Project overview

Anand 21 Uptown is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700048078. Anand 21 Uptown is located at S. No 70 H. No. 1/1, S. No. 70 H. No. 1/B/1 (Old S. No. 70 H. No. 1/2 (P). This is a New being developed by Vpa Developers.

Anand 21 Uptown has 2 BHK & Shop Apartments with carpet areas ranging from 229 to 711 Sq.ft. Carpet. The Project has total 89 of which 58 are currently available for sale.

Anand 21 Uptown is being developed on a total land area of 26802 Sq.ft. Anand 21 Uptown has 1 Wings / Towers Building No 1

ProjectDeveloperLocationPossession
Diwadkar LotusHonest Infra2878 A31-12-2019 00:00:00
Tycoons Valley Tower AM/S. Milestone SpaceS.No. 1, H.No. 2 30-06-2020 00:00:00
Raunak City Sector Iv - D10Raunak Corporation50/3/2 51/1 51/6 51/7 50/3/330-12-2025 00:00:00
Project Details
  • Project:
    Anand 21 Uptown
  • Location:
  • S. No 70 H. No. 1/1, S. No. 70 H. No. 1/B/1 (Old S. No. 70 H. No. 1/2 (P)
  • Const. Stage:
    New
  • Possession:
    31 Aug 2026
Developer Details

  • Developer:
    Vpa Developers
  • Phone:
  • Address:
  • Matrubaug
Project RERA Details
MAHA REARA No: P51700048078
Project Type Others
RERA Project Status New
Architect Landmark Group Mr Shirish G Nachane
Funding Bank HDFC BANK
Proposed Possession 31 Aug 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Jun 2024
Last Retrived 26 Jul 2025
Anand 21 Uptown QR Code
Anand 21 Uptown
MahaRERA - P51700048078
Apartment Details & Configuration
TypeArea
2 BHK66.03 Sq.mts. ( 711 Sq.ft. )
Shop21.26 Sq.mts. ( 229 Sq.ft. )
Shop27.91 Sq.mts. ( 300 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Anand 21 Uptownlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room Only
Energy management
Solar Electricity Generation
Fire Protection And Fire Safety Requirements
As Per Fire Office
Landscaping & Tree Planting
Tree Planting Only
Open Parking
As Per Sanction Of Kdmc
RECREATIONAL FLOOR
As Per Sanction Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
Chamber Line
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Kdmc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Kdmc
Water Supply
To Be Provided By Kdmc
Buildings / Wings in Anand 21 Uptown
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Anand 21 Uptown by Vpa Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

26802 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

89 apartments in total
Total
89
Booked
31
Available
58

Saleable Area Statistics (Sq. ft.)

60990 Total
Total
60990
Booked
22033
Available
38957
Total 89 apartments in project. 31 apartments booked. 34% apartments booked.
Total 60990 Sq.ft. saleable area. 22033 saleable area booked.
36% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Aug 2026211010680
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.03 Sq.mts. ( 711 Sq.ft. )84
31 Booked36% Booked
36% Booked
Shop21.26 Sq.mts. ( 229 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop27.91 Sq.mts. ( 300 Sq.ft. )2
None Booked0% Booked
0% Booked
89 total apartments / 31 apartments booked. 34% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Vpa Developers
for Project
Anand 21 Uptown
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation