Project overview

Apna Ghar Phase Iii Nx is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045229. Apna Ghar Phase Iii Nx is located at 401107. This is a New Project being developed by Seven Eleven Construction Pvt Ltd.

Apna Ghar Phase Iii Nx has 1RK Apartments with carpet areas ranging from 204 to 204 Sq.ft. Carpet. The Project has total 299 of which 299 are currently available for sale.

Apna Ghar Phase Iii Nx is being developed on a total land area of 196981 Sq.ft. out of which 34590 Sq.ft. i.e 18% is reserved for recreational purposes. Apna Ghar Phase Iii Nx has 4 Wings / Towers A5,A6,A7,C5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Apna Ghar Phase Iii Nx
  • Location:
  • 401107
  • Const. Stage:
    New Project
  • Possession:
    31 Mar 2027
Developer Details

  • Developer:
    Seven Eleven Construction Pvt Ltd
  • Phone:
  • Address:
  • 1St Floor, Seven Eleven Mansion, Deepak Hospital Lane, Near Seven Square Academy, Ideal Park, 401107
Project RERA Details
MAHA REARA No: P51700045229
Project Type Residential
RERA Project Status New Project
Funding Bank UNION BANK OF INDIA
Proposed Possession 31 Mar 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 31 Jan 2023
Last Retrived 28 Jul 2025
Apna Ghar Phase Iii Nx QR Code
Apna Ghar Phase Iii Nx
MahaRERA - P51700045229
Apartment Details & Configuration
TypeArea
1 BHK32 Sq.mts. ( 344 Sq.ft. )
1 BHK32.34 Sq.mts. ( 348 Sq.ft. )
1RK18.92 Sq.mts. ( 204 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Apna Ghar Phase Iii Nxlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Wip
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Apna Ghar Phase Iii Nx
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Apna Ghar Phase Iii Nx by Seven Eleven Construction Pvt Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

196981 Sq. ft.

Project Area

34590 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

299 apartments in total
Total
299
Booked
0
Available
299

Saleable Area Statistics (Sq. ft.)

96701 Total
Total
96701
Booked
0
Available
96701
Total 299 apartments in project. 0 apartments booked. 0% apartments booked.
Total 96701 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A5Mar 202722101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32 Sq.mts. ( 344 Sq.ft. )44
None Booked0% Booked
0% Booked
1 BHK32.34 Sq.mts. ( 348 Sq.ft. )63
None Booked0% Booked
0% Booked
1RK18.92 Sq.mts. ( 204 Sq.ft. )22
None Booked0% Booked
0% Booked
129 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A5Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

A6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A6Mar 202722101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.34 Sq.mts. ( 348 Sq.ft. )107
None Booked0% Booked
0% Booked
107 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A6Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

A7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A7Mar 20277101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.34 Sq.mts. ( 348 Sq.ft. )35
None Booked0% Booked
0% Booked
35 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A7Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

C5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C5Mar 20277101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK18.92 Sq.mts. ( 204 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C5Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Seven Eleven Construction Pvt Ltd
for Project
Apna Ghar Phase Iii Nx
last updated on 28 Jul 2025 as per information obtained from MARA RERA.