Project overview

Amann Highland Park is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028085. Amann Highland Park is located at Malad East. This is a New Project being developed by Ms Relliance Construction Co.

Amann Highland Park has 1 BHK Apartments with carpet areas ranging from 331 to 379 Sq.ft. Carpet. The Project has total 319 of which 244 are currently available for sale.

Amann Highland Park is being developed on a total land area of 36463 Sq.ft. Amann Highland Park has 3 Wings / Towers Amann Highland Park - A Wing,Amann Highland Park - B Wing,Amann Highland Park - C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Amann Highland Park
  • Location:
  • Malad East
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    Ms Relliance Construction Co
  • Phone:
  • Address:
  • The Amann Group 1St Floor, Juhu Azad Lane Chsl, C D Barfiwala, Juhu Lane, Andheri West, 400058
Project RERA Details
MAHA REARA No: P51800028085
Project Type Residential
RERA Project Status New Project
Funding Bank NUTAN NAGARIK SAHAKARI BANK LTD
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 02 Mar 2024
Last Retrived 28 Jul 2025
Amann Highland Park QR Code
Amann Highland Park
MahaRERA - P51800028085
Apartment Details & Configuration
TypeArea
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )
1 BHK35.77 Sq.mts. ( 385 Sq.ft. )
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )
2 BHK48.77 Sq.mts. ( 525 Sq.ft. )
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )
1 BHK31 Sq.mts. ( 334 Sq.ft. )
1 BHK35 Sq.mts. ( 377 Sq.ft. )
1 BHK35.2 Sq.mts. ( 379 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Amann Highland Parklast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Requirement
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Requirement
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Is Proposed
Solid Waste Management And Disposal
Wip
Storm Water Drains
As Per Requirement
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Will Be Given By Bmc After Oc
Buildings / Wings in Amann Highland Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Amann Highland Park by Ms Relliance Construction Colast updated on 28 Jul 2025 as per information obtained from MARA RERA.

36463 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

319 apartments in total
Total
319
Booked
75
Available
244

Saleable Area Statistics (Sq. ft.)

125141 Total
Total
125141
Booked
28255
Available
96886
Total 319 apartments in project. 75 apartments booked. 23% apartments booked.
Total 125141 Sq.ft. saleable area. 28255 saleable area booked.
23% area booked.

Amann Highland Park - A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Amann Highland Park - A WingDec 202424110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )39
23 Booked58% Booked
58% Booked
1 BHK35.77 Sq.mts. ( 385 Sq.ft. )80
38 Booked47% Booked
47% Booked
119 total apartments / 61 apartments booked. 51% apartments booked.
Work Description in Building Amann Highland Park - A WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress45% done
45% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress57% done
57% Booked

Amann Highland Park - B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Amann Highland Park - B WingDec 202424110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )40
13 Booked32% Booked
32% Booked
2 BHK48.77 Sq.mts. ( 525 Sq.ft. )41
81 total apartments / 14 apartments booked. 17% apartments booked.
Work Description in Building Amann Highland Park - B WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress22% done
22% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked

Amann Highland Park - C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Amann Highland Park - C WingDec 202424110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )19
None Booked0% Booked
0% Booked
1 BHK31 Sq.mts. ( 334 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK35 Sq.mts. ( 377 Sq.ft. )59
None Booked0% Booked
0% Booked
1 BHK35.2 Sq.mts. ( 379 Sq.ft. )21
None Booked0% Booked
0% Booked
119 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Amann Highland Park - C WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress24% done
24% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress31% done
31% Booked
Channel Partners
Channel Partners Registered by Developer
Ms Relliance Construction Co
for Project
Amann Highland Park
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation