Project overview

Ana Avant Garde Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700001388. Ana Avant Garde Phase 1 is located at Prj3jxx+Ks+Pu6wtfgrkszmvdacgxfoclfmg8xtjezk//Smc/Tr2bfkz9fd/Urhk. This is a Ongoing being developed by Steelfab Engineering Corporation.

Ana Avant Garde Phase 1 has 2 BHK Exclusive, 2 BHK Exclusive Plus, 2 BHK Lux, 2 BHK Petite & 3 BHK Apartments with carpet areas ranging from 500 to 885 Sq.ft. Carpet. The Project has total 176 of which 123 are currently available for sale.

Ana Avant Garde Phase 1 is being developed on a total land area of 7679 Sq.ft. Ana Avant Garde Phase 1 has 1 Wings / Towers Wing E And Wing F

ProjectDeveloperLocationPossession
Arkade Art Phase 2Arkade RealtyAvizif/4Kxhokdnt+Ehvxeagjzlmn8tpxhhuk7h4c94=30-12-2021 00:00:00
Arkade Art Phase 1Arkade RealtyWuyvznctpxxtmcxyy9bgvhkutzhsmn4+Kvwvz2jr+Uc=31-12-2018 00:00:00
I.P.Royal VillaAslam Ismail Patel27Eifnwvxvlurydytcyqdg==15-03-2019 00:00:00
Harsh Residency And The Corporate LoungeHarsh Real Estate Private Limited4A+Uayv//Y8vr1pkzm4rux8fh2bxtzeuhgwovf/Cjle=30-12-2021 00:00:00
Ana Avant Garde Phase 1Steelfab Engineering CorporationPrj3jxx+Ks+Pu6wtfgrkszmvdacgxfoclfmg8xtjezk//Smc/Tr2bfkz9fd/Urhk31-12-2018 00:00:00
Shree Shashwat Building No 19Shashwat DevelopersUz+34Diszsuqntk7gtf0cbn2ulzfxwzezuttexcrpewgxugt5h73gynkpmi0vdki31-12-2019 00:00:00
Shree Shaswat Building No 15White Heaven Realty06Sfnwxlraxdnvl5uducjmxrz5rgeso1x56z7cuu4ckarpp+S7vzwp21+2Jmtsarhhlghmhkrlh3vmqmr2tyuki1uxvwdftcfjehr+A/6Qc9tjkndrfcdvgrqotncbnub9yz2cgd5oens2nkfs7yd3fzzvxnvzq3rdkjdsrr+Var0elypraff9uyuvqrsbt2ji6ley9dn0s+Hcsdkh6+Hq==30-12-2023 00:00:00
GN FIRDOWSGNR Developers18-1P, 2, 19-330-12-2024 00:00:00
Raj EstateD.V.Builders & Developers Pvt. Ltd.1V+Xhiu8uveohoj1jes2r/0Jl4zec7g2ghoterqcphvz+Zh1cv3w1wzkn+Qgxeme30-06-2018 00:00:00
PlatinumSilver EnterprisesAbpwlgyfigior1huxez9m78odgq8ljwuiu0wcc5zcip+Iybwobnqnvzkziqqmr4131-12-2018 00:00:00
Jp North Imperia - Tower 2Jp Infra Realty Private Limited6Vwwtxw6ok1bo+1Fk4oiysam5fvbwxec26uvei4nxta2huyaq5zlm44k4djhvbopuejziy+D4jewf2yx9c33ivz/D1ylsywydfantcf6ok8=30-12-2025 00:00:00
IndradhanushSonam Homes Private Limited+Lnzomsisxzgxmvbojphxq==30-10-2024 00:00:00
Krishna PrestigeM/S. Arun Bhoomi CorporationLyzv3zezmyfoqrcuu0jezw==29-12-2022 00:00:00
Hiral Shree SamarthHiral Homes401107, Thane30-06-2018 00:00:00
Aasanjo AmberAasanjo Amber40110725-07-2018 00:00:00
AVIGHNA COMPLEX PHASE IAVIGHNAA INFRA BUILDCON LLPNew Survey No 16 Hissa No 1,3,430-06-2026 00:00:00
Shweta HeightsShree Sai Associates4Tbghdcyeg64bttikqsns0r8khg3akkkriabrhk1yupxb9g3luqeogctmu6ggclu4znsvshzddhw69jnywdu6/6Vk7zxtuhgffbuf7t3l8k/9Iqffj2udn/Kfp74ufm331-03-2026 00:00:00
127 Raj Homes A WingRaj HomesT4u8s9zt0d5k6ccbfaudgg4xfb4co9iss8rrcbvnrph9tzlluhybrn2gmeajn3us30-09-2025 00:00:00
S3 SkyriseS3 Smart Spaces Private LimitedMjip1lf8a8t+Rnkuqwnwnaet6ds/Yndmfddfane/5Ahitn0xzvvsse1mpwfeeokumykhckbjijdzid+Aobndmd3wmlnwwrasxm+Nxq1fblf9t2zp89t3ode84k4h5vx6ttyhlw7/Xuig1peod/1Iqa==31-12-2027 00:00:00
Kasturi BlossomSiddhivinayak EnterpriseLhuvyvcz2qygcmczyfcr6i129xjcnnjy0ksbhyozeiozfqnr5gijswqdjhmtff9suvqlu2h98ebvqtuhmugc2d7z1bpwfxwcy7jemuzo8lk=31-12-2027 00:00:00
Codename StarlifeJp Infra Realty Private LimitedMtcpien1yzieex0hdeicxda2b/Srbe7mbvtooh3j4emc1zaufka4zfmia89nq34pduemf5otdjokodh4meqfs+Us3clw8vb+Ugkfghx+/P9aujgqgtdz5nmqk9kjysagofwrmtv6ghq1s3nl6q0shq==31-12-2031 00:00:00
IMPERIAL HEIGHTS PHASE II - C WINGAKSHAR SHANTI REALTORS PRIVATE LIMITED12/130-12-2026 00:00:00
Foresta40110731-12-2021 00:00:00
PRITHVI PRIDE PHASE-IPRITHVI LAND DEVELOPERSS N 220 H N 1,2,3,430-09-2021 00:00:00
Man OpusMan Global Ltd.Kdpfz1fcmtjsxdilibbyrr8na+4Ddbkcwmtgxsk7qenjnwcfyceezdp//2Uqjc0p0uylmwdnki0i7l9/Wjpw4tpjxxtxcqmlngoybacwcerxf/Yaf2ctlegsomjioek431-12-2018 00:00:00
Tiara Hills Phase I Bldg No 3, 5 And 2Pnk Space Development Pvt LtdHwon02mcwsqqrtkg9qlhiih61/G5vja4iqqltnmrcpnf1itdl8hxpzglduiiawdj5pi1pdlaz7yj1rzl9exmrg==30-12-2025 00:00:00
Sanghvi S3 Ecocity WoodsSanghvi Premises Pvt. Ltd.S No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi30-12-2023 00:00:00
Sanghvi S3 Ecocity OrchidSanghvi Premises Pvt LtdS No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi30-12-2023 00:00:00
S3 SkygreensS3 Smart Spaces Private Limited6Ttmt7xjbumyfrtsvd3blvqlvzlyfldoocki3la8ayb4narhte3qwijfkyz2h2olvgdcwv5h7v6mvhudkotvwlt9xs9oyoyzslowzd0nz4gx2rbptqy9qty5jnqewpohtlcbni/Gbagu6seqhtg1eg==30-06-2028 00:00:00
Sheetal DharaM/s. J. K. AssociatesSurvey No. 733 /Part (Old), 124/Part (New), Plot No. 12131-12-2026 00:00:00
DELTA GARDENDelta ventureCts1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 21032157 2158 2221 2222 2294 2295 174131-07-2018 00:00:00
Avighna Complex Phase IiAvighnaa Infra Buildcon LlpJhyffdatjgnbtxtk7sw6m1oy1mccawp20jtqxmdpsdvnsafvmqyf4sxuj01hxqfv31-12-2029 00:00:00
Shree Shashwat Building No. 22Raj Infraempire Private Limited2Euewktlkjrvjg/Ys5x8q9ianzgsndqcqjjkw+9Txwhtnqpncwxit+N5cyqj0vwj6zvhjtrgr5olllzcxhr3c72bstaoprwz+24Xbbb1tys=14-01-2027 00:00:00
Magic Meera HeightsMagic Star DevelopersAfrj4pjde5gpxrjtg7ux3jmrqqlzku6aixvf9dfhuxm=30-12-2025 00:00:00
Surya Heritage AArun Construction CoSksixbxgokev5sdova7di0mtrf6abtnjbizc/E15uxk=31-12-2026 00:00:00
Heena PresidencyNeha Developers72/2, 73/1,2,3,4, 74/1,2, 75/130-12-2024 00:00:00
Jp Connect-MiraroadJp Infra Realty Private Limited31-12-2032 00:00:00
Raj AkshayRaj AkshayBayxd3ef9f/0Wxrjzakvpacvebasgtfff3o6vpikzvq+Obkc9tjlhoz4zjiu4euehmcgucix+2Imb5y9wz+Sna==30-12-2025 00:00:00
Vihang AvaanaReyanshp Realty Llp31-12-2031 00:00:00
Arch Gardens I And IiSai Prem Developers Private LimitedTrqklqebb7agsoc4srsl/Q==31-12-2018 00:00:00
Project Details
  • Project:
    Ana Avant Garde Phase 1
  • Location:
  • Prj3jxx+Ks+Pu6wtfgrkszmvdacgxfoclfmg8xtjezk//Smc/Tr2bfkz9fd/Urhk
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Steelfab Engineering Corporation
  • Phone:
  • Address:
  • Poonam Chambers B Wing
Project RERA Details
MAHA REARA No: P51700001388
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Tata Consulting Engineers Limited
Funding Bank BANK OF BARODA
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 15 Feb 2019
Last Retrived 13 Feb 2026
Ana Avant Garde Phase 1 QR Code
Ana Avant Garde Phase 1
MahaRERA - P51700001388
Apartment Details & Configuration
TypeArea
2 BHK Exclusive46.45 Sq.mts. ( 500 Sq.ft. )
2 BHK Exclusive Plus53.42 Sq.mts. ( 575 Sq.ft. )
2 BHK Lux65.03 Sq.mts. ( 700 Sq.ft. )
2 BHK Petite64.85 Sq.mts. ( 698 Sq.ft. )
3 BHK82.22 Sq.mts. ( 885 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ana Avant Garde Phase 1last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Building/Project Facility
Energy management75% completed
75% Complete
Project Facility-Power By Power Supply Company
Fire Protection And Fire Safety Requirements95% completed
95% Complete
Building/Project Facility
Landscaping & Tree Planting75% completed
75% Complete
Project Facility - On Podium Level
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Project Facility - Stp Being Provided
Solid Waste Management And Disposal75% completed
75% Complete
Building/Project Facility - Garbage Chute Proposed
Storm Water Drains95% completed
95% Complete
Project Facility-As Per Mbmc Remark&Amp;Nalla Provided
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water75% completed
75% Complete
Project Facility - Stp Being Provided
Water Conservation, Rain water Harvesting100% completed
95% Complete
Project Facility-Rwh Tank As Per Consultant Remark
Water Supply90% completed
90% Complete
Connection After Oc By Local Authority
Buildings / Wings in Ana Avant Garde Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ana Avant Garde Phase 1 by Steelfab Engineering Corporationlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

7679 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

176 apartments in total
Total
176
Booked
53
Available
123

Saleable Area Statistics (Sq. ft.)

115870 Total
Total
115870
Booked
31457
Available
84413
Total 176 apartments in project. 53 apartments booked. 30% apartments booked.
Total 115870 Sq.ft. saleable area. 31457 saleable area booked.
27% area booked.

Wing E And Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing E And Wing FDec 201823121101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK Exclusive46.45 Sq.mts. ( 500 Sq.ft. )44
25 Booked56% Booked
56% Booked
2 BHK Exclusive Plus53.42 Sq.mts. ( 575 Sq.ft. )20
11 Booked55% Booked
55% Booked
2 BHK Lux65.03 Sq.mts. ( 700 Sq.ft. )39
9 Booked23% Booked
23% Booked
2 BHK Petite64.85 Sq.mts. ( 698 Sq.ft. )51
3 BHK82.22 Sq.mts. ( 885 Sq.ft. )22
176 total apartments / 53 apartments booked. 30% apartments booked.
Work Description in Building Wing E And Wing FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress85% done
85% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Steelfab Engineering Corporation
for Project
Ana Avant Garde Phase 1
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation