Project overview

Anvaya is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900003676. Anvaya is located at Parel. This is a On-Going Project being developed by Kumar Matunga Project Llp.

Anvaya has 2 BHK, Shop, SHOP NO 1 & SHOP NO 2 Apartments with carpet areas ranging from 214 to 801 Sq.ft. Carpet. The Project has total 17 of which 4 are currently available for sale.

Anvaya is being developed on a total land area of 6147 Sq.ft. Anvaya has 1 Wings / Towers Anvaya

ProjectDeveloperLocationPossession
Tridhaatu KshitijTridhaatu Construction Private LimitedFinal Plot No 23030-12-2023 00:00:00
Tridhaatu VihaanTridhaatu Suraj Villa Developers LlpMatunga07-11-2016 00:00:00
BlissNeetnav Construction Private LimitedPlot No 32131-12-2017 00:00:00
Project Details
  • Project:
    Anvaya
  • Location:
  • Parel
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Jul 2019
Developer Details

  • Developer:
    Kumar Matunga Project Llp
  • Phone:
  • Address:
  • A 61, 6Th Floor, Rajkamal Apartment, Rajkamal Road, Rajkamal Studio, Parel, 400012
Project RERA Details
MAHA REARA No: P51900003676
Project Type Others
RERA Project Status On-Going Project
Funding Bank State Bank of India
Proposed Possession 31 Jul 2019
Revised Possession 30 Jul 2020
Extended Possession 30 Jul 2023
Litigations No Litigations
Last Modified 23 Jan 2024
Last Retrived 28 Jul 2025
Anvaya QR Code
Anvaya
MahaRERA - P51900003676
Apartment Details & Configuration
TypeArea
2 BHK72.12 Sq.mts. ( 776 Sq.ft. )
2 BHK74.45 Sq.mts. ( 801 Sq.ft. )
Shop52.79 Sq.mts. ( 568 Sq.ft. )
SHOP NO 170.43 Sq.mts. ( 758 Sq.ft. )
SHOP NO 219.86 Sq.mts. ( 214 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Anvayalast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
COMMUNITY BUILDING
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Will Be Provided As Per Approval
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Will Be Provided As Per Approval
Landscaping & Tree Planting
Will Be Provided As Per Approval
OPEN PARKING
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Will Be Provided As Per Approval
Solid Waste Management And Disposal100% completed
95% Complete
Will Be Provided As Per Approval
Storm Water Drains100% completed
95% Complete
Will Be Provided As Per Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Provided As Per Approval
Water Supply100% completed
95% Complete
Will Be Provided As Per Approval
Buildings / Wings in Anvaya
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Anvaya by Kumar Matunga Project Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

6147 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

17 apartments in total
Total
17
Booked
13
Available
4

Saleable Area Statistics (Sq. ft.)

12509 Total
Total
12509
Booked
10167
Available
2341
Total 17 apartments in project. 13 apartments booked. 76% apartments booked.
Total 12509 Sq.ft. saleable area. 10167 saleable area booked.
81% area booked.

Anvaya

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AnvayaJul 2019211205039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.12 Sq.mts. ( 776 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHK74.45 Sq.mts. ( 801 Sq.ft. )4
3 Booked75% Booked
75% Booked
Shop52.79 Sq.mts. ( 568 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 170.43 Sq.mts. ( 758 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 219.86 Sq.mts. ( 214 Sq.ft. )1
None Booked0% Booked
0% Booked
17 total apartments / 13 apartments booked. 76% apartments booked.
Work Description in Building AnvayaCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kumar Matunga Project Llp
for Project
Anvaya
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation