Project overview

Anthurium is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700002317. Anthurium is located at Frtnoe+Acn0y7sz2bbc2zb7z1bleatj5cpc3l0lnak8ytqnqu0fgmuncllozkpcii1l0oxnhaljyzidm3+L1yw==. This is a Ongoing being developed by Aarti Estates.

Anthurium has 1 BHK Plus StudyTypeA, 1 BHK Plus StudyTypeB, 1 BHK Type A, 1 BHK Type B, 1 BHK Type C, 1 BHK Type D, 1 BHK Type E, 1 BHK Type F, 1 BHK Type G, 1 BHK Type H, 1 BHK Type I, 1 BHK Type J, 1RK Type A, 1RK Type B, 1RK Type C, 1RK Type D & 3 BHK Apartments with carpet areas ranging from 280 to 777 Sq.ft. Carpet. The Project has total 59 of which 47 are currently available for sale.

Anthurium is being developed on a total land area of 4547 Sq.ft. out of which 27705 Sq.ft. i.e 609% is reserved for recreational purposes. Anthurium has 1 Wings / Towers Terraform Lotus

ProjectDeveloperLocationPossession
Kavya ParkShree Construction CompanyBye7ts1okoixtfwh97myyodbsyy03+Zh87nfq/Jzcpkhy2alrk3ryxfzlld0u+Gx6p0hr9vp2hlva74h7i8ymw==30-06-2021 00:00:00
Kavya ResidencyKavya Mira RealtyCv4m6c0gagchjuec3nx+Jvijn29tej2md/Hthkmse17tea4qhh9o/Vrcc5+Mb2chb4yh/Ueth4spu/Qvs+Cv7/E1n0ztgrnh6+Uu3pbbuxm=31-12-2019 00:00:00
White HouseLaabh Samruddhi EnterprisesCgg2atenl/Q46sotv8wu+W==30-12-2025 00:00:00
Tropical Lagoon - 5 - Di VitaSoham EstatesYxt7iazddczsjom3xigzk2rfsuk0bosiwelraj+Xeeiqjpc2en0wrcojr5uxcba/Khykwx5gbymfqjckeg2vx8jrin49fvznriohk352v8y=31-07-2022 00:00:00
Unnathi Woods Phase Vii AUnnathi EstatesKbgwarcrrgznhhb+Jt+Knw==30-12-2025 00:00:00
Tokyo Bay Phase - 2APuranik Tokyo Bay Private LimitedKfjt/Bi/Osqcnb5v9lyz5+Flvijt2mkxsqwqnqh4oofakpr4eos5gohwzzg33w4s30-12-2024 00:00:00
Platinum TowerHaware's Housing Development Finance Corporation Ltd.Ve5ryhgoinvvhml7tefvaqzxguehfk/Eyamce2rzxo3hvzkvmunhlkibucjjsy6z30-09-2022 00:00:00
Pehla Ghar - Shubh Sanket ComplexLaabh RealtorsThane31-12-2020 00:00:00
Horizon Palms IiK M DevelopersHlc1/Z7mu7nnu7wkmwcmkbcezya5/Mkjkkhyhtcdh3kjhy0sg4seem9codxfe0r330-04-2022 00:00:00
FalconM/S Ace ConstructionsE1vmrlwc8mhrjuihr8toyeyfbvhfvnmjh2ynyopbhgi=30-06-2018 00:00:00
Pristine TowerIdeal DevelopersThane, 40061531-12-2017 00:00:00
Tropical Lagoon - 4 -JacarandaSoham EstatesT1zlsa9gtldyel4cdthxwablrvgyfzhgubzu8idgxidjz4df1+Co8wxv136yaqbtcaqxyclipco5d0a0+P6zg+Z6d/Ra0xw05qbh2ex4klq=31-05-2018 00:00:00
Tokyo Bay Phase - 1Puranik Tokyo Bay Private LimitedFqzxa3zis/Dikh+Wvgafemmvveq3wt9qsussswxmvnw=30-10-2023 00:00:00
Rumahbali Phase 2Puranik Builders Limited7M3ij+Vst261txvv4aypolelb6k7urjz50f3pdv/Kg2a2gaaurccbsxmkpu1fsnhu9gh7cfbohxkxwbr64jw1fkap4ovy7gv5juggr3cjcipnkrfodrvupjmpyggffcx30-12-2023 00:00:00
Pataskar Eclat Building No 3Pataskar Developers Pvt. Ltd40060231-12-2017 00:00:00
Pride Residency DaffodilSahil DevelopersHjxkrxbciqndpps2kbfykjeuviy/Lo/Zrr9k5yyiox0=31-12-2018 00:00:00
Raunak HeightsUnnathi AssociatesB1o+Whhxrxk4lx4cmzd+1S5y6q5oq+L1x9oit2t61ne=30-12-2025 00:00:00
Ashok Smruti DefgM/S KeytechZkyt8sglj5zwaoql7eoqsq==31-12-2019 00:00:00
Puranik City Reserva Phase 1Puranik Builders LimitedM8ai7rxbqbeyiwnechvmtucg2bzmtlkgkvr5d8wq3nahpt+Bvbgprqnxojdztoqsfxiw3z7l8y1kf4mec1xg2+Xnigfcvpoyoodfg9hevoa5j/Dkkdzsqosqo8ipyvvq8xr1yecvxzsz+Mcaqq2zww==30-03-2029 00:00:00
Prathamesh TowersShivam DevelopersAm+Tlprs4blyz+6Rayvidq==31-03-2018 00:00:00
ShantaiJanardhan Sakharam Bhoir8Vst+Lz+Bpizsjevejaeqw==31-12-2019 00:00:00
Trinity HeightsAnil Thakurdas KursijaWvc22en0pj8xf4nns6yni562mzxhon6hrcxzhvnq9ba=30-05-2023 00:00:00
Satgurus SolitaireBuildwell Land Developers Private LimitedWkgnycagav9avtopetyglcdibpq0os2tygumy7mtv/A=31-12-2017 00:00:00
Rosa Oasis Phase 2Uma EnterprisesLcwmlmbcwkopccf2ej8hi4acrlcozw85mti9w1gwfixohcwkqozcf4awswerkvhyqdbiyixet9aawv6vy5sweq==31-12-2018 00:00:00
Mahavir Kalpavruksha - J WingDamji Shamji Realty Pvt.Ltd.32Si2pjqdw2kv9dgpddxzc7hzhjhqoglpkgmc80v0meexnsskymeeiygrwfyxfatlysaz+Kctp2nb1h5x4ght3hnbnteqvfq+Bnhjdfjrruk7/Qpzxevk/R1vznamvg+U2ybi9zime0qo8ezesuowg==30-12-2023 00:00:00
Sai PalaceSai DeveopersDgmnztclbodnwjiji+Vveiboopjo+Fx5hjbcnjcjtny=31-03-2018 00:00:00
Mukund NiwasNew Vegas DevelopersNxorlkwdygklffrbpnbuwg==30-09-2020 00:00:00
Metropolis - RIVERAANANT SQUARE108/2, 108/430-03-2025 00:00:00
Metropolis - Aquaris Phase 2ANANT SQUARE2/2330-09-2025 00:00:00
Metropolis - Aquaris Phase 1ANANT SQUARE2/2330-09-2024 00:00:00
Aarambh - CM/S. Annapurna Lifespaces Llp7Ihunz6vvh9za4b2wseqwq==30-06-2026 00:00:00
Dahlia Bldg A D And EHaware Engineers And Builders Private LimitedQzrvclapy/Nbnckxo52aiiult+Blspjxz5wybqcpnrc=30-04-2019 00:00:00
Fiama ResidencyFiama Construction CompanyMbw1kuefz1xuv2cl+Dng+5N3k0ace7fxpr02qtwsxhl7ooczzvfsu1h0whq7hqwe30-12-2021 00:00:00
Shree Savali Wing BUmesh Raosaheb Pawar Patil HufCombb2j6g4nbhuir+Amtfqn44bf5l9zerooijhmvqti=31-07-2019 00:00:00
TaranganMaison Constructions Private LimitedYfitr+Xcfpdsmaxgkbmzpgz+2B50nrc5m9nn5d5cwxeon+Vcgb2ovw3o+Ds4tfjr31-05-2018 00:00:00
Sukur Enclave Phase 1Rajaram ConstructionGb2slhzhny4llyogjolopr4wzne2pxck5rxetg3qqbsjfyasnszypyv8xlhxjnhxxfbxdj2qv98vc65te1jks8tf5k1qgnhgjvrjnqn4rvhk8pvvbpt8hbvm2hwtvocl31-12-2018 00:00:00
Pushpanjali Residency Phase IiiShriraam Pioneer Developers Private LimitedYushcu2wpjpeucoiquv4mlgptqzmae3k+6Lyfoknhm9opr1qosvuempldhgv4woenbwf2fvxrq3buxvc8etwk3yp1xtm+Vxp2o/L8skqbdgpkb7lf2xlk7c7qubytksi30-12-2022 00:00:00
Ace Square Phase 1Anant SquareY7wg5zbjabavulofuswwh36t+M75w3k9g7d3kptnjqk=31-12-2017 00:00:00
Cascade Avenue BellagioAarsh ConstructionW9bxqyztihyailw5sxccao6yj96w7ludbsltpyq8/T9agnoteceqke+Vzmkhsffssh88dflzjzzryrf5ug+Wyq==31-12-2026 00:00:00
Ace CourtyardAce Signature Homes LlpFzmsxsuon/Gp2bd4cobh5q==31-03-2024 00:00:00
SubodhNew Homes Corporation/Du1zaescdrfgmtagyqicuhjfdkj21rsqphn0jz3uuq=30-09-2020 00:00:00
PelicanM/S Ace ConstructionsPeymgr7edu8x3bwn86475q==30-06-2018 00:00:00
Guru AshishShree Gurukrupa Ventures LlpEkycmc6j94nhl7d1zcsz9q==31-12-2018 00:00:00
Puraniks CapitolPuranik Builders LimitedKfbrv+Hnys0lrlo1lemjyw==30-12-2036 00:00:00
Mahavir Kalpavruksha - Oak, Tulip, Alcacia, AlmondDamji Shamji Realty Private LimitedOwkdt1znwqmfpvq5epnpbd7jbktbuky6rdurrkuy45qsg8apnsnpavioyn2vg8bs+Tnuwryogcsq8bgmrbcgsw3fakqda9ihogeif2amkund60xrlubtv8kcow3d2itu30-12-2021 00:00:00
Bhakti Pearl - CBhakti CorporationNlmnzhhskvqosmxxawogrg==31-12-2017 00:00:00
Puranik Home Town - EPuranik Builders LimitedWazsfdolkfxaeyd+0Vaxfrlry3psbpmbomqoa4qrtbn9a1qgzp4dltaqhgbsy+Evxzovvp239bswitkxsr7pkw==30-12-2026 00:00:00
AnthuriumAarti EstatesFrtnoe+Acn0y7sz2bbc2zb7z1bleatj5cpc3l0lnak8ytqnqu0fgmuncllozkpcii1l0oxnhaljyzidm3+L1yw==30-10-2023 00:00:00
Metropolis - Insignia TowersANANT SQUARE4/4, 4/5 And 6/114-04-2026 00:00:00
HORIZON PALMS - IIIKM DEVELOPERSOld S No 63, New S No 10130-12-2024 00:00:00
Mahavir Breeze Phase 1Damji Shamji Realty Pvt. Ltd.Wtbwt3x7u0syczfrtb7/Z7r2zu+G1ji9p3oc0l6z+7B7acylot3wcjbsmebxlo5fjsqhdufb6/Bdrkp81i8yqaoet0kzpvtdazza7kbxn2h/Shvqjiawzaqyoocpllc331-12-2024 00:00:00
Trimity AshwaTrimity ConstructionsYbxzv9tsjwpvpr6mjirz9a==31-12-2017 00:00:00
Vihang ValleyVihang Infrastructure Pvt LtdNel5ayhy+Zw7s0zie/8Qi+Sv1zkkefnsekdn1lvbhk9wx53u0at3vf0nw9f/Aukmgucedh46wgr4jxzxfafzk8qkw0y6m+E9j1oew+Ajgljnye+0Tnwg6pcbwfsda/Ki7kd7opbk7es+Cxhgzyjfua==30-12-2026 00:00:00
Mahavir Estella - Wing EM/S. Cityscape Construction CompanyX4krlej3qnmun9mozxwq4a8gt9y2cgvdjacr0ykc9f38yxemhayg/Neqsf/Uh7jumy4adtjxt1d2mnpoy3atohev+Cwtk+Vmfxzo+Bvq96g=31-01-2021 00:00:00
Unnathi Woods Phase ViiiUnnathi Estates3Wvu78jajfixkocdjbozzlezoqsrmgvwtgtsqilu7mwpofkrf7zojdamnxanj4okfrtkcq3ztvsmlc6kvwn01a7ji1ldts7mjhvqbgo5epm=30-06-2025 00:00:00
Cosmos Enclave - ChestnutMonarch Developers6Xfrsekqn1vfein870i9sw==30-12-2023 00:00:00
Psk SkylarGururaj DevelopersDaehgd97kqf6zukencbyeefrk+Ubkgcrnxorqcvdysl4e2ktv5haz/Luvxcicyh130-12-2023 00:00:00
Ace HomesAarti EstatesRllpa9mh4pk3z5x30vwoza==30-12-2022 00:00:00
Laabh GloriaLaabh BuildwellOqp7rog+9Jlmkwxg5h5k15gryvjqkvsr7qrsi25vjzm=30-05-2023 00:00:00
Olive ResidencyGoodwill PropertiesH7koywjrvddgb6uxq+Ankxdb1a/Vkkevydnqkdptbfnetf8uocxt7yfuu48xvgzj30-12-2021 00:00:00
Dedhia Elita C WingJaydeep CorporationKtxie9dxa7i18agciggvudzr0schxg+Lffenznr3d+Wdrxvvvcnnd7zywfa3wo4u30-06-2018 00:00:00
Ace Square Phase 2Anant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=30-06-2024 00:00:00
Horizon Heights DShreenath EnterprisesX8rgihhobgx3svrlfvpvvg==30-07-2018 00:00:00
Shree SankalpShree ConstructionsK5sggkwkxffxbbgrphmjgg==31-07-2019 00:00:00
Mahavir Estella - Wing A And BCityscape Construction CoBae3d/Ukjbuux22afadashd2ptzxntmhe1roc9ocbws=31-12-2018 00:00:00
Horizon PearlKm DevelopersAbpwlgyfigior1huxez9m0zo+2Cdphkzfkctxhmngxuxurx4fe5domqqnbtjytjm38d8j2o3+Riuenlx0weqdftkklcjbjljhucmvdpl9sxgxd3/Ewhb8cbzz03o+Dyo/Dalgdutmhwuq0onyqyiza==30-04-2027 00:00:00
Shivsharda Chs Ltd Phase IiShivshankar Singh &Amp; OthersSanman Singh Marg30-12-2023 00:00:00
Delta Greenville - AsterDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-01-2031 00:00:00
Delta Greenville - CedarDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-12-2030 00:00:00
Horizon Pearl IiKm DevelopersCfdijxvzkg306qy9geu0udaqbkmegbzbxrwnmalx2gfzbtfoow69k56g8ky3mitxebpisy+Bfxa+9R2vggd7p0xl/X3smweyalhheekbmpu=31-12-2028 00:00:00
Elysia D-4Vihang Infrastructure Pvt Ltd31-12-2031 00:00:00
Elita D3Vihang Infrastructure Pvt LtdPfxshpkxtbx4/3Gxmqqies75mkayayp8cmdf/Qufqqsyinhfphasy+Rbzqo5zyy7n7fwatputju04istqvs6hdjygdxxjwbr8qf1bowgqsck9yjmr/Ak50unkt+Psn4htioekg935y1z7iatq/Eh1y2hiyvpzwks0tjzfgris1eirwjwapl49zmz79hda+3Yfz1hxewges6az5ldzpfrpl1qeuveqm3qu/Pzzsmypgssnivnl75cm7nw2ucoyeo6gwyqvhs18xznevax1vwf4w==31-12-2029 00:00:00
KIPL Moryakhade Infrastructre Pvt. Ltd.S.No. 21/12,13,1430-06-2021 00:00:00
Spee Skytower Wing A And BSpee RealtorParel30-03-2024 00:00:00
6 CrystalCrystalstar Housing Developers Private LimitedExcz40/Gd9bh1ppb2pkaba==30-12-2025 00:00:00
Sumati HeightsTangent EnterprisesXzwax+4N+6Kqjddswgp9ya==30-12-2023 00:00:00
Vardhman Flora Phase -Ii - Vardhman HabitatVardhman Developers LtdGhodapdeo30-06-2024 00:00:00
ShubhadaSugee Twelve Developers LlpCzdhl96ucbbw8budaqczl1v/Nnkwpoeajdyjt2p1mvo=30-09-2024 00:00:00
UnioneSara RealtyHxb+Zqgtt7rng2wtdelntoioqvahlfbdpq4hckzba1i=30-06-2025 00:00:00
Joy SquareAnant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=31-12-2019 00:00:00
Ace EnclaveAce Signature Homes LlpQteztealwfqqs97tllfxug==31-12-2026 00:00:00
Metropolis BaysideANANT SQUAREGhodbunder Road31-05-2026 00:00:00
Elyra By PuraniksNeelshilp Constructions Private Limited31-12-2032 00:00:00
Ace AristoGaurav Land CorporationRfabwxl0jzmylvcd/Yao9mgekebhfe1pt/Cwwvhaxf7biuxytm1nddrtcym/Wcml31-10-2026 00:00:00
Intelligentia Segment By Haware PropertiesSuresh Kashinath Haware1Pwsmo0jgein00kqzhd8/G==31-12-2027 00:00:00
Avatara Phase 1Anant Square30-09-2031 00:00:00
PurushottamnayanGaurav EnterprisesH7xphgauie0vwaydpogpg3tl4k2epzvpjsl8an56mp2z2ylgqgh+Erdvdge4herkgap7r6b34j/Tz9719uh4hyfxsymo10klf7gail/Yusc=30-12-2022 00:00:00
Ceejay ResidencyPrime Realty LlpGo8rxrkjhxfgshblsgoryxcqz9mlnssrxqqtw1+Jws8c+2Yd5jsqbc5p7hsfsxqz30-06-2025 00:00:00
Buildarch DaisyBuildarch Land Devlopers Pvt. Ltd.Samwijgzszzkyonynpjid+Qxjyfz7h5lhsptznfu3ya=31-12-2024 00:00:00
PINE WOODRDC VENTURES11/831-12-2017 00:00:00
HORIZON PALMS IVKM DEVELOPERSOld Survey No 68, Hissa No 1/231-12-2027 00:00:00
Rosa Manhattan Phase 3Sai Uma Construction Private Limited30-06-2032 00:00:00
Project Details
  • Project:
    Anthurium
  • Location:
  • Frtnoe+Acn0y7sz2bbc2zb7z1bleatj5cpc3l0lnak8ytqnqu0fgmuncllozkpcii1l0oxnhaljyzidm3+L1yw==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2023
Developer Details

  • Developer:
    Aarti Estates
  • Phone:
  • Address:
  • Manas Residency
Project RERA Details
MAHA REARA No: P51700002317
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Saakar Architects
Funding Bank IDBI BANK
Proposed Possession 30 Oct 2023
Revised Possession 30 Oct 2023
Extended Possession
Litigations No Litigations
Last Modified 30 Dec 2021
Last Retrived 13 Feb 2026
Anthurium QR Code
Anthurium
MahaRERA - P51700002317
Apartment Details & Configuration
TypeArea
1 BHK Plus StudyTypeA52.13 Sq.mts. ( 561 Sq.ft. )
1 BHK Plus StudyTypeB44.03 Sq.mts. ( 474 Sq.ft. )
1 BHK Type A34.11 Sq.mts. ( 367 Sq.ft. )
1 BHK Type B33.81 Sq.mts. ( 364 Sq.ft. )
1 BHK Type C34.3 Sq.mts. ( 369 Sq.ft. )
1 BHK Type D35.06 Sq.mts. ( 377 Sq.ft. )
1 BHK Type E37.27 Sq.mts. ( 401 Sq.ft. )
1 BHK Type F36.22 Sq.mts. ( 390 Sq.ft. )
1 BHK Type G35.74 Sq.mts. ( 385 Sq.ft. )
1 BHK Type H35.78 Sq.mts. ( 385 Sq.ft. )
1 BHK Type I32.33 Sq.mts. ( 348 Sq.ft. )
1 BHK Type J32.9 Sq.mts. ( 354 Sq.ft. )
1RK Type A25.99 Sq.mts. ( 280 Sq.ft. )
1RK Type B32.82 Sq.mts. ( 353 Sq.ft. )
1RK Type C27.3 Sq.mts. ( 294 Sq.ft. )
1RK Type D32.66 Sq.mts. ( 352 Sq.ft. )
3 BHK72.17 Sq.mts. ( 777 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Anthuriumlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space75% completed
75% Complete
Common For Entire Layout.
Community Buildings90% completed
90% Complete
Club House Shared With Other Buildings Of Layout
Electrical Meter Room, Sub-Station, Receiving Station
Only Electrical Meter Room
Energy management
Solar Water Heating
Fire Protection And Fire Safety Requirements
Na
Internal Roads & Footpaths
Internal Drive Way
Landscaping & Tree Planting
To Be Done As Per Tree Noc Of Layout
NA
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Common Stp Shared With Other Bldg
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Anthurium
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Anthurium by Aarti Estateslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

4547 Sq. ft.

Project Area

27705 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

59 apartments in total
Total
59
Booked
12
Available
47

Saleable Area Statistics (Sq. ft.)

26569 Total
Total
26569
Booked
5738
Available
20830
Total 59 apartments in project. 12 apartments booked. 20% apartments booked.
Total 26569 Sq.ft. saleable area. 5738 saleable area booked.
22% area booked.

Terraform Lotus

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Terraform LotusOct 20228100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Plus StudyTypeA52.13 Sq.mts. ( 561 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK Plus StudyTypeB44.03 Sq.mts. ( 474 Sq.ft. )7
1 BHK Type A34.11 Sq.mts. ( 367 Sq.ft. )7
1 BHK Type B33.81 Sq.mts. ( 364 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK Type C34.3 Sq.mts. ( 369 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK Type D35.06 Sq.mts. ( 377 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK Type E37.27 Sq.mts. ( 401 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Type F36.22 Sq.mts. ( 390 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Type G35.74 Sq.mts. ( 385 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Type H35.78 Sq.mts. ( 385 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Type I32.33 Sq.mts. ( 348 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK Type J32.9 Sq.mts. ( 354 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK Type A25.99 Sq.mts. ( 280 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK Type B32.82 Sq.mts. ( 353 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK Type C27.3 Sq.mts. ( 294 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK Type D32.66 Sq.mts. ( 352 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK72.17 Sq.mts. ( 777 Sq.ft. )7
2 Booked28% Booked
28% Booked
59 total apartments / 12 apartments booked. 20% apartments booked.
Work Description in Building Terraform LotusCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Aarti Estates
for Project
Anthurium
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation