Project overview

Anand Height Wing Band C is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000006290. Anand Height Wing Band C is located at Sr No 187 B. This is a Ongoing being developed by Shree Adeshwar Corporation.

Anand Height Wing Band C has 1 BHK, 1RK & SHOP Apartments with carpet areas ranging from 130 to 299 Sq.ft. Carpet. The Project has total 196 of which 86 are currently available for sale.

Anand Height Wing Band C is being developed on a total land area of 7559 Sq.ft. out of which 7077 Sq.ft. i.e 94% is reserved for recreational purposes. Anand Height Wing Band C has 1 Wings / Towers Anand Height Wing B And C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Anand Height Wing Band C
  • Location:
  • Sr No 187 B
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jul 2023
Developer Details

  • Developer:
    Shree Adeshwar Corporation
  • Phone:
  • Address:
  • Anand Nagar
Project RERA Details
MAHA REARA No: P99000006290
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sanat Mehta & Associates
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 31 Jul 2023
Revised Possession 31 Jul 2023
Extended Possession 31 Jul 2028
Litigations No Litigations
Last Modified 13 Aug 2024
Last Retrived 28 Jul 2025
Anand Height Wing Band C QR Code
Anand Height Wing Band C
MahaRERA - P99000006290
Apartment Details & Configuration
TypeArea
1 BHK23.71 Sq.mts. ( 255 Sq.ft. )
1 BHK23.77 Sq.mts. ( 256 Sq.ft. )
1 BHK24.19 Sq.mts. ( 260 Sq.ft. )
1 BHK24.35 Sq.mts. ( 262 Sq.ft. )
1 BHK27.66 Sq.mts. ( 298 Sq.ft. )
1 BHK27.74 Sq.mts. ( 299 Sq.ft. )
1RK18.27 Sq.mts. ( 197 Sq.ft. )
SHOP18.94 Sq.mts. ( 204 Sq.ft. )
SHOP12.12 Sq.mts. ( 130 Sq.ft. )
SHOP13.88 Sq.mts. ( 149 Sq.ft. )
SHOP15.89 Sq.mts. ( 171 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Anand Height Wing Band Clast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
As Per Architech Certificate
Energy management
As Per Architech Certificate
Fire Protection And Fire Safety Requirements
As Per Architech Certificate
Landscaping & Tree Planting
As Per Architech Certificate
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Architech Certificate
Solid Waste Management And Disposal
As Per Architech Certificate
Storm Water Drains50% completed
50% Complete
As Per Architech Certificate
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Architech Certificate
Water Supply35% completed
35% Complete
As Per Architech Certificate
Buildings / Wings in Anand Height Wing Band C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Anand Height Wing Band C by Shree Adeshwar Corporationlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

7559 Sq. ft.

Project Area

7077 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

196 apartments in total
Total
196
Booked
110
Available
86

Saleable Area Statistics (Sq. ft.)

52713 Total
Total
52713
Booked
27604
Available
25109
Total 196 apartments in project. 110 apartments booked. 56% apartments booked.
Total 52713 Sq.ft. saleable area. 27604 saleable area booked.
52% area booked.

Anand Height Wing B And C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Anand Height Wing B And CJul 202212101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.71 Sq.mts. ( 255 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 BHK23.77 Sq.mts. ( 256 Sq.ft. )78
75 Booked96% Booked
96% Booked
1 BHK24.19 Sq.mts. ( 260 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK24.35 Sq.mts. ( 262 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK27.66 Sq.mts. ( 298 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.74 Sq.mts. ( 299 Sq.ft. )68
None Booked0% Booked
0% Booked
1RK18.27 Sq.mts. ( 197 Sq.ft. )4
2 Booked50% Booked
50% Booked
SHOP18.94 Sq.mts. ( 204 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP12.12 Sq.mts. ( 130 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP13.88 Sq.mts. ( 149 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP15.89 Sq.mts. ( 171 Sq.ft. )1
1 Booked100% Booked
100% Booked
196 total apartments / 110 apartments booked. 56% apartments booked.
Work Description in Building Anand Height Wing B And CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress54% done
54% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress53% done
53% Booked
Sanitary Fittings within the flats / premises
work-in-progress53% done
53% Booked
Slabs of Super Structure
work-in-progress54% done
54% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress54% done
54% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Adeshwar Corporation
for Project
Anand Height Wing Band C
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation