Project overview

Altura Umele is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000048381. Altura Umele is located at S No. 23A, H No. 1, 2 & 3 & S No. 23B. This is a New being developed by Ruby Lifespaces.

Altura Umele has 1 BHK & 2 BHK Apartments with carpet areas ranging from 301 to 536 Sq.ft. Carpet. The Project has total 272 of which 217 are currently available for sale.

Altura Umele is being developed on a total land area of 48949 Sq.ft. Altura Umele has 3 Wings / Towers A Wing,B Wing,C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Altura Umele
  • Location:
  • S No. 23A, H No. 1, 2 & 3 & S No. 23B
  • Const. Stage:
    New
  • Possession:
    27 Nov 2027
Developer Details

  • Developer:
    Ruby Lifespaces
  • Phone:
  • Address:
  • Court Avenue
Project RERA Details
MAHA REARA No: P99000048381
Project Type Others
RERA Project Status New
Architect Mr. Sanjay S. Narang
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 27 Nov 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Aug 2024
Last Retrived 28 Jul 2025
Altura Umele QR Code
Altura Umele
MahaRERA - P99000048381
Apartment Details & Configuration
TypeArea
1 BHK50 Sq.mts. ( 538 Sq.ft. )
1 BHK28.56 Sq.mts. ( 307 Sq.ft. )
2 BHK47.9 Sq.mts. ( 516 Sq.ft. )
2 BHK49.48 Sq.mts. ( 533 Sq.ft. )
2 BHK110.46 Sq.mts. ( 1189 Sq.ft. )
2 BHK143.86 Sq.mts. ( 1549 Sq.ft. )
1 BHK27.93 Sq.mts. ( 301 Sq.ft. )
2 BHK47.4 Sq.mts. ( 510 Sq.ft. )
2 BHK48.72 Sq.mts. ( 524 Sq.ft. )
2 BHK49.78 Sq.mts. ( 536 Sq.ft. )
2 BHK49.27 Sq.mts. ( 530 Sq.ft. )
2 BHK49.72 Sq.mts. ( 535 Sq.ft. )
2 BHK49.75 Sq.mts. ( 536 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Altura Umelelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains
Wip
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Altura Umele
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Altura Umele by Ruby Lifespaceslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

48949 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

272 apartments in total
Total
272
Booked
55
Available
217

Saleable Area Statistics (Sq. ft.)

116553 Total
Total
116553
Booked
21359
Available
95195
Total 272 apartments in project. 55 apartments booked. 20% apartments booked.
Total 116553 Sq.ft. saleable area. 21359 saleable area booked.
18% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingNov 202716101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK50 Sq.mts. ( 538 Sq.ft. )16
6 Booked37% Booked
37% Booked
1 BHK28.56 Sq.mts. ( 307 Sq.ft. )16
8 Booked50% Booked
50% Booked
2 BHK47.9 Sq.mts. ( 516 Sq.ft. )14
2 BHK49.48 Sq.mts. ( 533 Sq.ft. )16
2 BHK110.46 Sq.mts. ( 1189 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK143.86 Sq.mts. ( 1549 Sq.ft. )1
None Booked0% Booked
0% Booked
64 total apartments / 17 apartments booked. 26% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress47% done
47% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingNov 202716101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.93 Sq.mts. ( 301 Sq.ft. )16
4 Booked25% Booked
25% Booked
1 BHK28.56 Sq.mts. ( 307 Sq.ft. )48
13 Booked27% Booked
27% Booked
2 BHK47.4 Sq.mts. ( 510 Sq.ft. )14
2 BHK48.72 Sq.mts. ( 524 Sq.ft. )16
2 BHK49.78 Sq.mts. ( 536 Sq.ft. )16
5 Booked31% Booked
31% Booked
110 total apartments / 26 apartments booked. 23% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress47% done
47% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingNov 202717101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.93 Sq.mts. ( 301 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK28.56 Sq.mts. ( 307 Sq.ft. )33
10 Booked30% Booked
30% Booked
2 BHK49.27 Sq.mts. ( 530 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK49.72 Sq.mts. ( 535 Sq.ft. )15
2 BHK49.75 Sq.mts. ( 536 Sq.ft. )17
98 total apartments / 12 apartments booked. 12% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress45% done
45% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Ruby Lifespaces
for Project
Altura Umele
last updated on 28 Jul 2025 as per information obtained from MARA RERA.