Project overview

Adicio is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007289. Adicio is located at Mumbai Suburban, 400052. This is a On-Going Project being developed by Shree Ahuja Project Private Limited.

Adicio has 1 BHK, 2 BHK Type 1, 2 Bhk type 2, 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 482 to 1035 Sq.ft. Carpet. The Project has total 33 of which 0 are currently available for sale.

Adicio is being developed on a total land area of 11839 Sq.ft. out of which 3429 Sq.ft. i.e 29% is reserved for recreational purposes. Adicio has 1 Wings / Towers Adicio

ProjectDeveloperLocationPossession
Rustomjee Paramount - Wing DKeystone Realtors LimitedCts Nos G/626 G/164-A Pt30-11-2020 00:00:00
Florence A P PropertiesE 195 A30-09-2018 00:00:00
Disha Co-Op Housing Society LtdPritesh SanghviPlot No 586 F.P. No 153831-12-2018 00:00:00
Project Details
  • Project:
    Adicio
  • Location:
  • Mumbai Suburban, 400052
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Mar 2018
Developer Details

  • Developer:
    Shree Ahuja Project Private Limited
  • Phone:
  • Address:
  • 01, Rajpipla, Opp Standard Chartered Bank, Santacruz West, Linking Road, 400054
Project RERA Details
MAHA REARA No: P51800007289
Project Type Residential
RERA Project Status On-Going Project
Funding Bank ICICi Bank Limited
Proposed Possession 31 Mar 2018
Revised Possession 23 Nov 2021
Extended Possession
Litigations Yes
Last Modified 03 Jan 2022
Last Retrived 28 Jul 2025
Adicio QR Code
Adicio
MahaRERA - P51800007289
Apartment Details & Configuration
TypeArea
1 BHK44.81 Sq.mts. ( 482 Sq.ft. )
2 BHK Type 161.47 Sq.mts. ( 662 Sq.ft. )
2 Bhk type 279.56 Sq.mts. ( 856 Sq.ft. )
2.5 BHK83.71 Sq.mts. ( 901 Sq.ft. )
3 BHK96.17 Sq.mts. ( 1035 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Adiciolast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
E Deck Area
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Reliance Energy Powersupply
Energy management
Solar Panels Lighting
Fire Protection And Fire Safety Requirements
Hydrant System Sprinkler System
Landscaping & Tree Planting
Around The Periphery
Open Parking
6 Nos
Sewerage (Chamber, Lines, Septic Tank , STP)
Chamber Lines Directly Connected To Bmc Sewerage
Solid Waste Management And Disposal
Organic Waste Composter
Storm Water Drains
Rcc
Street Lighting
Light Poles Provided
Treatment And Disposal Of Sewage And Sullage Water
Autocentral Thru Stp
Water Conservation, Rain water Harvesting
Rwh Tank
Water Supply
Bmc Water Supply Provided
Buildings / Wings in Adicio
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Adicio by Shree Ahuja Project Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

11839 Sq. ft.

Project Area

3429 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

33 apartments in total
Total
33
Booked
33
Available
0

Saleable Area Statistics (Sq. ft.)

26233 Total
Total
26233
Booked
26233
Available
0
Total 33 apartments in project. 33 apartments booked. 100% apartments booked.
Total 26233 Sq.ft. saleable area. 26233 saleable area booked.
100% area booked.

Adicio

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AdicioMay 2021510101336
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.81 Sq.mts. ( 482 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK Type 161.47 Sq.mts. ( 662 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 Bhk type 279.56 Sq.mts. ( 856 Sq.ft. )7
7 Booked100% Booked
100% Booked
2.5 BHK83.71 Sq.mts. ( 901 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK96.17 Sq.mts. ( 1035 Sq.ft. )7
7 Booked100% Booked
100% Booked
33 total apartments / 33 apartments booked. 100% apartments booked.
Work Description in Building AdicioCompletion
Excavation
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Ahuja Project Private Limited
for Project
Adicio
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation