Apna Ghar Phase Ii Nx is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045206. Apna Ghar Phase Ii Nx is located at Thane. This is a New Project being developed by Seven Eleven Construction Pvt Ltd.
Apna Ghar Phase Ii Nx has 1 BHK & 1RK Apartments with carpet areas ranging from 172 to 365 Sq.ft. Carpet. The Project has total 881 of which 881 are currently available for sale.
Apna Ghar Phase Ii Nx is being developed on a total land area of 355986 Sq.ft. out of which 90911 Sq.ft. i.e 26% is reserved for recreational purposes. Apna Ghar Phase Ii Nx has 5 Wings / Towers B2,B3,C3,D4,D5
| Project | Developer | Location | Possession |
-
Project:
Apna Ghar Phase Ii Nx
-
Location:
-
Thane
-
Const. Stage:
New Project
-
Possession:
21 Apr 2027
-
Developer:
Seven Eleven Construction Pvt Ltd
-
Phone:
-
Address:
-
1St Floor, Seven Eleven Mansion, Deepak Hospital Lane, Near Seven Square Academy, Ideal Park, 401107
| MAHA REARA No: |
P51700045206 |
| Project Type |
Others |
| RERA Project Status |
New Project |
| Funding Bank |
UNION BANK OF INDIA |
| Proposed Possession |
21 Apr 2027 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
31 Jan 2023 |
| Last Retrived |
28 Jul 2025 |
Apna Ghar Phase Ii Nx QR Code
Apna Ghar Phase Ii Nx
MahaRERA - P51700045206
| Type | Area |
| 1 BHK | 30.52 Sq.mts. ( 329 Sq.ft. ) |
| 1RK | 22.88 Sq.mts. ( 246 Sq.ft. ) |
| Shop | 10.87 Sq.mts. ( 117 Sq.ft. ) |
| Shop | 13.57 Sq.mts. ( 146 Sq.ft. ) |
| Shop | 14.47 Sq.mts. ( 156 Sq.ft. ) |
| Shop | 15.55 Sq.mts. ( 167 Sq.ft. ) |
| Shop | 16.59 Sq.mts. ( 179 Sq.ft. ) |
| 1 BHK | 32.34 Sq.mts. ( 348 Sq.ft. ) |
| 1 BHK | 33.88 Sq.mts. ( 365 Sq.ft. ) |
| 1 BHK | 23.78 Sq.mts. ( 256 Sq.ft. ) |
| Shop | 24.59 Sq.mts. ( 265 Sq.ft. ) |
| Shop | 27.68 Sq.mts. ( 298 Sq.ft. ) |
| Shop | 13.4 Sq.mts. ( 144 Sq.ft. ) |
| Shop | 19.32 Sq.mts. ( 208 Sq.ft. ) |
| Shop | 21.9 Sq.mts. ( 236 Sq.ft. ) |
| 1 BHK | 28.54 Sq.mts. ( 307 Sq.ft. ) |
| 1 BHK | 33.93 Sq.mts. ( 365 Sq.ft. ) |
| 1RK | 15.98 Sq.mts. ( 172 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Apna Ghar Phase Ii Nxlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Wip |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Wip |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Wip |
Landscaping & Tree Planting
|
|
Wip |
|
|
|
Wip |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Wip |
Solid Waste Management And Disposal
|
|
Wip |
|
|
|
Wip |
|
|
|
Wip |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Wip |
|
|
|
Wip |
Buildings / Wings in Apna Ghar Phase Ii Nx
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Apna Ghar Phase Ii Nx by Seven Eleven Construction Pvt Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
881
apartments in total
Saleable Area Statistics (Sq. ft.)
278827
Total
Total 881 apartments in project. 0 apartments booked. 0% apartments booked.
Total 278827 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B2 | Mar 2027 | 25 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30.52 Sq.mts. ( 329 Sq.ft. ) | 221 | |
| 1RK | 22.88 Sq.mts. ( 246 Sq.ft. ) | 50 | |
| Shop | 10.87 Sq.mts. ( 117 Sq.ft. ) | 1 | |
| Shop | 13.57 Sq.mts. ( 146 Sq.ft. ) | 1 | |
| Shop | 14.47 Sq.mts. ( 156 Sq.ft. ) | 1 | |
| Shop | 15.55 Sq.mts. ( 167 Sq.ft. ) | 1 | |
| Shop | 16.59 Sq.mts. ( 179 Sq.ft. ) | 2 | |
277 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building B2 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B3 | Mar 2027 | 21 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 32.34 Sq.mts. ( 348 Sq.ft. ) | 42 | |
| 1 BHK | 33.88 Sq.mts. ( 365 Sq.ft. ) | 81 | |
123 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building B3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| C3 | Mar 2027 | 27 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 23.78 Sq.mts. ( 256 Sq.ft. ) | 131 | |
| Shop | 24.59 Sq.mts. ( 265 Sq.ft. ) | 1 | |
| Shop | 27.68 Sq.mts. ( 298 Sq.ft. ) | 1 | |
| Shop | 13.4 Sq.mts. ( 144 Sq.ft. ) | 1 | |
| Shop | 19.32 Sq.mts. ( 208 Sq.ft. ) | 1 | |
| Shop | 21.9 Sq.mts. ( 236 Sq.ft. ) | 1 | |
136 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building C3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| D4 | Mar 2027 | 22 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 28.54 Sq.mts. ( 307 Sq.ft. ) | 22 | |
| 1 BHK | 30.52 Sq.mts. ( 329 Sq.ft. ) | 173 | |
195 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building D4 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| D5 | Mar 2027 | 22 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 33.93 Sq.mts. ( 365 Sq.ft. ) | 128 | |
| 1RK | 15.98 Sq.mts. ( 172 Sq.ft. ) | 22 | |
150 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building D5 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Seven Eleven Construction Pvt Ltd
for Project
Apna Ghar Phase Ii Nx
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |