Project overview

Alhambra is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900027257. Alhambra is located at 2739. This is a New being developed by Hydra Trading Private Limited.

Alhambra has 1 BHK, Duplex, Multipurpose Room & Triplex Apartments with carpet areas ranging from 4148 to 1061 Sq.ft. Carpet. The Project has total 10 of which 10 are currently available for sale.

Alhambra is being developed on a total land area of 14374 Sq.ft. out of which 2175 Sq.ft. i.e 15% is reserved for recreational purposes. Alhambra has 1 Wings / Towers Alhambra

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Alhambra
  • Location:
  • 2739
  • Const. Stage:
    New
  • Possession:
    30 Mar 2023
Developer Details

  • Developer:
    Hydra Trading Private Limited
  • Phone:
  • Address:
  • Barodawala Mansion
Project RERA Details
MAHA REARA No: P51900027257
Project Type Residential / Group Housing
RERA Project Status New
Architect Arch At Bric Private Limited
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Mar 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 Nov 2020
Last Retrived 26 Jul 2025
Alhambra QR Code
Alhambra
MahaRERA - P51900027257
Apartment Details & Configuration
TypeArea
1 BHK95.16 Sq.mts. ( 1024 Sq.ft. )
1 BHK95.52 Sq.mts. ( 1028 Sq.ft. )
1 BHK98.48 Sq.mts. ( 1060 Sq.ft. )
1 BHK98.6 Sq.mts. ( 1061 Sq.ft. )
Duplex385.35 Sq.mts. ( 4148 Sq.ft. )
Duplex519.52 Sq.mts. ( 5592 Sq.ft. )
Duplex538.14 Sq.mts. ( 5793 Sq.ft. )
Multipurpose Room40.15 Sq.mts. ( 432 Sq.ft. )
Triplex460.93 Sq.mts. ( 4961 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Alhambralast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Administration Office90% completed
90% Complete
Na
Aggregate area of recreational Open Space100% completed
95% Complete
202.10 Sq. Meters
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Substn Not Required Asper Electric Co. Noc
Energy management
Na
Entrance Foyer100% completed
95% Complete
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Fitness Centre90% completed
90% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking
Na
Security Cabin90% completed
90% Complete
Na
Servants and Drivers Toilets100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septictank Na
Solid Waste Management And Disposal99% completed
99% Complete
Na
Storm Water Drains100% completed
95% Complete
Sewage Line Connected To Mcgm Sewag
Street Lighting100% completed
95% Complete
Na
Swimming Pool90% completed
90% Complete
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply
Na
Buildings / Wings in Alhambra
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Alhambra by Hydra Trading Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

14374 Sq. ft.

Project Area

2175 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

10 apartments in total
Total
10
Booked
0
Available
10

Saleable Area Statistics (Sq. ft.)

30893 Total
Total
30893
Booked
0
Available
30893
Total 10 apartments in project. 0 apartments booked. 0% apartments booked.
Total 30893 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Alhambra

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AlhambraSep 2022181115028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK95.16 Sq.mts. ( 1024 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK95.52 Sq.mts. ( 1028 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK98.48 Sq.mts. ( 1060 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK98.6 Sq.mts. ( 1061 Sq.ft. )1
None Booked0% Booked
0% Booked
Duplex385.35 Sq.mts. ( 4148 Sq.ft. )1
None Booked0% Booked
0% Booked
Duplex519.52 Sq.mts. ( 5592 Sq.ft. )1
None Booked0% Booked
0% Booked
Duplex538.14 Sq.mts. ( 5793 Sq.ft. )2
None Booked0% Booked
0% Booked
Multipurpose Room40.15 Sq.mts. ( 432 Sq.ft. )1
None Booked0% Booked
0% Booked
Triplex460.93 Sq.mts. ( 4961 Sq.ft. )1
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building AlhambraCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress99% done
99% Booked
Sanitary Fittings within the flats / premises
work-in-progress99% done
99% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Hydra Trading Private Limited
for Project
Alhambra
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation