Project overview

Anusaya Chs is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700021092. Anusaya Chs is located at Thane. This is a New Project being developed by Ganesh Malvankar.

Anusaya Chs has 2 BHK Apartments with carpet areas ranging from 546 to 546 Sq.ft. Carpet. The Project has total 2 of which 2 are currently available for sale.

Anusaya Chs is being developed on a total land area of 6505 Sq.ft. Anusaya Chs has 1 Wings / Towers Anusaya

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Anusaya Chs
  • Location:
  • Thane
  • Const. Stage:
    New Project
  • Possession:
    31 Jul 2023
Developer Details

  • Developer:
    Ganesh Malvankar
  • Phone:
  • Address:
  • 301, Sameer Arcade, Agyari Lane, Talao Pali, Thane, 400601
Project RERA Details
MAHA REARA No: P51700021092
Project Type Others
RERA Project Status New Project
Funding Bank TJSB bank Ltd
Proposed Possession 31 Jul 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Apr 2023
Last Retrived 28 Jul 2025
Anusaya Chs QR Code
Anusaya Chs
MahaRERA - P51700021092
Apartment Details & Configuration
TypeArea
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Anusaya Chslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Start
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Yet To Start
Buildings / Wings in Anusaya Chs
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Anusaya Chs by Ganesh Malvankarlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

6505 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

2 apartments in total
Total
2
Booked
0
Available
2

Saleable Area Statistics (Sq. ft.)

1091 Total
Total
1091
Booked
0
Available
1091
Total 2 apartments in project. 0 apartments booked. 0% apartments booked.
Total 1091 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Anusaya

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AnusayaJul 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building AnusayaCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress84% done
84% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ganesh Malvankar
for Project
Anusaya Chs
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation