Project overview

Akash Ganga is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017384. Akash Ganga is located at Survey No 150 Plot No 2, Survey No 153. This is a New being developed by Ashish Waman Gole.

Akash Ganga has 1 BHK & 2 BHK Apartments with carpet areas ranging from 357 to 519 Sq.ft. Carpet. The Project has total 79 of which 79 are currently available for sale.

Akash Ganga is being developed on a total land area of 48881 Sq.ft. Akash Ganga has 2 Wings / Towers Building A,Building B

ProjectDeveloperLocationPossession
Deep Laxmi HeightDeeplaxmi HeightsBhiwandi30-12-2024 00:00:00
Lodha Bellavista - Wing B1Macrotech Developers LimitedGat No.61/1/1,2,3,4 30-12-2025 00:00:00
Fennelia CommercialAcme Housing India Private LimitedGat No 61/1/1,2,330-12-2025 00:00:00
Nasheman-E-ZohraM M Builders &Amp; Developers421302, Thane, Bhiwandi01-03-2026 00:00:00
Sun City Phase ISunrise DevelopersThane15-03-2026 00:00:00
Shree Ganesha EnterprisesShree Ganesha EnterprisesThane, Kopar30-12-2022 00:00:00
Sai Vaibhav ParadiseShree Sai DevelopersOld Survey No. 165, New Survey No. 26 Hissa No.330-06-2022 00:00:00
Salasar Exotica - ISalasar AssociatesSurvey No 7630-06-2025 00:00:00
Pushkar Co Op Hsg Society PraposedAmeya DevelopersCts No 823 824 S No 93A Plot No 88 8912-02-2024 00:00:00
Centrum Business Square Phase 1Squarefeet ConstructionD 130-06-2027 00:00:00
Shruti ApartmentVikrant V Raikar Huf - -Plot No 9 Sector 23 Ghansoli30-11-2023 00:00:00
Jasmine ResidencyA.A.Corp.Survey No 5/9 5/10 6/6A 6/724-11-2025 00:00:00
Sai Aashiyana - IiSai Sakshi DevelopersSurvey No 81 5 A 81 5 B30-06-2026 00:00:00
Aashray Aanand Phase-IiDream CorprationS.No-140/2A,141/1B And 141/1/E/5/B/130-11-2022 00:00:00
Maatr WatersMaatr Enterprises24/1 12/430-09-2023 00:00:00
Bhagwat And Jay VyankateshChaturthi Vastu Developers804 A B30-06-2027 00:00:00
Khushi ApartmentPavan Hastimal JainPlot No 113 22-05-2023 00:00:00
Shree Mangalmurti Builders And DevelopersVasanti Kashinath ChaudhariS No 65/4/1 Part Plot No 1130-09-2022 00:00:00
Larkins 315 Fio-AM/S Pushpak Developers31531-12-2024 00:00:00
Siddhakala HeightsRushabh Developers40060430-06-2024 00:00:00
Samruddhi ResidencyShree Sai Ganesh Developers16630-06-2025 00:00:00
Satyam Seven SkiesJai Jalaram EnterprisesPlot No.7A, Sector 17, Kharghar30-06-2024 00:00:00
Sai Kripa ResidencyGokuldham Builders &Amp; DevelopersThane, 42100310-04-2024 00:00:00
Indra NeelSonam Spark Infra Private Limited444/2B30-06-2026 00:00:00
Mahalaxmi ResidencySanjay Vasant ThakkarTika No 12 Cts No 59A30-06-2023 00:00:00
L M TowerL M Realty110/8, 110/1228-08-2023 00:00:00
Wisteria Square 1Rajdeep Realtors & Developers Pvt LtdS No 105 1 Pt And 2 Pt30-06-2024 00:00:00
Srushti Residency Building EPappu Developers & GroupS. No 69-21 And 28-3130-06-2024 00:00:00
Panvelkar PrestigeEshan DevelopersGut No 11 Plot No 13 14 15 16 17 18 19 20 21 Pt Cts No 928830-06-2024 00:00:00
Gulmohar Pink CityAmi Buildcon935330-06-2023 00:00:00
Kings CourtAmi Sai Construction35230-06-2023 00:00:00
Sector 2A - Wing BEversmile Properties Private LimitedNew Survey No 66Pt And 68Pt Of Village Penkarpada30-12-2027 00:00:00
Al Amin TowerS V BuildersBhiwandi30-06-2023 00:00:00
Hema KunjBhadrankar Enterprises LlpCts No 1618, New Survey No 359, H. Nos 2/1D And 1F28-08-2023 00:00:00
Maatr SkyeMaatr Ventures78/2/130-09-2025 00:00:00
Chadha ResidencyChadha Developers And PromotersG.No 21, 1361,2 G.No. 1386, 1410 At Karav G.No 262,3,4 G.No 281B,1C,1D,1E,2A,2B,2C,2D,4 And G.No 324,343,371,230-09-2026 00:00:00
Rai S NisargRai Residency Private LimitedKalyan E31-12-2025 00:00:00
The Icon Phase 3Leading Frontier Private Limited61/2F, 61/2G31-12-2026 00:00:00
The Icon Phase 4Leading Frontier Private Limited6021, 602231-12-2026 00:00:00
Jadhav GadhShree Samarth DevelopersSr No 13 H No 1031-12-2022 00:00:00
Sector 2A - Wing AEversmile Properties Private LimitedNew Survey No.68 Pt Of Village Penkarpada30-06-2027 00:00:00
Arihant City Phase-Ii - A BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Arihant City Phase-Ii - B BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Arihant City Phase-Ii - C BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Shree Mauli PrabhaShree Prabha ConstructionCts No 8872 8873 Plot No 2031-07-2024 00:00:00
Siddhivinayak MahimaSiddhivinayak Realty32028-08-2022 00:00:00
Project Details
  • Project:
    Akash Ganga
  • Location:
  • Survey No 150 Plot No 2, Survey No 153
  • Const. Stage:
    New
  • Possession:
    30 May 2023
Developer Details

  • Developer:
    Ashish Waman Gole
  • Phone:
  • Address:
  • Gole House
Project RERA Details
MAHA REARA No: P51700017384
Project Type Residential / Group Housing
RERA Project Status New
Architect Architects Inc
Funding Bank IDBI BANK
Proposed Possession 30 May 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Aug 2018
Last Retrived 26 Jul 2025
Akash Ganga QR Code
Akash Ganga
MahaRERA - P51700017384
Apartment Details & Configuration
TypeArea
1 BHK28.84 Sq.mts. ( 310 Sq.ft. )
1 BHK29.99 Sq.mts. ( 323 Sq.ft. )
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )
1 BHK35.93 Sq.mts. ( 387 Sq.ft. )
1 BHK42.07 Sq.mts. ( 453 Sq.ft. )
2 BHK45.72 Sq.mts. ( 492 Sq.ft. )
2 BHK45.75 Sq.mts. ( 492 Sq.ft. )
Basement185.81 Sq.mts. ( 2000 Sq.ft. )
Office54.19 Sq.mts. ( 583 Sq.ft. )
Office34.27 Sq.mts. ( 369 Sq.ft. )
Shop5.88 Sq.mts. ( 63 Sq.ft. )
Shop8.95 Sq.mts. ( 96 Sq.ft. )
Shop8.98 Sq.mts. ( 97 Sq.ft. )
Shop9.74 Sq.mts. ( 105 Sq.ft. )
Shop11.61 Sq.mts. ( 125 Sq.ft. )
Shop12.03 Sq.mts. ( 129 Sq.ft. )
Shop12.21 Sq.mts. ( 131 Sq.ft. )
Shop15.45 Sq.mts. ( 166 Sq.ft. )
Shop17.6 Sq.mts. ( 189 Sq.ft. )
1 BHK33.18 Sq.mts. ( 357 Sq.ft. )
1 BHK34.22 Sq.mts. ( 368 Sq.ft. )
1 BHK35.06 Sq.mts. ( 377 Sq.ft. )
1 BHK35.08 Sq.mts. ( 378 Sq.ft. )
1 BHK35.6 Sq.mts. ( 383 Sq.ft. )
1 BHK36.12 Sq.mts. ( 389 Sq.ft. )
1 BHK36.13 Sq.mts. ( 389 Sq.ft. )
2 BHK48.04 Sq.mts. ( 517 Sq.ft. )
2 BHK48.24 Sq.mts. ( 519 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Akash Gangalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
0
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Sewer Line
Solid Waste Management And Disposal
Disposal Through Municipal Systems
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
Water Pipe Line By M.J.P.
Buildings / Wings in Akash Ganga
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Akash Ganga by Ashish Waman Golelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

48881 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

79 apartments in total
Total
79
Booked
0
Available
79

Saleable Area Statistics (Sq. ft.)

29276 Total
Total
29276
Booked
0
Available
29276
Total 79 apartments in project. 0 apartments booked. 0% apartments booked.
Total 29276 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building AMay 20228110002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.84 Sq.mts. ( 310 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK29.99 Sq.mts. ( 323 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK35.93 Sq.mts. ( 387 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK42.07 Sq.mts. ( 453 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK45.72 Sq.mts. ( 492 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK45.75 Sq.mts. ( 492 Sq.ft. )1
None Booked0% Booked
0% Booked
Basement185.81 Sq.mts. ( 2000 Sq.ft. )1
None Booked0% Booked
0% Booked
Office54.19 Sq.mts. ( 583 Sq.ft. )1
None Booked0% Booked
0% Booked
Office34.27 Sq.mts. ( 369 Sq.ft. )1
None Booked0% Booked
0% Booked
Office29.99 Sq.mts. ( 323 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop5.88 Sq.mts. ( 63 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop8.95 Sq.mts. ( 96 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop8.98 Sq.mts. ( 97 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop9.74 Sq.mts. ( 105 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.61 Sq.mts. ( 125 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.03 Sq.mts. ( 129 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.21 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.45 Sq.mts. ( 166 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop17.6 Sq.mts. ( 189 Sq.ft. )1
None Booked0% Booked
0% Booked
61 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BMay 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.18 Sq.mts. ( 357 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.22 Sq.mts. ( 368 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.06 Sq.mts. ( 377 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.08 Sq.mts. ( 378 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.6 Sq.mts. ( 383 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.12 Sq.mts. ( 389 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK36.13 Sq.mts. ( 389 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK48.04 Sq.mts. ( 517 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK48.24 Sq.mts. ( 519 Sq.ft. )2
None Booked0% Booked
0% Booked
18 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Ashish Waman Gole
for Project
Akash Ganga
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation