Project overview

Al Balad Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700053215. Al Balad Residency is located at S. No. 68/2 And S. No. 69/2. This is a New being developed by Unity Infra.

Al Balad Residency has 1 BHK & 2 BHK Apartments with carpet areas ranging from 376 to 576 Sq.ft. Carpet. The Project has total 117 of which 117 are currently available for sale.

Al Balad Residency is being developed on a total land area of 43034 Sq.ft. out of which 608 Sq.ft. i.e 1% is reserved for recreational purposes. Al Balad Residency has 3 Wings / Towers Al Balad Residency Bldg No 1 A And B Wings,Al Balad Residency Bldg No 2 A And B Wings,Al Balad Residency Bldg No 3 A And B Wings

ProjectDeveloperLocationPossession
Marathon Nexworld Elara-2Matrix Enclaves Projects Dev. Pvt. Ltd22/6, 23/1, 23/2, 23/3, 23/4, 24/4, 26/130-12-2024 00:00:00
Marathon Nexworld Elara-1Matrix Enclaves Projects Dev. Pvt. Ltd22/6, 23/1, 23/2, 23/3, 23/4, 24/4, 26/130-06-2023 00:00:00
KoynaShree Shakti DevelopersSurvey No 125 Hissa No 5 And 630-06-2021 00:00:00
Magnus HeightSilver Line ConstructionsThane, 40061231-12-2019 00:00:00
Fortune HeightsSony Noorie RealitySurvey No 107 Hissa No 3 And Survey No 109 Hissa No 1 C31-12-2018 00:00:00
Marathon Nexworld Aura-2Matrix Enclaves Projects Dev. Pvt. Ltd22/6, 23/1, 23/2, 23/3, 23/4, 24/4, 26/130-06-2023 00:00:00
Marathon Nexworld Aura-1Matrix Enclaves Projects Dev. Pvt. Ltd22/6, 23/1, 23/2, 23/3, 23/4, 24/4, 26/130-12-2022 00:00:00
Al-Quddus ResidencyAlliance Realty400612, Thane30-06-2020 00:00:00
Paradise HeightFriends GroupSurvey No 151/D/22 And Survey No 151/D/2331-12-2018 00:00:00
Mountain ValleyGayasuddin Riyazuddin Khan87 130-10-2020 00:00:00
Dz City - Building No 1Maash Construction40A/1 And 4130-06-2026 00:00:00
Dz City - Building No 2Al Ameen Builders And Developers40A1, 40, 68A130-06-2026 00:00:00
Dz City - Building No 3Al Bari's Construction41 And 68A130-06-2026 00:00:00
Sukoon HeightsVirani Construction Company36/4, 37/1 , 37/201-04-2026 00:00:00
Aasra HeightNoble Construction CompanySurvey No 147, Hissa No C/1, Shil Dist Thane - 40061230-03-2023 00:00:00
Magnus MaryamShafi Syed400612, Thane31-03-2020 00:00:00
Sakaar ResidencyMohd Mukhtar Abdul Rauf KaziSurvey No 439, Plot No630-12-2021 00:00:00
Rameshwar Park - Daffodil ARameshawar Builders & Developers130-12-2022 00:00:00
Elite Residence - AElite Realty53/1/B And 54/1/B31-12-2026 00:00:00
Elite Residence - BElite Realty51B/1/C And 118B/1/B31-12-2026 00:00:00
Elite Residence - CElite Realty51/B/1/A And 118/B/1/A31-12-2026 00:00:00
Siddiquee ComplexSiddiquee Construction Co.110 2 C 111 1 A 111 1 C30-06-2022 00:00:00
Archit JewelArchit Enterprises71/2A And 71/2B30-05-2022 00:00:00
Saffron EnclavesGreen Avenue Constructions11/B130-09-2020 00:00:00
Quality Heights IQuality Construction CoSurvey No 190 Hissa No 1/B31-12-2018 00:00:00
KabiniShree Shakti DevelopersSurvey No 125 Hissa No 5 And 630-12-2021 00:00:00
Nice CityNice Realty And DevelopersSurvey No 184 Hissa No 2A And 2B30-12-2025 00:00:00
Project Details
  • Project:
    Al Balad Residency
  • Location:
  • S. No. 68/2 And S. No. 69/2
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Unity Infra
  • Phone:
  • Address:
  • Albalad Residency
Project RERA Details
MAHA REARA No: P51700053215
Project Type Residential / Group Housing
RERA Project Status New
Architect Suvarna Ghosh
Funding Bank INDIAN BANK
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 23 Oct 2023
Last Retrived 26 Jul 2025
Al Balad Residency QR Code
Al Balad Residency
MahaRERA - P51700053215
Apartment Details & Configuration
TypeArea
1 BHK35.48 Sq.mts. ( 382 Sq.ft. )
1 BHK36 Sq.mts. ( 388 Sq.ft. )
1 BHK38.64 Sq.mts. ( 416 Sq.ft. )
1 BHK40 Sq.mts. ( 431 Sq.ft. )
2 BHK53.49 Sq.mts. ( 576 Sq.ft. )
2 BHK65.12 Sq.mts. ( 701 Sq.ft. )
2 BHK65.71 Sq.mts. ( 707 Sq.ft. )
2 BHK68.48 Sq.mts. ( 737 Sq.ft. )
2 BHK68.54 Sq.mts. ( 738 Sq.ft. )
Office space9.43 Sq.mts. ( 102 Sq.ft. )
Office space11.27 Sq.mts. ( 121 Sq.ft. )
Office space11.31 Sq.mts. ( 122 Sq.ft. )
Office space12.9 Sq.mts. ( 139 Sq.ft. )
Office space14.44 Sq.mts. ( 155 Sq.ft. )
Office space21.84 Sq.mts. ( 235 Sq.ft. )
Office space23.68 Sq.mts. ( 255 Sq.ft. )
Office space28.22 Sq.mts. ( 304 Sq.ft. )
Shop24.1 Sq.mts. ( 259 Sq.ft. )
Shop27.15 Sq.mts. ( 292 Sq.ft. )
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )
2 BHK49.02 Sq.mts. ( 528 Sq.ft. )
2 BHK54.5 Sq.mts. ( 587 Sq.ft. )
2 BHK57.12 Sq.mts. ( 615 Sq.ft. )
1 BHK34.9 Sq.mts. ( 376 Sq.ft. )
2 BHK50.81 Sq.mts. ( 547 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Al Balad Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
As Per Approved Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approved Plan
Street Lighting
As Per Approved Plan
Treatment And Disposal Of Sewage And Sullage Water
As Per Approved Plan
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
As Per Approved Plan
Buildings / Wings in Al Balad Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Al Balad Residency by Unity Infralast updated on 26 Jul 2025 as per information obtained from MARA RERA.

43034 Sq. ft.

Project Area

608 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

117 apartments in total
Total
117
Booked
0
Available
117

Saleable Area Statistics (Sq. ft.)

56244 Total
Total
56244
Booked
0
Available
56244
Total 117 apartments in project. 0 apartments booked. 0% apartments booked.
Total 56244 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Al Balad Residency Bldg No 1 A And B Wings

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Al Balad Residency Bldg No 1 A And B WingsDec 202881020310
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.48 Sq.mts. ( 382 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK36 Sq.mts. ( 388 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.64 Sq.mts. ( 416 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK40 Sq.mts. ( 431 Sq.ft. )14
None Booked0% Booked
0% Booked
2 BHK53.49 Sq.mts. ( 576 Sq.ft. )14
None Booked0% Booked
0% Booked
2 BHK65.12 Sq.mts. ( 701 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK65.71 Sq.mts. ( 707 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK68.48 Sq.mts. ( 737 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK68.54 Sq.mts. ( 738 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space9.43 Sq.mts. ( 102 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space11.27 Sq.mts. ( 121 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space11.31 Sq.mts. ( 122 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space12.9 Sq.mts. ( 139 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space14.44 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space21.84 Sq.mts. ( 235 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space23.68 Sq.mts. ( 255 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space28.22 Sq.mts. ( 304 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.1 Sq.mts. ( 259 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop27.15 Sq.mts. ( 292 Sq.ft. )2
None Booked0% Booked
0% Booked
67 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Al Balad Residency Bldg No 1 A And B WingsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress25% done
25% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Al Balad Residency Bldg No 2 A And B Wings

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Al Balad Residency Bldg No 2 A And B WingsDec 202831020750
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK49.02 Sq.mts. ( 528 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK54.5 Sq.mts. ( 587 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK57.12 Sq.mts. ( 615 Sq.ft. )12
None Booked0% Booked
0% Booked
36 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Al Balad Residency Bldg No 2 A And B WingsCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Al Balad Residency Bldg No 3 A And B Wings

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Al Balad Residency Bldg No 3 A And B WingsDec 202821020210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.9 Sq.mts. ( 376 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK50.81 Sq.mts. ( 547 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK53.49 Sq.mts. ( 576 Sq.ft. )6
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Al Balad Residency Bldg No 3 A And B WingsCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Unity Infra
for Project
Al Balad Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation