Project overview

Annavista is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800034372. Annavista is located at C/568. This is a New being developed by Trisons Builders.

Annavista has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 1116 to 1076 Sq.ft. Carpet. The Project has total 27 of which 27 are currently available for sale.

Annavista is being developed on a total land area of 9108 Sq.ft. Annavista has 1 Wings / Towers Annavista

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Annavista
  • Location:
  • C/568
  • Const. Stage:
    New
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Trisons Builders
  • Phone:
  • Address:
  • Laxmi Narayan Villa
Project RERA Details
MAHA REARA No: P51800034372
Project Type Residential / Group Housing
RERA Project Status New
Architect Pushkar Bhanuprasad Suthar
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Apr 2022
Last Retrived 26 Jul 2025
Annavista QR Code
Annavista
MahaRERA - P51800034372
Apartment Details & Configuration
TypeArea
1 BHK34.88 Sq.mts. ( 375 Sq.ft. )
2 BHK69.74 Sq.mts. ( 751 Sq.ft. )
2 BHK71.84 Sq.mts. ( 773 Sq.ft. )
2 BHK72.02 Sq.mts. ( 775 Sq.ft. )
3 BHK99.96 Sq.mts. ( 1076 Sq.ft. )
3 BHK103.64 Sq.mts. ( 1116 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Annavistalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Adani Noc
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
FITNESS CENTER
As Per Plan
Landscaping & Tree Planting
As Per Approval
LIFTS LIFTLOBBY ENTRANCE LOBBY
As Per Plan
Open Parking
As Per Plan
SECURITY CABIN
As Per The Design
SERVANT TOILET
As Per The Design
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
SOCIETY ROOM
As Per The Design
Solid Waste Management And Disposal
Na
SRAIRCASE
As Per Plan
Storm Water Drains100% completed
95% Complete
As Per Noc
Street Lighting
Na
SWIMMING POOL AND COMMON TARRACE
As Per The Design
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per The Design
Water Supply
By Mcgm
Buildings / Wings in Annavista
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Annavista by Trisons Builderslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9108 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

27 apartments in total
Total
27
Booked
0
Available
27

Saleable Area Statistics (Sq. ft.)

23215 Total
Total
23215
Booked
0
Available
23215
Total 27 apartments in project. 0 apartments booked. 0% apartments booked.
Total 23215 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Annavista

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AnnavistaDec 20248111051
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.88 Sq.mts. ( 375 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK69.74 Sq.mts. ( 751 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK71.84 Sq.mts. ( 773 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK72.02 Sq.mts. ( 775 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK99.96 Sq.mts. ( 1076 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK103.64 Sq.mts. ( 1116 Sq.ft. )4
None Booked0% Booked
0% Booked
27 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building AnnavistaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Trisons Builders
for Project
Annavista
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation