Project overview

Allure Wings A To E is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008521. Allure Wings A To E is located at 1196 B. This is a Ongoing being developed by Aadi Properties Llp.

Allure Wings A To E has 1 BHK & 2 BHK Apartments with carpet areas ranging from 458 to 733 Sq.ft. Carpet. The Project has total 420 of which 184 are currently available for sale.

Allure Wings A To E is being developed on a total land area of 16033 Sq.ft. Allure Wings A To E has 5 Wings / Towers Wing A Acacia,Wing B Begonia,Wing C Camellia,Wing D Dahlia,Wing E Emillia

ProjectDeveloperLocationPossession
Runwal Forests Tower 9 - 11Wheelabrator Alloy Castings Limited598/1-3, 607A607d596/1-6, Pt.596-598, 607/1-31, 606/1-83, 599A, 605/1-17, 602/1-930-06-2026 00:00:00
Runwal Bliss Wing - DEvie Real Estate Private LimitedPt1004, 1006, 1018/1-9, 1010P1013p, 1009P1009/5-6, 1005P1005/1, 1014P30-12-2023 00:00:00
Project Details
  • Project:
    Allure Wings A To E
  • Location:
  • 1196 B
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Aadi Properties Llp
  • Phone:
  • Address:
  • Allure
Project RERA Details
MAHA REARA No: P51800008521
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mandviwala Qutub
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 19 Aug 2017
Last Retrived 26 Jul 2025
Allure Wings A To E QR Code
Allure Wings A To E
MahaRERA - P51800008521
Apartment Details & Configuration
TypeArea
1 BHK46.77 Sq.mts. ( 503 Sq.ft. )
2 BHK66.95 Sq.mts. ( 721 Sq.ft. )
2 BHK68.06 Sq.mts. ( 733 Sq.ft. )
1 BHK46.76 Sq.mts. ( 503 Sq.ft. )
2 BHK61.79 Sq.mts. ( 665 Sq.ft. )
2 BHK68.09 Sq.mts. ( 733 Sq.ft. )
1 BHK47.1 Sq.mts. ( 507 Sq.ft. )
1 BHK47.4 Sq.mts. ( 510 Sq.ft. )
1 BHK42.57 Sq.mts. ( 458 Sq.ft. )
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )
1 BHK43.31 Sq.mts. ( 466 Sq.ft. )
2 BHK58.24 Sq.mts. ( 627 Sq.ft. )
2 BHK67.82 Sq.mts. ( 730 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Allure Wings A To Elast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
For Real Estate Project Defined In Rera Document
BASEMENT100% completed
95% Complete
For The Whole Project As Defined In Rera Document
CHILDRENS PLAY AREA100% completed
95% Complete
Part Of Aggregate Area Of Recreational Open Space
CLUB HOUSE AND LEISURE AMENITIES90% completed
90% Complete
Part Of Aggregate Area Of Recreational Open Space
Community Buildings25% completed
25% Complete
Jain Temple
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management100% completed
95% Complete
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting90% completed
90% Complete
Na
Open Parking80% completed
80% Complete
For The Whole Project As Defined In Rera Document
PLINTH100% completed
95% Complete
For The Whole Project As Defined In Rera Document
PODIUM100% completed
95% Complete
For The Whole Project As Defined In Rera Document
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal100% completed
95% Complete
Na
STILT100% completed
95% Complete
For The Whole Project As Defined In Rera Document
Storm Water Drains100% completed
95% Complete
Na
Street Lighting100% completed
95% Complete
Facility Available In Larger Layout
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply100% completed
95% Complete
Facility Start Once Water Supply Commences
Buildings / Wings in Allure Wings A To E
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Allure Wings A To E by Aadi Properties Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

16033 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

420 apartments in total
Total
420
Booked
236
Available
184

Saleable Area Statistics (Sq. ft.)

262267 Total
Total
262267
Booked
144608
Available
117659
Total 420 apartments in project. 236 apartments booked. 56% apartments booked.
Total 262267 Sq.ft. saleable area. 144608 saleable area booked.
55% area booked.

Wing A Acacia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A AcaciaDec 202022000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.77 Sq.mts. ( 503 Sq.ft. )21
5 Booked23% Booked
23% Booked
2 BHK66.95 Sq.mts. ( 721 Sq.ft. )42
9 Booked21% Booked
21% Booked
2 BHK68.06 Sq.mts. ( 733 Sq.ft. )21
8 Booked38% Booked
38% Booked
84 total apartments / 22 apartments booked. 26% apartments booked.
Work Description in Building Wing A AcaciaCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B Begonia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B BegoniaDec 202022000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.76 Sq.mts. ( 503 Sq.ft. )21
19 Booked90% Booked
90% Booked
1 BHK46.77 Sq.mts. ( 503 Sq.ft. )21
19 Booked90% Booked
90% Booked
2 BHK61.79 Sq.mts. ( 665 Sq.ft. )21
18 Booked85% Booked
85% Booked
2 BHK68.09 Sq.mts. ( 733 Sq.ft. )21
16 Booked76% Booked
76% Booked
84 total apartments / 72 apartments booked. 85% apartments booked.
Work Description in Building Wing B BegoniaCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C Camellia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C CamelliaDec 202022000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.76 Sq.mts. ( 503 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK47.1 Sq.mts. ( 507 Sq.ft. )21
1 BHK47.4 Sq.mts. ( 510 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.09 Sq.mts. ( 733 Sq.ft. )42
9 Booked21% Booked
21% Booked
84 total apartments / 11 apartments booked. 13% apartments booked.
Work Description in Building Wing C CamelliaCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D Dahlia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D DahliaDec 202022000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.57 Sq.mts. ( 458 Sq.ft. )20
17 Booked85% Booked
85% Booked
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )21
19 Booked90% Booked
90% Booked
1 BHK43.31 Sq.mts. ( 466 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK58.24 Sq.mts. ( 627 Sq.ft. )21
20 Booked95% Booked
95% Booked
2 BHK68.09 Sq.mts. ( 733 Sq.ft. )21
17 Booked80% Booked
80% Booked
84 total apartments / 73 apartments booked. 86% apartments booked.
Work Description in Building Wing D DahliaCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E Emillia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing E EmilliaDec 202022000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.57 Sq.mts. ( 458 Sq.ft. )21
17 Booked80% Booked
80% Booked
2 BHK67.82 Sq.mts. ( 730 Sq.ft. )42
27 Booked64% Booked
64% Booked
2 BHK68.06 Sq.mts. ( 733 Sq.ft. )21
14 Booked66% Booked
66% Booked
84 total apartments / 58 apartments booked. 69% apartments booked.
Work Description in Building Wing E EmilliaCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Aadi Properties Llp
for Project
Allure Wings A To E
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation