Project overview

Akshar Emperia Garden is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000011872. Akshar Emperia Garden is located at Survey No- 22. This is a Ongoing being developed by Emperia Realty.

Akshar Emperia Garden has 1 BHK & 1 RK Apartments with carpet areas ranging from 184 to 285 Sq.ft. Carpet. The Project has total 307 of which 98 are currently available for sale.

Akshar Emperia Garden is being developed on a total land area of 96876 Sq.ft. out of which 9649 Sq.ft. i.e 10% is reserved for recreational purposes. Akshar Emperia Garden has 4 Wings / Towers Aster,Orchid,Rose,Tulip

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Akshar Emperia Garden
  • Location:
  • Survey No- 22
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Emperia Realty
  • Phone:
  • Address:
  • J.K. Chambers
Project RERA Details
MAHA REARA No: P52000011872
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect An.Arch
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 06 Aug 2018
Last Retrived 28 Jul 2025
Akshar Emperia Garden QR Code
Akshar Emperia Garden
MahaRERA - P52000011872
Apartment Details & Configuration
TypeArea
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )
1 BHK24.96 Sq.mts. ( 269 Sq.ft. )
1 RK17.12 Sq.mts. ( 184 Sq.ft. )
1 RK17.69 Sq.mts. ( 190 Sq.ft. )
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Akshar Emperia Gardenlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Yet To Be Commence
Community Buildings75% completed
75% Complete
Work Yet To Be Commence
Electrical Meter Room, Sub-Station, Receiving Station
Work Yet To Be Commence
Energy management
Na
Fire Protection And Fire Safety Requirements
Work Yet To Be Commence
Landscaping & Tree Planting
Work Yet To Be Commence
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Work Yet To Be Commence
Solid Waste Management And Disposal
Work Yet To Be Commence
Storm Water Drains
Work Yet To Be Commence
Street Lighting
Work Yet To Be Commence
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Yet To Be Commence
Water Supply
Work Yet To Be Commence
Buildings / Wings in Akshar Emperia Garden
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Akshar Emperia Garden by Emperia Realtylast updated on 28 Jul 2025 as per information obtained from MARA RERA.

96876 Sq. ft.

Project Area

9649 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

307 apartments in total
Total
307
Booked
209
Available
98

Saleable Area Statistics (Sq. ft.)

76440 Total
Total
76440
Booked
50726
Available
25713
Total 307 apartments in project. 209 apartments booked. 68% apartments booked.
Total 76440 Sq.ft. saleable area. 50726 saleable area booked.
66% area booked.

Aster

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AsterDec 20228101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )56
37 Booked66% Booked
66% Booked
1 BHK24.96 Sq.mts. ( 269 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 RK17.12 Sq.mts. ( 184 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 RK17.69 Sq.mts. ( 190 Sq.ft. )7
5 Booked71% Booked
71% Booked
77 total apartments / 52 apartments booked. 67% apartments booked.
Work Description in Building AsterCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress97% done
97% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

Orchid

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
OrchidDec 20228101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )55
29 Booked52% Booked
52% Booked
1 BHK24.96 Sq.mts. ( 269 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 RK17.12 Sq.mts. ( 184 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 RK17.69 Sq.mts. ( 190 Sq.ft. )7
7 Booked100% Booked
100% Booked
76 total apartments / 47 apartments booked. 61% apartments booked.
Work Description in Building OrchidCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress97% done
97% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

Rose

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
RoseDec 20228101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )49
33 Booked67% Booked
67% Booked
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 RK17.12 Sq.mts. ( 184 Sq.ft. )14
13 Booked92% Booked
92% Booked
1 RK17.69 Sq.mts. ( 190 Sq.ft. )7
6 Booked85% Booked
85% Booked
77 total apartments / 58 apartments booked. 75% apartments booked.
Work Description in Building RoseCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress96% done
96% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress92% done
92% Booked
Stilt Floor
Completed 100% done
100% Booked

Tulip

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TulipDec 20228101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )49
28 Booked57% Booked
57% Booked
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )7
3 Booked42% Booked
42% Booked
1 RK17.12 Sq.mts. ( 184 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 RK17.69 Sq.mts. ( 190 Sq.ft. )7
7 Booked100% Booked
100% Booked
77 total apartments / 52 apartments booked. 67% apartments booked.
Work Description in Building TulipCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress89% done
89% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress87% done
87% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Emperia Realty
for Project
Akshar Emperia Garden
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation