Project overview

Aditya Royal is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700009847. Aditya Royal is located at 1408B. This is a Ongoing being developed by Prashant Aditya Shukla.

Aditya Royal has 1 BHK & 2 BHK Apartments with carpet areas ranging from 270 to 370 Sq.ft. Carpet. The Project has total 171 of which 61 are currently available for sale.

Aditya Royal is being developed on a total land area of 49514 Sq.ft. out of which 4951 Sq.ft. i.e 10% is reserved for recreational purposes. Aditya Royal has 3 Wings / Towers A Wiing,B Wing,C Wing

ProjectDeveloperLocationPossession
Riddhi SiddhiShreeji & Innovative DevelopersPlot No 6 And 9, Survey No 105 - A, Hissa No 131-12-2018 00:00:00
Harishree Residency-1Harishree CreationsPlot No. 1 Survey No 129/2 P30-12-2021 00:00:00
Harishree Residency-2Harishree CreationsPlot No2 Survey No 129 Hissa No 2 P30-12-2021 00:00:00
Tulsi SharnamTulsi InfratechSurvey No. 128, Hissa No. 1 Part, Building A101-05-2022 00:00:00
Sarvoday Square Phase 2 Bldg No 2Shree Squarefeet Enterprises Llp128/3, 131/330-12-2025 00:00:00
Shrutika ComplexSandesh Shyamsunder Sable7/131-05-2018 00:00:00
Aditya RoyalPrashant Aditya Shukla1408B30-06-2018 00:00:00
Sarvoday Square Phase 1 Bldg. No. 3,4 And 7Shree Squarefeet Enterprises Llp128/3, 131/301-12-2021 00:00:00
Om Shrinivas ApartmentShriniwas DevelopersSurvey No 9 Hissa No 4A Plot No 531-03-2018 00:00:00
Orchid Square Phase 3M/S Squarefeet Eco Housing Llp128/630-12-2023 00:00:00
Om Shiv Vatika A WingsOm Shiv DevelopersSr No 137 Hiss No B28-11-2021 00:00:00
Shivam Complex Wing D And EUmiya EnterprisesS No 105A H No 22P30-09-2018 00:00:00
Metro Highland Phase IMetro DevelopersS No 128/1/B/130-06-2018 00:00:00
Empire Industrial Centrum Phase - IEmpire Industries LimitedPlot No 22 22R30-12-2024 00:00:00
Kohinoor CastlesKohinoor Castles140 4A/130-03-2021 00:00:00
Tulsi SignatureTulsi BuildconNear Cyndrella School31-12-2019 00:00:00
Tharwani Ariana Phase IiAnil Hardasmal TharwaniSurvey No 133/1 Part And Survey 133/1A30-04-2018 00:00:00
Eternal AvenueMagnum Life SpacesS No 90 Hissa No 2 And 331-03-2018 00:00:00
Tharwani Ariana Phase IiiAnil Hardasmal TharwaniSurvey No 133/1 Part And Survey 133/1A30-04-2023 00:00:00
Sairaj Avenue Wing BVirendra Atmaram SalunkheS No 97B, Hissa No 5/3, Plot No 4431-05-2024 00:00:00
Sai DarshanSai Krupa BuildersSurvey No 18 Hissa No 131-12-2025 00:00:00
Dreams EnclaveDreamland DevelopersS No97b/1/5, S No97b/3/431-12-2026 00:00:00
Venkateshwara HeightsShree Venkateshwara DevelopersSurvey No 58 Hissa No 1/1/Y Plot No 131-12-2025 00:00:00
Swaraswati HeightsShree Samarth EnterprisesSurvey No 79, Hissa No. 1,2 & 330-09-2028 00:00:00
Tharwanis Meghna Montana Phase - 3Tharwani Constructions Pvt LtdS.No 135/3A, 138/1D, 138/2, 134/231-12-2028 00:00:00
Mahalaxmi ParadiseShree Mahalaxmi Builders And Developers133, Hissa No. 1A131-07-2019 00:00:00
Rattan GalaxyRattan Properties And Projects Private LimitedSurvey No 97/B Hissa No 6 And 7 Plot No 1 Belavali Badlapur30-04-2018 00:00:00
Satyam OleanderSahyog Group127/3,127/431-12-2019 00:00:00
Shubh SrushtiVinayak Enterprises34 Hissa No 9 Plot No 13,14 S No 34 H No 1231-10-2018 00:00:00
Shiv VatikaShiv Enterprises141/231-12-2017 00:00:00
Tharwani Ariana Phase IvAnil Hardasmal TharwaniSurvey No 133/1 Part And Survey 133/1A30-06-2024 00:00:00
Tharwanis Meghna Montana Phase - 2Tharwani Constructions Pvt LtdS.No 135/3A, 138/2, 134/2, 134/1A, 134/1B30-12-2020 00:00:00
Shiv SarovarMahesh Bharat Divnale95 /1/ V01-05-2025 00:00:00
Empire Industrial Centrum Phase 5Empire Industries LtdPlot No 22(R)30-06-2027 00:00:00
Sairaj EmeraldSairaj EnterprisesPlot No 21 & 22 Survey No 97B/5/325-09-2023 00:00:00
Karrm Gardens - 1Karrm Infrastructure Private LimitedS.No. 139/2, 151/1/A31-05-2019 00:00:00
Vishwajeet ParadiseKohinoor Infra DevelopmentSurvey No. 144/3, 143/6B, 140/330-09-2018 00:00:00
Kasturi ExoticaAcorn RealitiesS No 136 Hissa No 131-12-2019 00:00:00
Project Details
  • Project:
    Aditya Royal
  • Location:
  • 1408B
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    Prashant Aditya Shukla
  • Phone:
  • Address:
  • Indigo Apartment
Project RERA Details
MAHA REARA No: P51700009847
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Space Designers
Funding Bank AXIS BANK
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2017
Last Retrived 26 Jul 2025
Aditya Royal QR Code
Aditya Royal
MahaRERA - P51700009847
Apartment Details & Configuration
TypeArea
1 BHK25.12 Sq.mts. ( 270 Sq.ft. )
1 BHK25.2 Sq.mts. ( 271 Sq.ft. )
1 BHK25.35 Sq.mts. ( 273 Sq.ft. )
1RK19.23 Sq.mts. ( 207 Sq.ft. )
2 BHK34.37 Sq.mts. ( 370 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aditya Royallast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Fully Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Fully Completed
Energy management100% completed
95% Complete
Fully Completed
Fire Protection And Fire Safety Requirements80% completed
80% Complete
In Process
Landscaping & Tree Planting80% completed
80% Complete
Approaching Completion
Open Parking100% completed
95% Complete
Fully Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Fully Completed
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting100% completed
95% Complete
Fully Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Fully Completed
Water Supply
Not Yet Started
Buildings / Wings in Aditya Royal
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aditya Royal by Prashant Aditya Shuklalast updated on 26 Jul 2025 as per information obtained from MARA RERA.

49514 Sq. ft.

Project Area

4951 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

171 apartments in total
Total
171
Booked
110
Available
61

Saleable Area Statistics (Sq. ft.)

45912 Total
Total
45912
Booked
29325
Available
16587
Total 171 apartments in project. 110 apartments booked. 64% apartments booked.
Total 45912 Sq.ft. saleable area. 29325 saleable area booked.
64% area booked.

A Wiing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WiingJan 190081010101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.12 Sq.mts. ( 270 Sq.ft. )14
7 Booked50% Booked
50% Booked
1 BHK25.2 Sq.mts. ( 271 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK25.35 Sq.mts. ( 273 Sq.ft. )28
17 Booked60% Booked
60% Booked
1RK19.23 Sq.mts. ( 207 Sq.ft. )7
4 Booked57% Booked
57% Booked
56 total apartments / 33 apartments booked. 58% apartments booked.
Work Description in Building A WiingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 19008101051
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.12 Sq.mts. ( 270 Sq.ft. )14
7 Booked50% Booked
50% Booked
1 BHK25.2 Sq.mts. ( 271 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK25.35 Sq.mts. ( 273 Sq.ft. )21
11 Booked52% Booked
52% Booked
1RK19.23 Sq.mts. ( 207 Sq.ft. )14
11 Booked78% Booked
78% Booked
56 total apartments / 34 apartments booked. 60% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingJan 190081010101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.12 Sq.mts. ( 270 Sq.ft. )15
13 Booked86% Booked
86% Booked
1 BHK25.2 Sq.mts. ( 271 Sq.ft. )8
5 Booked62% Booked
62% Booked
1 BHK25.35 Sq.mts. ( 273 Sq.ft. )28
21 Booked75% Booked
75% Booked
2 BHK34.37 Sq.mts. ( 370 Sq.ft. )8
4 Booked50% Booked
50% Booked
59 total apartments / 43 apartments booked. 72% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Prashant Aditya Shukla
for Project
Aditya Royal
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation