Project overview

Aikyam is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000048020. Aikyam is located at Survey No 25/1 Rohinjan. This is a New being developed by Today Royal Infracon.

Aikyam has 2 BHK Apartments with carpet areas ranging from 517 to 561 Sq.ft. Carpet. The Project has total 343 of which 199 are currently available for sale.

Aikyam is being developed on a total land area of 134119 Sq.ft. out of which 13412 Sq.ft. i.e 10% is reserved for recreational purposes. Aikyam has 4 Wings / Towers A Wing,B Wing,C Wing,D Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Aikyam
  • Location:
  • Survey No 25/1 Rohinjan
  • Const. Stage:
    New
  • Possession:
    31 Oct 2027
Developer Details

  • Developer:
    Today Royal Infracon
  • Phone:
  • Address:
  • The Landmark
Project RERA Details
MAHA REARA No: P52000048020
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 31 Oct 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Oct 2024
Last Retrived 28 Jul 2025
Aikyam QR Code
Aikyam
MahaRERA - P52000048020
Apartment Details & Configuration
TypeArea
1 BHK33.75 Sq.mts. ( 363 Sq.ft. )
1 BHK37.25 Sq.mts. ( 401 Sq.ft. )
2 BHK43.41 Sq.mts. ( 467 Sq.ft. )
2 BHK48.8 Sq.mts. ( 525 Sq.ft. )
1 BHK36.79 Sq.mts. ( 396 Sq.ft. )
2 BHK47.99 Sq.mts. ( 517 Sq.ft. )
2 BHK52.16 Sq.mts. ( 561 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aikyamlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Commenced. Will Be Provided As Per Udcpr
Community Buildings
Not Commenced. Will Be Provided As Per Udcpr
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided As Per Udcpr Or Mseb Requirement
Energy management
Will Be Provided As Per Udcpr And Moef Noc
Fire Protection And Fire Safety Requirements
Not Commenced. Will Be Provided As Per Cfo Noc
Landscaping & Tree Planting
Not Commenced. Will Be Provided As Per Udcpr
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Commenced. Will Be Provided As Per Udcpr
Solid Waste Management And Disposal
Not Commenced. Will Be Provided As Per Udcpr
Storm Water Drains
Not Commenced. Will Be Provided As Per Udcpr
Street Lighting
Not Commenced. Will Be Provided As Per Udcpr
Treatment And Disposal Of Sewage And Sullage Water
Will Be Provided As Per Udcpr And Moef Noc
Water Conservation, Rain water Harvesting
Not Commenced. Will Be Provided As Per Udcpr
Water Supply
Not Commenced. Will Be Provided As Per Udcpr
Buildings / Wings in Aikyam
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aikyam by Today Royal Infraconlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

134119 Sq. ft.

Project Area

13412 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

343 apartments in total
Total
343
Booked
144
Available
199

Saleable Area Statistics (Sq. ft.)

168221 Total
Total
168221
Booked
68253
Available
99969
Total 343 apartments in project. 144 apartments booked. 41% apartments booked.
Total 168221 Sq.ft. saleable area. 68253 saleable area booked.
41% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingOct 20271410121628
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.75 Sq.mts. ( 363 Sq.ft. )37
27 Booked72% Booked
72% Booked
1 BHK37.25 Sq.mts. ( 401 Sq.ft. )9
5 Booked55% Booked
55% Booked
2 BHK43.41 Sq.mts. ( 467 Sq.ft. )33
12 Booked36% Booked
36% Booked
2 BHK48.8 Sq.mts. ( 525 Sq.ft. )9
4 Booked44% Booked
44% Booked
88 total apartments / 48 apartments booked. 54% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingOct 20271410121528
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.79 Sq.mts. ( 396 Sq.ft. )19
6 Booked31% Booked
31% Booked
1 BHK37.25 Sq.mts. ( 401 Sq.ft. )9
2 Booked22% Booked
22% Booked
2 BHK43.41 Sq.mts. ( 467 Sq.ft. )17
10 Booked58% Booked
58% Booked
2 BHK47.99 Sq.mts. ( 517 Sq.ft. )8
2 BHK48.8 Sq.mts. ( 525 Sq.ft. )10
3 Booked30% Booked
30% Booked
2 BHK52.16 Sq.mts. ( 561 Sq.ft. )17
14 Booked82% Booked
82% Booked
80 total apartments / 36 apartments booked. 45% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingOct 20271410121637
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK43.41 Sq.mts. ( 467 Sq.ft. )27
15 Booked55% Booked
55% Booked
2 BHK47.99 Sq.mts. ( 517 Sq.ft. )44
28 Booked63% Booked
63% Booked
2 BHK52.16 Sq.mts. ( 561 Sq.ft. )26
6 Booked23% Booked
23% Booked
97 total apartments / 49 apartments booked. 50% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingOct 20271410121631
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.99 Sq.mts. ( 517 Sq.ft. )16
2 BHK52.16 Sq.mts. ( 561 Sq.ft. )62
78 total apartments / 11 apartments booked. 14% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress66% done
66% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Today Royal Infracon
for Project
Aikyam
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation