase Iii Nx is being developed on a total land area of 196981 Sq.ft. out of which 34590 Sq.ft. i.e 18% is reserved for recreational purposes. Apna Ghar Phase Iii Nx has 4 Wings / Towers A5,A6,A7,C5
| Project | Developer | Location | Possession |
-
Project:
Apna Ghar Phase Iii Nx
-
Location:
-
401107
-
Const. Stage:
New Project
-
Possession:
31 Mar 2027
-
Developer:
Seven Eleven Construction Pvt Ltd
-
Phone:
-
Address:
-
1St Floor, Seven Eleven Mansion, Deepak Hospital Lane, Near Seven Square Academy, Ideal Park, 401107
| MAHA REARA No: |
P51700045229 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
UNION BANK OF INDIA |
| Proposed Possession |
31 Mar 2027 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
31 Jan 2023 |
| Last Retrived |
28 Jul 2025 |
Apna Ghar Phase Iii Nx QR Code
Apna Ghar Phase Iii Nx
MahaRERA - P51700045229
| Type | Area |
| 1 BHK | 32 Sq.mts. ( 344 Sq.ft. ) |
| 1 BHK | 32.34 Sq.mts. ( 348 Sq.ft. ) |
| 1RK | 18.92 Sq.mts. ( 204 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Apna Ghar Phase Iii Nxlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Wip |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Wip |
|
|
|
Wip |
Fire Protection And Fire Safety
Requirements
|
|
Wip |
Landscaping & Tree Planting
|
|
Wip |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Wip |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Na |
|
|
|
Wip |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Wip |
|
|
|
Wip |
Buildings / Wings in Apna Ghar Phase Iii Nx
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Apna Ghar Phase Iii Nx by Seven Eleven Construction Pvt Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
299
apartments in total
Saleable Area Statistics (Sq. ft.)
96701
Total
Total 299 apartments in project. 0 apartments booked. 0% apartments booked.
Total 96701 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A5 | Mar 2027 | 22 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 32 Sq.mts. ( 344 Sq.ft. ) | 44 | |
| 1 BHK | 32.34 Sq.mts. ( 348 Sq.ft. ) | 63 | |
| 1RK | 18.92 Sq.mts. ( 204 Sq.ft. ) | 22 | |
129 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A5 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A6 | Mar 2027 | 22 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 32.34 Sq.mts. ( 348 Sq.ft. ) | 107 | |
107 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A6 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A7 | Mar 2027 | 7 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 32.34 Sq.mts. ( 348 Sq.ft. ) | 35 | |
35 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A7 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| C5 | Mar 2027 | 7 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1RK | 18.92 Sq.mts. ( 204 Sq.ft. ) | 28 | |
28 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building C5 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Seven Eleven Construction Pvt Ltd
for Project
Apna Ghar Phase Iii Nx
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |