Project overview

Anandam-B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017941. Anandam-B is located at Old Sno 646 New S No 247 Hissa No1 Bhayandar. This is a New being developed by Geeta Developers.

Anandam-B has 2 BHK, 5 BHK & more & Shop Apartments with carpet areas ranging from 1593 to 644 Sq.ft. Carpet. The Project has total 98 of which 17 are currently available for sale.

Anandam-B is being developed on a total land area of 44260 Sq.ft. out of which 6639 Sq.ft. i.e 15% is reserved for recreational purposes. Anandam-B has 1 Wings / Towers Anandam-B

ProjectDeveloperLocationPossession
Anandam-APahal Construction Co.Old Survey No 646, New Survey No 247, Hissa No 130-06-2024 00:00:00
MukundamShree Ramjeevdani RealtorsOld Survey No. 658 New Survey No. 251 Hissa No 329-08-2024 00:00:00
Anandam-BGeeta DevelopersOld Sno 646 New S No 247 Hissa No1 Bhayandar30-06-2024 00:00:00
Vraj VatikaMbp Realtors Llp40110130-06-2026 00:00:00
Sudama Vallabh Wing A,B,CPravin Vandravandas VoraOld S. No. 56830-06-2026 00:00:00
Man MandirTritonia Buildcon And Infra Private LimitedThane, Bhayander West, 40110130-12-2028 00:00:00
Masaakin HatimiyahIndus Infratech1102 1103 1104 110531-03-2029 00:00:00
Leena OasisLeena Constructions Private Limited(Old) Survey No. 540/231-12-2028 00:00:00
Skyline Wing - CShri Ratnaraj Infra LlpOld S No.559,New S No.20731-12-2029 00:00:00
Windermere Tower AA G Superstructures Private LimitedNew S.No/Olds.No/H.No 221/564/1,3,4A,4B,8 New S.No/H.No.220/565/1/4,6,7,8,9,10 New S.No/Old S.No/H.No. 267/567/1,2/1 New S.No/Old S.No/H.No 245/579/1A,1B,2,3A,3B,3C,4,5,6,731-12-2028 00:00:00
Mahadev HeightsManish Nandkumar Patil566/5, 563/131-07-2019 00:00:00
Aabiel HeightsDaichi Infra LlpSurvey No 570/2 Village Bhayander28-08-2022 00:00:00
Siddham HeightsBhoopendra Ghisulal BoranaOld Sno 555730-12-2023 00:00:00
Radheshyam RegencyShri Satima EnterpriseCts No 217 To 225 , 232, 23331-12-2018 00:00:00
Span SignatureAnnapurna Buildcon Infra Pvt LtdOld Survey No 570 Hissa No 2 New Survey No 217 Hissa No 230-12-2024 00:00:00
Project Details
  • Project:
    Anandam-B
  • Location:
  • Old Sno 646 New S No 247 Hissa No1 Bhayandar
  • Const. Stage:
    New
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Geeta Developers
  • Phone:
  • Address:
  • Milan Plaza
Project RERA Details
MAHA REARA No: P51700017941
Project Type Residential / Group Housing
RERA Project Status New
Architect Avinash D Mhatre
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 01 Jul 2024
Last Retrived 26 Jul 2025
Anandam-B QR Code
Anandam-B
MahaRERA - P51700017941
Apartment Details & Configuration
TypeArea
2 BHK54.9 Sq.mts. ( 591 Sq.ft. )
2 BHK59.81 Sq.mts. ( 644 Sq.ft. )
5 BHK & more148 Sq.mts. ( 1593 Sq.ft. )
Shop26.85 Sq.mts. ( 289 Sq.ft. )
Shop39.37 Sq.mts. ( 424 Sq.ft. )
Shop41.56 Sq.mts. ( 447 Sq.ft. )
Shop46.69 Sq.mts. ( 503 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Anandam-Blast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
To Be Shared With Other Buildings In Layout
Club House100% completed
95% Complete
To Be Shared With Other Buildings In Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Work In Progress
Fitness Centre100% completed
95% Complete
To Be Shared With Other Buildings In Layout
Landscaping & Tree Planting100% completed
95% Complete
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work In Progress
Street Lighting
Na
Swimming Pool100% completed
95% Complete
To Be Shared With Other Buildings In Layout
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work In Progress
Water Supply
From Mbmc After Oc
Buildings / Wings in Anandam-B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Anandam-B by Geeta Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

44260 Sq. ft.

Project Area

6639 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

98 apartments in total
Total
98
Booked
81
Available
17

Saleable Area Statistics (Sq. ft.)

62422 Total
Total
62422
Booked
53211
Available
9210
Total 98 apartments in project. 81 apartments booked. 82% apartments booked.
Total 62422 Sq.ft. saleable area. 53211 saleable area booked.
85% area booked.

Anandam-B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Anandam-BJun 2023241011087
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.9 Sq.mts. ( 591 Sq.ft. )50
45 Booked90% Booked
90% Booked
2 BHK59.81 Sq.mts. ( 644 Sq.ft. )36
31 Booked86% Booked
86% Booked
5 BHK & more148 Sq.mts. ( 1593 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop26.85 Sq.mts. ( 289 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop39.37 Sq.mts. ( 424 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop41.56 Sq.mts. ( 447 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop46.69 Sq.mts. ( 503 Sq.ft. )2
None Booked0% Booked
0% Booked
98 total apartments / 81 apartments booked. 82% apartments booked.
Work Description in Building Anandam-BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Geeta Developers
for Project
Anandam-B
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation