Project overview

Apna Ghar Phase Ii Nx is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045206. Apna Ghar Phase Ii Nx is located at Thane. This is a New Project being developed by Seven Eleven Construction Pvt Ltd.

Apna Ghar Phase Ii Nx has 1 BHK & 1RK Apartments with carpet areas ranging from 172 to 365 Sq.ft. Carpet. The Project has total 881 of which 881 are currently available for sale.

Apna Ghar Phase Ii Nx is being developed on a total land area of 355986 Sq.ft. out of which 90911 Sq.ft. i.e 26% is reserved for recreational purposes. Apna Ghar Phase Ii Nx has 5 Wings / Towers B2,B3,C3,D4,D5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Apna Ghar Phase Ii Nx
  • Location:
  • Thane
  • Const. Stage:
    New Project
  • Possession:
    21 Apr 2027
Developer Details

  • Developer:
    Seven Eleven Construction Pvt Ltd
  • Phone:
  • Address:
  • 1St Floor, Seven Eleven Mansion, Deepak Hospital Lane, Near Seven Square Academy, Ideal Park, 401107
Project RERA Details
MAHA REARA No: P51700045206
Project Type Others
RERA Project Status New Project
Funding Bank UNION BANK OF INDIA
Proposed Possession 21 Apr 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 31 Jan 2023
Last Retrived 28 Jul 2025
Apna Ghar Phase Ii Nx QR Code
Apna Ghar Phase Ii Nx
MahaRERA - P51700045206
Apartment Details & Configuration
TypeArea
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )
1RK22.88 Sq.mts. ( 246 Sq.ft. )
Shop10.87 Sq.mts. ( 117 Sq.ft. )
Shop13.57 Sq.mts. ( 146 Sq.ft. )
Shop14.47 Sq.mts. ( 156 Sq.ft. )
Shop15.55 Sq.mts. ( 167 Sq.ft. )
Shop16.59 Sq.mts. ( 179 Sq.ft. )
1 BHK32.34 Sq.mts. ( 348 Sq.ft. )
1 BHK33.88 Sq.mts. ( 365 Sq.ft. )
1 BHK23.78 Sq.mts. ( 256 Sq.ft. )
Shop24.59 Sq.mts. ( 265 Sq.ft. )
Shop27.68 Sq.mts. ( 298 Sq.ft. )
Shop13.4 Sq.mts. ( 144 Sq.ft. )
Shop19.32 Sq.mts. ( 208 Sq.ft. )
Shop21.9 Sq.mts. ( 236 Sq.ft. )
1 BHK28.54 Sq.mts. ( 307 Sq.ft. )
1 BHK33.93 Sq.mts. ( 365 Sq.ft. )
1RK15.98 Sq.mts. ( 172 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Apna Ghar Phase Ii Nxlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Wip
Water Conservation, Rain water Harvesting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Wip
Storm Water Drains
Wip
Solid Waste Management And Disposal
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Open Parking
Wip
Landscaping & Tree Planting
Wip
Fire Protection And Fire Safety Requirements
Wip
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Community Buildings
Na
Aggregate area of recreational Open Space
Wip
Buildings / Wings in Apna Ghar Phase Ii Nx
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Apna Ghar Phase Ii Nx by Seven Eleven Construction Pvt Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

355986 Sq. ft.

Project Area

90911 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

881 apartments in total
Total
881
Booked
0
Available
881

Saleable Area Statistics (Sq. ft.)

278827 Total
Total
278827
Booked
0
Available
278827
Total 881 apartments in project. 0 apartments booked. 0% apartments booked.
Total 278827 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B2Mar 202725101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )221
None Booked0% Booked
0% Booked
1RK22.88 Sq.mts. ( 246 Sq.ft. )50
None Booked0% Booked
0% Booked
Shop10.87 Sq.mts. ( 117 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.57 Sq.mts. ( 146 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.47 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.55 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.59 Sq.mts. ( 179 Sq.ft. )2
None Booked0% Booked
0% Booked
277 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure

B3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B3Mar 202721101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.34 Sq.mts. ( 348 Sq.ft. )42
None Booked0% Booked
0% Booked
1 BHK33.88 Sq.mts. ( 365 Sq.ft. )81
None Booked0% Booked
0% Booked
123 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

C3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C3Mar 202727101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.78 Sq.mts. ( 256 Sq.ft. )131
None Booked0% Booked
0% Booked
Shop24.59 Sq.mts. ( 265 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.68 Sq.mts. ( 298 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.4 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.32 Sq.mts. ( 208 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.9 Sq.mts. ( 236 Sq.ft. )1
None Booked0% Booked
0% Booked
136 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D4Mar 202722101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.54 Sq.mts. ( 307 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )173
None Booked0% Booked
0% Booked
195 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D5Mar 202722101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.93 Sq.mts. ( 365 Sq.ft. )128
None Booked0% Booked
0% Booked
1RK15.98 Sq.mts. ( 172 Sq.ft. )22
None Booked0% Booked
0% Booked
150 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D5Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Seven Eleven Construction Pvt Ltd
for Project
Apna Ghar Phase Ii Nx
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation