Project overview

Adcon Meridian is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800010498. Adcon Meridian is located at Fp 27A, Cts 171, Tps Iii. This is a Ongoing being developed by Hi Sky Realty.

Adcon Meridian has 2 BHK & SHOP Apartments with carpet areas ranging from 400 to 689 Sq.ft. Carpet. The Project has total 16 of which 4 are currently available for sale.

Adcon Meridian is being developed on a total land area of 5167 Sq.ft. Adcon Meridian has 1 Wings / Towers Adcon Meridian

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Adcon Meridian
  • Location:
  • Fp 27A, Cts 171, Tps Iii
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Hi Sky Realty
  • Phone:
  • Address:
  • 22 Business Point
Project RERA Details
MAHA REARA No: P51800010498
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Fazal A W Sarang
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 01 Feb 2019
Last Retrived 26 Jul 2025
Adcon Meridian QR Code
Adcon Meridian
MahaRERA - P51800010498
Apartment Details & Configuration
TypeArea
2 BHK64 Sq.mts. ( 689 Sq.ft. )
SHOP37.2 Sq.mts. ( 400 Sq.ft. )
SHOP38.37 Sq.mts. ( 413 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Adcon Meridianlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply95% completed
95% Complete
Work In Progress
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Not Yet Started
Storm Water Drains100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Work In Progress
Open Parking
Na
Landscaping & Tree Planting100% completed
95% Complete
Completed
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Work In Progress
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work In Progress
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Adcon Meridian
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Adcon Meridian by Hi Sky Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5167 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

16 apartments in total
Total
16
Booked
12
Available
4

Saleable Area Statistics (Sq. ft.)

10458 Total
Total
10458
Booked
7702
Available
2756
Total 16 apartments in project. 12 apartments booked. 75% apartments booked.
Total 10458 Sq.ft. saleable area. 7702 saleable area booked.
74% area booked.

Adcon Meridian

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Adcon MeridianDec 20188100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64 Sq.mts. ( 689 Sq.ft. )14
10 Booked71% Booked
71% Booked
SHOP37.2 Sq.mts. ( 400 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP38.37 Sq.mts. ( 413 Sq.ft. )1
1 Booked100% Booked
100% Booked
16 total apartments / 12 apartments booked. 75% apartments booked.
Work Description in Building Adcon MeridianCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Hi Sky Realty
for Project
Adcon Meridian
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation