Project overview

Adhiraj Samyama Tower 3B is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000004189. Adhiraj Samyama Tower 3B is located at 86 Part 88Part. This is a Ongoing being developed by Adhiraj Constructions Private Limited.

Adhiraj Samyama Tower 3B has 3 BHK Apartments with carpet areas ranging from 846 to 858 Sq.ft. Carpet. The Project has total 212 of which 1 are currently available for sale.

Adhiraj Samyama Tower 3B is being developed on a total land area of 10226 Sq.ft. Adhiraj Samyama Tower 3B has 1 Wings / Towers 3B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Adhiraj Samyama Tower 3B
  • Location:
  • 86 Part 88Part
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Adhiraj Constructions Private Limited
  • Phone:
  • Address:
  • Sharda Chambers
Project RERA Details
MAHA REARA No: P52000004189
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Nitin Honawar
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2022
Extended Possession 30 Dec 2023
Litigations No Litigations
Last Modified 23 Jun 2025
Last Retrived 28 Jul 2025
Adhiraj Samyama Tower 3B QR Code
Adhiraj Samyama Tower 3B
MahaRERA - P52000004189
Apartment Details & Configuration
TypeArea
3 BHK78.56 Sq.mts. ( 846 Sq.ft. )
3 BHK79 Sq.mts. ( 850 Sq.ft. )
3 BHK79.28 Sq.mts. ( 853 Sq.ft. )
3 BHK79.37 Sq.mts. ( 854 Sq.ft. )
3 BHK79.72 Sq.mts. ( 858 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Adhiraj Samyama Tower 3Blast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
2430Sqm As Part Of Whole Project Ready Before Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
Connection To Sub Stn Before Oc
Energy management50% completed
50% Complete
Provision Before Oc
Fire Protection And Fire Safety Requirements75% completed
75% Complete
Completion Before Oc
Landscaping & Tree Planting90% completed
90% Complete
Part Of Whole Project Part Ready Before Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)92% completed
92% Complete
Connection Before Oc
Solid Waste Management And Disposal90% completed
90% Complete
Provision Before Oc
Storm Water Drains100% completed
95% Complete
Connection Before Oc
Street Lighting64% completed
64% Complete
Part Of Whole Project Part Ready Before Oc
Terrace Lounge
10 Nos. Of Terrace Lounge Before Oc
Treatment And Disposal Of Sewage And Sullage Water90% completed
90% Complete
Provision Before Oc
Water Conservation, Rain water Harvesting93% completed
93% Complete
Provision Before Oc
Water Supply92% completed
92% Complete
Connection Before Oc
Buildings / Wings in Adhiraj Samyama Tower 3B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Adhiraj Samyama Tower 3B by Adhiraj Constructions Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10226 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

212 apartments in total
Total
212
Booked
211
Available
1

Saleable Area Statistics (Sq. ft.)

180728 Total
Total
180728
Booked
179878
Available
850
Total 212 apartments in project. 211 apartments booked. 99% apartments booked.
Total 180728 Sq.ft. saleable area. 179878 saleable area booked.
100% area booked.

3B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
3BDec 202157100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK78.56 Sq.mts. ( 846 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHK79 Sq.mts. ( 850 Sq.ft. )80
79 Booked98% Booked
98% Booked
3 BHK79.28 Sq.mts. ( 853 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHK79.37 Sq.mts. ( 854 Sq.ft. )60
60 Booked100% Booked
100% Booked
3 BHK79.72 Sq.mts. ( 858 Sq.ft. )32
32 Booked100% Booked
100% Booked
212 total apartments / 211 apartments booked. 99% apartments booked.
Work Description in Building 3BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress37% done
37% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress37% done
37% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress58% done
58% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Adhiraj Constructions Private Limited
for Project
Adhiraj Samyama Tower 3B
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation