Project overview

Altavista - Phase 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800026131. Altavista - Phase 4 is located at 343 Part. This is a New being developed by Spenta Enclave Private Limited.

Altavista - Phase 4 has 2 BHK Apartments with carpet areas ranging from 591 to 699 Sq.ft. Carpet. The Project has total 113 of which 95 are currently available for sale.

Altavista - Phase 4 is being developed on a total land area of 5004 Sq.ft. out of which 3767 Sq.ft. i.e 75% is reserved for recreational purposes. Altavista - Phase 4 has 1 Wings / Towers Wing I

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Altavista - Phase 4
  • Location:
  • 343 Part
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Spenta Enclave Private Limited
  • Phone:
  • Address:
  • Rajabahadur Mansion
Project RERA Details
MAHA REARA No: P51800026131
Project Type Residential / Group Housing
RERA Project Status New
Architect Rajan Pagnis
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 May 2025
Last Retrived 26 Jul 2025
Altavista - Phase 4 QR Code
Altavista - Phase 4
MahaRERA - P51800026131
Apartment Details & Configuration
TypeArea
2 BHK54.9 Sq.mts. ( 591 Sq.ft. )
2 BHK59.64 Sq.mts. ( 642 Sq.ft. )
2 BHK62.52 Sq.mts. ( 673 Sq.ft. )
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Altavista - Phase 4last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
350 Sqm As Per Proportion
Community Buildings
Club House As Per Approval
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approval
Energy management
As Per Approval
Fire Protection And Fire Safety Requirements
As Per Approval
Landscaping & Tree Planting
As Per Approval
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approval
Solid Waste Management And Disposal
As Per Approval
Storm Water Drains
As Per Approval
Street Lighting
Only Internal Driveways
Treatment And Disposal Of Sewage And Sullage Water
As Per Approval
Water Conservation, Rain water Harvesting
As Per Approval
Water Supply
As Per Approval
Buildings / Wings in Altavista - Phase 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Altavista - Phase 4 by Spenta Enclave Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5004 Sq. ft.

Project Area

3767 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

113 apartments in total
Total
113
Booked
18
Available
95

Saleable Area Statistics (Sq. ft.)

74592 Total
Total
74592
Booked
12206
Available
62386
Total 113 apartments in project. 18 apartments booked. 15% apartments booked.
Total 74592 Sq.ft. saleable area. 12206 saleable area booked.
16% area booked.

Wing I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing IJun 202024141001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.9 Sq.mts. ( 591 Sq.ft. )23
2 BHK59.64 Sq.mts. ( 642 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK62.52 Sq.mts. ( 673 Sq.ft. )23
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )44
13 Booked29% Booked
29% Booked
113 total apartments / 18 apartments booked. 15% apartments booked.
Work Description in Building Wing ICompletion
Basement (if any)
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Spenta Enclave Private Limited
for Project
Altavista - Phase 4
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation