Project overview

Al Abbas is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005893. Al Abbas is located at 56/1P 56/2P 90/1P And 44/1 And Cts No 4342 P 4349P 4354P 4356P. This is a Ongoing being developed by Ayman Infra Constructions.

Al Abbas has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 516 to 1028 Sq.ft. Carpet. The Project has total 208 of which 51 are currently available for sale.

Al Abbas is being developed on a total land area of 100985 Sq.ft. out of which 17361 Sq.ft. i.e 17% is reserved for recreational purposes. Al Abbas has 6 Wings / Towers Building 1,Building 2,Building 3,Building 4,Building 5,Building 6

ProjectDeveloperLocationPossession
Ramkrushna ResidencyRamkrishna DevelopersThane31-12-2019 00:00:00
Mahavir DreamlandMahavir Dreamland1284Paiki5, 1612Paiki 7 Paiki30-12-2022 00:00:00
Shankheshwar Darshan Type - BRamesh Ghevarchand Tated142130-12-2021 00:00:00
Munisuvrat Arc - Building 1 Plot 1 And Munisuvrat Royal - Building 2 On Plot 2Shree Munisuvrat Realty126/3P31-03-2019 00:00:00
Amber HeightsAce Construction405530-06-2021 00:00:00
Krishna ViharKrishna Space48 34 Pt10-06-2018 00:00:00
Chaitanya HeightsJai Sai Enterprises49/8, 148/9, 148/830-12-2021 00:00:00
Rabiya ResidencyA R Construction4372 Part Plot No. 5 S No. 130, 47/130-09-2019 00:00:00
M/S Simco JyotiSuresh Mithalal Jain164/630-09-2019 00:00:00
Om Sai HomeM/S. Infini DevelopersSurvey No.134/130-06-2019 00:00:00
Land Mark ResidencyRiyaz Achhan Khan110/12/P31-12-2018 00:00:00
Sai Dham ResidencyBuildcon Engineers868231-12-2019 00:00:00
K R HeightsRichi Rich InfrastructureOpp Prithvi Residency30-12-2020 00:00:00
Atlanta Residency Phase IiSri Balaji Developer124/5/6/7/9/10, 125/8/10, 159/6. 161/5/8/1431-12-2019 00:00:00
Avd AvadhAvd Infra India Private LimitedThane, 421302, Kamatghar30-09-2020 00:00:00
Shree VastuPatil Associates421302, Thane31-12-2017 00:00:00
Siddhi Yashwant ComplexSiddharth Narayan Tangdi112/131-12-2018 00:00:00
Zubeda Imam Ahmed Bharmal AppartmentAamirbahauddin5025428-02-2018 00:00:00
Vardhaman Bhoomi ResidencyGandhi & Samani AssociatesS.No 16 Hissa No 3Paiki,4A Paiki 6Paiki30-12-2023 00:00:00
Varad HeightsSharad Raghunath Mhatre49/4830-12-2022 00:00:00
Sai Somani ResidencyJai Ambe Developers42130231-12-2020 00:00:00
Sudarshan EnterprisesHaresh Kaluram TawarePlot No 36 Cts No 3527 Survey No31-03-2019 00:00:00
New Global E-BuildingClassic ConstructionCts2053,2363,5210Sno63707130-12-2021 00:00:00
Sarathi ResidencySeema Vijay Nikam108/3 108/431-03-2018 00:00:00
Al AbbasAyman Infra Constructions56/1P 56/2P 90/1P And 44/1 And Cts No 4342 P 4349P 4354P 4356P30-12-2023 00:00:00
Harsh Raj Builders And DevelopersHarsh Raj Builders And DevelopersCts No 1219/122031-03-2019 00:00:00
Sarovar DarshanShri Khatu ConstructionS No 15 1 2 P 2231-03-2019 00:00:00
Garden CityPakshal Builders And Developers421302, Bhiwandi, Thane31-12-2027 00:00:00
Gajanan SankulMathura Realtor421302, Thane22-12-2020 00:00:00
NirmaldharaHazel Enterprise49/47/1, 49/40, 118/230-12-2021 00:00:00
Atlanta Residency Phase ISri Balaji Developer124/5/6/7/9/1031-03-2018 00:00:00
Gayatri KrupaGayatri Builders131/130-12-2022 00:00:00
Nandai ResidencyHari Om DevelopersS.No 155 H.No7/3 Pt30-06-2020 00:00:00
Silver Park Residency AsterSuyash Enterprises49/22 P,49/23 P,143/2 P01-12-2023 00:00:00
Surya ExcellencySuryakant Mangaldas Samani And Champaben Vasanji Mashru8145, 814630-03-2026 00:00:00
K T PremiaK T & Co136/5,136/630-12-2023 00:00:00
Gayatri DhamGayatri Builders131/131-03-2018 00:00:00
AntaliyaPlatinum Realty And Infrastructure Private LimitedS. No. 1641P, 1642P, 164330-12-2024 00:00:00
Maitri IconMaitri & MaitriSurvey No. 4942, 535 And 53830-12-2024 00:00:00
Shri Varaladevi ResidencyMohan MachhaThane, 42130231-12-2020 00:00:00
Sainath EstateS S DevelopersThane, 42130230-06-2020 00:00:00
Kalpatru EnterprisesBhawarlal Mohanlal Jain159/8 Paiki31-03-2019 00:00:00
Silver Park Residency OrchidSuyash Enterprises49 22 P 49 23 P 143 2 P30-12-2022 00:00:00
Suncity OrionNestor Sai Developers Pvt Ltd142/1 Part And 142/2/231-12-2018 00:00:00
Project Details
  • Project:
    Al Abbas
  • Location:
  • 56/1P 56/2P 90/1P And 44/1 And Cts No 4342 P 4349P 4354P 4356P
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Ayman Infra Constructions
  • Phone:
  • Address:
  • Arsh Residency
Project RERA Details
MAHA REARA No: P51700005893
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Euroca Consultants
Funding Bank AXIS BANK
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession 30 Jun 2024
Litigations No Litigations
Last Modified 23 Nov 2024
Last Retrived 26 Jul 2025
Al Abbas QR Code
Al Abbas
MahaRERA - P51700005893
Apartment Details & Configuration
TypeArea
1 BHK47.97 Sq.mts. ( 516 Sq.ft. )
1 BHK49.97 Sq.mts. ( 538 Sq.ft. )
2 BHK68.16 Sq.mts. ( 734 Sq.ft. )
2 BHK71.13 Sq.mts. ( 766 Sq.ft. )
3 BHK91.75 Sq.mts. ( 988 Sq.ft. )
3 BHK95.5 Sq.mts. ( 1028 Sq.ft. )
SHOP10 Sq.mts. ( 108 Sq.ft. )
SHOP13.76 Sq.mts. ( 148 Sq.ft. )
SHOP17.79 Sq.mts. ( 191 Sq.ft. )
Shop19.23 Sq.mts. ( 207 Sq.ft. )
SHOP22.9 Sq.mts. ( 246 Sq.ft. )
3 BHK92.54 Sq.mts. ( 996 Sq.ft. )
SHOP17.42 Sq.mts. ( 188 Sq.ft. )
SHOP21.56 Sq.mts. ( 232 Sq.ft. )
SHOP22.42 Sq.mts. ( 241 Sq.ft. )
SHOP25.92 Sq.mts. ( 279 Sq.ft. )
SHOP29.04 Sq.mts. ( 313 Sq.ft. )
SHOP18.35 Sq.mts. ( 198 Sq.ft. )
SHOP9.74 Sq.mts. ( 105 Sq.ft. )
SHOP19.28 Sq.mts. ( 208 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Al Abbaslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Finished
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Finished
Energy management100% completed
95% Complete
Finished
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Finished
Landscaping & Tree Planting100% completed
95% Complete
Finished
Open Parking100% completed
95% Complete
Finished
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Finished
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Finished
Street Lighting100% completed
95% Complete
Finished
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Finished
Water Supply100% completed
95% Complete
Finished
Buildings / Wings in Al Abbas
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Al Abbas by Ayman Infra Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

100985 Sq. ft.

Project Area

17361 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

208 apartments in total
Total
208
Booked
157
Available
51

Saleable Area Statistics (Sq. ft.)

135931 Total
Total
135931
Booked
105322
Available
30609
Total 208 apartments in project. 157 apartments booked. 75% apartments booked.
Total 135931 Sq.ft. saleable area. 105322 saleable area booked.
77% area booked.

Building 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1Jun 20238101099
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK47.97 Sq.mts. ( 516 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK49.97 Sq.mts. ( 538 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK68.16 Sq.mts. ( 734 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK71.13 Sq.mts. ( 766 Sq.ft. )11
10 Booked90% Booked
90% Booked
3 BHK91.75 Sq.mts. ( 988 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK95.5 Sq.mts. ( 1028 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.76 Sq.mts. ( 148 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.79 Sq.mts. ( 191 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.23 Sq.mts. ( 207 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP22.9 Sq.mts. ( 246 Sq.ft. )1
1 Booked100% Booked
100% Booked
33 total apartments / 32 apartments booked. 96% apartments booked.
Work Description in Building Building 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2Jun 202381010153
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK49.97 Sq.mts. ( 538 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK68.16 Sq.mts. ( 734 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK71.13 Sq.mts. ( 766 Sq.ft. )11
11 Booked100% Booked
100% Booked
3 BHK92.54 Sq.mts. ( 996 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK95.5 Sq.mts. ( 1028 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP13.76 Sq.mts. ( 148 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP17.42 Sq.mts. ( 188 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP21.56 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.42 Sq.mts. ( 241 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP22.9 Sq.mts. ( 246 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP25.92 Sq.mts. ( 279 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP29.04 Sq.mts. ( 313 Sq.ft. )1
1 Booked100% Booked
100% Booked
39 total apartments / 38 apartments booked. 97% apartments booked.
Work Description in Building Building 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 3Jun 202381010810
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK49.97 Sq.mts. ( 538 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK68.16 Sq.mts. ( 734 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK71.13 Sq.mts. ( 766 Sq.ft. )11
11 Booked100% Booked
100% Booked
3 BHK92.54 Sq.mts. ( 996 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK95.5 Sq.mts. ( 1028 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP13.76 Sq.mts. ( 148 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP17.79 Sq.mts. ( 191 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.35 Sq.mts. ( 198 Sq.ft. )3
2 Booked66% Booked
66% Booked
34 total apartments / 32 apartments booked. 94% apartments booked.
Work Description in Building Building 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 4Jun 202381010153
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK49.97 Sq.mts. ( 538 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK68.16 Sq.mts. ( 734 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK71.13 Sq.mts. ( 766 Sq.ft. )11
11 Booked100% Booked
100% Booked
3 BHK91.75 Sq.mts. ( 988 Sq.ft. )3
1 Booked33% Booked
33% Booked
3 BHK95.5 Sq.mts. ( 1028 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP9.74 Sq.mts. ( 105 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP13.76 Sq.mts. ( 148 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP17.42 Sq.mts. ( 188 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP19.28 Sq.mts. ( 208 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP21.56 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.42 Sq.mts. ( 241 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.9 Sq.mts. ( 246 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP25.92 Sq.mts. ( 279 Sq.ft. )1
1 Booked100% Booked
100% Booked
40 total apartments / 31 apartments booked. 77% apartments booked.
Work Description in Building Building 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 5Jun 20238101099
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK49.97 Sq.mts. ( 538 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK68.16 Sq.mts. ( 734 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK71.13 Sq.mts. ( 766 Sq.ft. )8
6 Booked75% Booked
75% Booked
3 BHK92.54 Sq.mts. ( 996 Sq.ft. )3
2 Booked66% Booked
66% Booked
3 BHK95.5 Sq.mts. ( 1028 Sq.ft. )4
3 Booked75% Booked
75% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.76 Sq.mts. ( 148 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP17.42 Sq.mts. ( 188 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.35 Sq.mts. ( 198 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP21.56 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
34 total apartments / 24 apartments booked. 70% apartments booked.
Work Description in Building Building 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 6Jun 202381010116
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK47.97 Sq.mts. ( 516 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK49.97 Sq.mts. ( 538 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK68.16 Sq.mts. ( 734 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK71.13 Sq.mts. ( 766 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHK91.75 Sq.mts. ( 988 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK95.5 Sq.mts. ( 1028 Sq.ft. )4
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building 6Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Ayman Infra Constructions
for Project
Al Abbas
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation