Project overview
Al Abbas is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005893. Al Abbas is located at 56/1P 56/2P 90/1P And 44/1 And Cts No 4342 P 4349P 4354P 4356P. This is a Ongoing being developed by Ayman Infra Constructions.
Al Abbas has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 516 to 1028 Sq.ft. Carpet. The Project has total 208 of which 51 are currently available for sale.
Al Abbas is being developed on a total land area of 100985 Sq.ft. out of which 17361 Sq.ft. i.e 17% is reserved for recreational purposes. Al Abbas has 6 Wings / Towers Building 1,Building 2,Building 3,Building 4,Building 5,Building 6
| Project | Developer | Location | Possession |
| Ramkrushna Residency | Ramkrishna Developers | Thane | 31-12-2019 00:00:00 |
| Mahavir Dreamland | Mahavir Dreamland | 1284Paiki5, 1612Paiki 7 Paiki | 30-12-2022 00:00:00 |
| Shankheshwar Darshan Type - B | Ramesh Ghevarchand Tated | 1421 | 30-12-2021 00:00:00 |
| Munisuvrat Arc - Building 1 Plot 1 And Munisuvrat Royal - Building 2 On Plot 2 | Shree Munisuvrat Realty | 126/3P | 31-03-2019 00:00:00 |
| Amber Heights | Ace Construction | 4055 | 30-06-2021 00:00:00 |
| Krishna Vihar | Krishna Space | 48 34 Pt | 10-06-2018 00:00:00 |
| Chaitanya Heights | Jai Sai Enterprises | 49/8, 148/9, 148/8 | 30-12-2021 00:00:00 |
| Rabiya Residency | A R Construction | 4372 Part Plot No. 5 S No. 130, 47/1 | 30-09-2019 00:00:00 |
| M/S Simco Jyoti | Suresh Mithalal Jain | 164/6 | 30-09-2019 00:00:00 |
| Om Sai Home | M/S. Infini Developers | Survey No.134/1 | 30-06-2019 00:00:00 |
| Land Mark Residency | Riyaz Achhan Khan | 110/12/P | 31-12-2018 00:00:00 |
| Sai Dham Residency | Buildcon Engineers | 8682 | 31-12-2019 00:00:00 |
| K R Heights | Richi Rich Infrastructure | Opp Prithvi Residency | 30-12-2020 00:00:00 |
| Atlanta Residency Phase Ii | Sri Balaji Developer | 124/5/6/7/9/10, 125/8/10, 159/6. 161/5/8/14 | 31-12-2019 00:00:00 |
| Avd Avadh | Avd Infra India Private Limited | Thane, 421302, Kamatghar | 30-09-2020 00:00:00 |
| Shree Vastu | Patil Associates | 421302, Thane | 31-12-2017 00:00:00 |
| Siddhi Yashwant Complex | Siddharth Narayan Tangdi | 112/1 | 31-12-2018 00:00:00 |
| Zubeda Imam Ahmed Bharmal Appartment | Aamirbahauddin | 50254 | 28-02-2018 00:00:00 |
| Vardhaman Bhoomi Residency | Gandhi & Samani Associates | S.No 16 Hissa No 3Paiki,4A Paiki 6Paiki | 30-12-2023 00:00:00 |
| Varad Heights | Sharad Raghunath Mhatre | 49/48 | 30-12-2022 00:00:00 |
| Sai Somani Residency | Jai Ambe Developers | 421302 | 31-12-2020 00:00:00 |
| Sudarshan Enterprises | Haresh Kaluram Taware | Plot No 36 Cts No 3527 Survey No | 31-03-2019 00:00:00 |
| New Global E-Building | Classic Construction | Cts2053,2363,5210Sno637071 | 30-12-2021 00:00:00 |
| Sarathi Residency | Seema Vijay Nikam | 108/3 108/4 | 31-03-2018 00:00:00 |
| Al Abbas | Ayman Infra Constructions | 56/1P 56/2P 90/1P And 44/1 And Cts No 4342 P 4349P 4354P 4356P | 30-12-2023 00:00:00 |
| Harsh Raj Builders And Developers | Harsh Raj Builders And Developers | Cts No 1219/1220 | 31-03-2019 00:00:00 |
| Sarovar Darshan | Shri Khatu Construction | S No 15 1 2 P 22 | 31-03-2019 00:00:00 |
| Garden City | Pakshal Builders And Developers | 421302, Bhiwandi, Thane | 31-12-2027 00:00:00 |
| Gajanan Sankul | Mathura Realtor | 421302, Thane | 22-12-2020 00:00:00 |
| Nirmaldhara | Hazel Enterprise | 49/47/1, 49/40, 118/2 | 30-12-2021 00:00:00 |
| Atlanta Residency Phase I | Sri Balaji Developer | 124/5/6/7/9/10 | 31-03-2018 00:00:00 |
| Gayatri Krupa | Gayatri Builders | 131/1 | 30-12-2022 00:00:00 |
| Nandai Residency | Hari Om Developers | S.No 155 H.No7/3 Pt | 30-06-2020 00:00:00 |
| Silver Park Residency Aster | Suyash Enterprises | 49/22 P,49/23 P,143/2 P | 01-12-2023 00:00:00 |
| Surya Excellency | Suryakant Mangaldas Samani And Champaben Vasanji Mashru | 8145, 8146 | 30-03-2026 00:00:00 |
| K T Premia | K T & Co | 136/5,136/6 | 30-12-2023 00:00:00 |
| Gayatri Dham | Gayatri Builders | 131/1 | 31-03-2018 00:00:00 |
| Antaliya | Platinum Realty And Infrastructure Private Limited | S. No. 1641P, 1642P, 1643 | 30-12-2024 00:00:00 |
| Maitri Icon | Maitri & Maitri | Survey No. 4942, 535 And 538 | 30-12-2024 00:00:00 |
| Shri Varaladevi Residency | Mohan Machha | Thane, 421302 | 31-12-2020 00:00:00 |
| Sainath Estate | S S Developers | Thane, 421302 | 30-06-2020 00:00:00 |
| Kalpatru Enterprises | Bhawarlal Mohanlal Jain | 159/8 Paiki | 31-03-2019 00:00:00 |
| Silver Park Residency Orchid | Suyash Enterprises | 49 22 P 49 23 P 143 2 P | 30-12-2022 00:00:00 |
| Suncity Orion | Nestor Sai Developers Pvt Ltd | 142/1 Part And 142/2/2 | 31-12-2018 00:00:00 |
| MAHA REARA No: |
P51700005893 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
Ongoing |
| Architect |
Euroca Consultants |
| Funding Bank |
AXIS BANK |
| Proposed Possession |
30 Dec 2023 |
| Revised Possession |
30 Dec 2023 |
| Extended Possession |
30 Jun 2024 |
| Litigations |
No Litigations |
| Last Modified |
23 Nov 2024 |
| Last Retrived |
26 Jul 2025 |
Al Abbas QR Code
Al Abbas
MahaRERA - P51700005893
| Type | Area |
| 1 BHK | 47.97 Sq.mts. ( 516 Sq.ft. ) |
| 1 BHK | 49.97 Sq.mts. ( 538 Sq.ft. ) |
| 2 BHK | 68.16 Sq.mts. ( 734 Sq.ft. ) |
| 2 BHK | 71.13 Sq.mts. ( 766 Sq.ft. ) |
| 3 BHK | 91.75 Sq.mts. ( 988 Sq.ft. ) |
| 3 BHK | 95.5 Sq.mts. ( 1028 Sq.ft. ) |
| SHOP | 10 Sq.mts. ( 108 Sq.ft. ) |
| SHOP | 13.76 Sq.mts. ( 148 Sq.ft. ) |
| SHOP | 17.79 Sq.mts. ( 191 Sq.ft. ) |
| Shop | 19.23 Sq.mts. ( 207 Sq.ft. ) |
| SHOP | 22.9 Sq.mts. ( 246 Sq.ft. ) |
| 3 BHK | 92.54 Sq.mts. ( 996 Sq.ft. ) |
| SHOP | 17.42 Sq.mts. ( 188 Sq.ft. ) |
| SHOP | 21.56 Sq.mts. ( 232 Sq.ft. ) |
| SHOP | 22.42 Sq.mts. ( 241 Sq.ft. ) |
| SHOP | 25.92 Sq.mts. ( 279 Sq.ft. ) |
| SHOP | 29.04 Sq.mts. ( 313 Sq.ft. ) |
| SHOP | 18.35 Sq.mts. ( 198 Sq.ft. ) |
| SHOP | 9.74 Sq.mts. ( 105 Sq.ft. ) |
| SHOP | 19.28 Sq.mts. ( 208 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Al Abbaslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space100% completed
|
|
Finished |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
Finished |
Energy management100% completed
|
|
Finished |
Fire Protection And Fire Safety
Requirements100% completed
|
|
Finished |
Landscaping & Tree Planting100% completed
|
|
Finished |
Open Parking100% completed
|
|
Finished |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Finished |
Solid Waste Management And Disposal
|
|
Na |
Storm Water Drains100% completed
|
|
Finished |
Street Lighting100% completed
|
|
Finished |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting100% completed
|
|
Finished |
Water Supply100% completed
|
|
Finished |
Buildings / Wings in Al Abbas
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Al Abbas by Ayman Infra Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
208
apartments in total
Saleable Area Statistics (Sq. ft.)
135931
Total
Total 208 apartments in project. 157 apartments booked. 75% apartments booked.
Total 135931 Sq.ft. saleable area. 105322 saleable area booked.
77% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 1 | Jun 2023 | 8 | 1 | 0 | 1 | 0 | 9 | 9 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 47.97 Sq.mts. ( 516 Sq.ft. ) | 3 | |
| 1 BHK | 49.97 Sq.mts. ( 538 Sq.ft. ) | 4 | |
| 2 BHK | 68.16 Sq.mts. ( 734 Sq.ft. ) | 3 | |
| 2 BHK | 71.13 Sq.mts. ( 766 Sq.ft. ) | 11 | |
| 3 BHK | 91.75 Sq.mts. ( 988 Sq.ft. ) | 3 | |
| 3 BHK | 95.5 Sq.mts. ( 1028 Sq.ft. ) | 4 | |
| SHOP | 10 Sq.mts. ( 108 Sq.ft. ) | 1 | |
| SHOP | 13.76 Sq.mts. ( 148 Sq.ft. ) | 1 | |
| SHOP | 17.79 Sq.mts. ( 191 Sq.ft. ) | 1 | |
| Shop | 19.23 Sq.mts. ( 207 Sq.ft. ) | 1 | |
| SHOP | 22.9 Sq.mts. ( 246 Sq.ft. ) | 1 | |
33 total apartments / 32 apartments booked. 96% apartments booked. |
| Work Description in Building Building 1 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 2 | Jun 2023 | 8 | 1 | 0 | 1 | 0 | 15 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 49.97 Sq.mts. ( 538 Sq.ft. ) | 7 | |
| 2 BHK | 68.16 Sq.mts. ( 734 Sq.ft. ) | 3 | |
| 2 BHK | 71.13 Sq.mts. ( 766 Sq.ft. ) | 11 | |
| 3 BHK | 92.54 Sq.mts. ( 996 Sq.ft. ) | 3 | |
| 3 BHK | 95.5 Sq.mts. ( 1028 Sq.ft. ) | 4 | |
| SHOP | 10 Sq.mts. ( 108 Sq.ft. ) | 2 | |
| SHOP | 13.76 Sq.mts. ( 148 Sq.ft. ) | 2 | |
| SHOP | 17.42 Sq.mts. ( 188 Sq.ft. ) | 2 | |
| SHOP | 21.56 Sq.mts. ( 232 Sq.ft. ) | 1 | |
| SHOP | 22.42 Sq.mts. ( 241 Sq.ft. ) | 1 | |
| SHOP | 22.9 Sq.mts. ( 246 Sq.ft. ) | 1 | |
| SHOP | 25.92 Sq.mts. ( 279 Sq.ft. ) | 1 | |
| SHOP | 29.04 Sq.mts. ( 313 Sq.ft. ) | 1 | |
39 total apartments / 38 apartments booked. 97% apartments booked. |
| Work Description in Building Building 2 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 3 | Jun 2023 | 8 | 1 | 0 | 1 | 0 | 8 | 10 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 49.97 Sq.mts. ( 538 Sq.ft. ) | 7 | |
| 2 BHK | 68.16 Sq.mts. ( 734 Sq.ft. ) | 3 | |
| 2 BHK | 71.13 Sq.mts. ( 766 Sq.ft. ) | 11 | |
| 3 BHK | 92.54 Sq.mts. ( 996 Sq.ft. ) | 3 | |
| 3 BHK | 95.5 Sq.mts. ( 1028 Sq.ft. ) | 4 | |
| SHOP | 13.76 Sq.mts. ( 148 Sq.ft. ) | 2 | |
| SHOP | 17.79 Sq.mts. ( 191 Sq.ft. ) | 1 | |
| SHOP | 18.35 Sq.mts. ( 198 Sq.ft. ) | 3 | |
34 total apartments / 32 apartments booked. 94% apartments booked. |
| Work Description in Building Building 3 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 4 | Jun 2023 | 8 | 1 | 0 | 1 | 0 | 15 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 49.97 Sq.mts. ( 538 Sq.ft. ) | 7 | |
| 2 BHK | 68.16 Sq.mts. ( 734 Sq.ft. ) | 3 | |
| 2 BHK | 71.13 Sq.mts. ( 766 Sq.ft. ) | 11 | |
| 3 BHK | 91.75 Sq.mts. ( 988 Sq.ft. ) | 3 | |
| 3 BHK | 95.5 Sq.mts. ( 1028 Sq.ft. ) | 4 | |
| SHOP | 9.74 Sq.mts. ( 105 Sq.ft. ) | 1 | |
| SHOP | 10 Sq.mts. ( 108 Sq.ft. ) | 2 | |
| SHOP | 13.76 Sq.mts. ( 148 Sq.ft. ) | 2 | |
| SHOP | 17.42 Sq.mts. ( 188 Sq.ft. ) | 2 | |
| SHOP | 19.28 Sq.mts. ( 208 Sq.ft. ) | 1 | |
| SHOP | 21.56 Sq.mts. ( 232 Sq.ft. ) | 1 | |
| SHOP | 22.42 Sq.mts. ( 241 Sq.ft. ) | 1 | |
| SHOP | 22.9 Sq.mts. ( 246 Sq.ft. ) | 1 | |
| SHOP | 25.92 Sq.mts. ( 279 Sq.ft. ) | 1 | |
40 total apartments / 31 apartments booked. 77% apartments booked. |
| Work Description in Building Building 4 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 5 | Jun 2023 | 8 | 1 | 0 | 1 | 0 | 9 | 9 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 49.97 Sq.mts. ( 538 Sq.ft. ) | 7 | |
| 2 BHK | 68.16 Sq.mts. ( 734 Sq.ft. ) | 6 | |
| 2 BHK | 71.13 Sq.mts. ( 766 Sq.ft. ) | 8 | |
| 3 BHK | 92.54 Sq.mts. ( 996 Sq.ft. ) | 3 | |
| 3 BHK | 95.5 Sq.mts. ( 1028 Sq.ft. ) | 4 | |
| SHOP | 10 Sq.mts. ( 108 Sq.ft. ) | 1 | |
| SHOP | 13.76 Sq.mts. ( 148 Sq.ft. ) | 2 | |
| SHOP | 17.42 Sq.mts. ( 188 Sq.ft. ) | 1 | |
| SHOP | 18.35 Sq.mts. ( 198 Sq.ft. ) | 1 | |
| SHOP | 21.56 Sq.mts. ( 232 Sq.ft. ) | 1 | |
34 total apartments / 24 apartments booked. 70% apartments booked. |
| Work Description in Building Building 5 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 6 | Jun 2023 | 8 | 1 | 0 | 1 | 0 | 1 | 16 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 47.97 Sq.mts. ( 516 Sq.ft. ) | 3 | |
| 1 BHK | 49.97 Sq.mts. ( 538 Sq.ft. ) | 4 | |
| 2 BHK | 68.16 Sq.mts. ( 734 Sq.ft. ) | 6 | |
| 2 BHK | 71.13 Sq.mts. ( 766 Sq.ft. ) | 8 | |
| 3 BHK | 91.75 Sq.mts. ( 988 Sq.ft. ) | 3 | |
| 3 BHK | 95.5 Sq.mts. ( 1028 Sq.ft. ) | 4 | |
28 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building 6 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Ayman Infra Constructions
for Project
Al Abbas
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |