Project overview

Acropolis 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000007415. Acropolis 1 is located at 37-46 Part 51-67Part 98-121Part 124 145 147 368 And Others As Per Title Certificate Attached. This is a Ongoing being developed by Bhoomi & Arkade Associates.

Acropolis 1 has 1.5 BHK Apartments with carpet areas ranging from 442 to 473 Sq.ft. Carpet. The Project has total 772 of which 67 are currently available for sale.

Acropolis 1 is being developed on a total land area of 35510 Sq.ft. Acropolis 1 has 9 Wings / Towers G,H,I,J,K,L,M,N,O

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Acropolis 1
  • Location:
  • 37-46 Part 51-67Part 98-121Part 124 145 147 368 And Others As Per Title Certificate Attached
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Bhoomi & Arkade Associates
  • Phone:
  • Address:
  • Acropolis
Project RERA Details
MAHA REARA No: P99000007415
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Reza Kabul
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2017
Last Retrived 28 Jul 2025
Acropolis 1 QR Code
Acropolis 1
MahaRERA - P99000007415
Apartment Details & Configuration
TypeArea
2 BHK47.52 Sq.mts. ( 512 Sq.ft. )
1 BHK34.18 Sq.mts. ( 368 Sq.ft. )
2 BHK49.24 Sq.mts. ( 530 Sq.ft. )
2 BHK49.71 Sq.mts. ( 535 Sq.ft. )
SHOP14.1 Sq.mts. ( 152 Sq.ft. )
SHOP15.72 Sq.mts. ( 169 Sq.ft. )
SHOP17.79 Sq.mts. ( 191 Sq.ft. )
SHOP18.82 Sq.mts. ( 203 Sq.ft. )
SHOP22.85 Sq.mts. ( 246 Sq.ft. )
SHOP23.44 Sq.mts. ( 252 Sq.ft. )
SHOP25.29 Sq.mts. ( 272 Sq.ft. )
SHOP30.97 Sq.mts. ( 333 Sq.ft. )
1 BHK30.27 Sq.mts. ( 326 Sq.ft. )
1 BHK31.36 Sq.mts. ( 338 Sq.ft. )
1.5 BHK42.37 Sq.mts. ( 456 Sq.ft. )
SHOP12.75 Sq.mts. ( 137 Sq.ft. )
SHOP13.1 Sq.mts. ( 141 Sq.ft. )
SHOP13.15 Sq.mts. ( 142 Sq.ft. )
SHOP13.27 Sq.mts. ( 143 Sq.ft. )
SHOP13.99 Sq.mts. ( 151 Sq.ft. )
SHOP16.05 Sq.mts. ( 173 Sq.ft. )
SHOP16.27 Sq.mts. ( 175 Sq.ft. )
SHOP16.33 Sq.mts. ( 176 Sq.ft. )
SHOP20.04 Sq.mts. ( 216 Sq.ft. )
SHOP21.99 Sq.mts. ( 237 Sq.ft. )
1 BHK31.79 Sq.mts. ( 342 Sq.ft. )
1 BHK31.95 Sq.mts. ( 344 Sq.ft. )
1 BHK31.96 Sq.mts. ( 344 Sq.ft. )
2 BHK48.77 Sq.mts. ( 525 Sq.ft. )
SHOP7.42 Sq.mts. ( 80 Sq.ft. )
SHOP10.94 Sq.mts. ( 118 Sq.ft. )
SHOP13.89 Sq.mts. ( 150 Sq.ft. )
SHOP13.93 Sq.mts. ( 150 Sq.ft. )
SHOP16.45 Sq.mts. ( 177 Sq.ft. )
1 BHK32.16 Sq.mts. ( 346 Sq.ft. )
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )
1 BHK32.27 Sq.mts. ( 347 Sq.ft. )
1 BHK31.15 Sq.mts. ( 335 Sq.ft. )
2 BHK46.21 Sq.mts. ( 497 Sq.ft. )
2 BHK48.15 Sq.mts. ( 518 Sq.ft. )
2 BHK48.16 Sq.mts. ( 518 Sq.ft. )
1 BHK31.63 Sq.mts. ( 340 Sq.ft. )
1.5 BHK40.84 Sq.mts. ( 440 Sq.ft. )
1.5 BHK42.55 Sq.mts. ( 458 Sq.ft. )
2 BHK48.37 Sq.mts. ( 521 Sq.ft. )
2 BHK49.15 Sq.mts. ( 529 Sq.ft. )
1 BHK31.21 Sq.mts. ( 336 Sq.ft. )
1.5 BHK41.06 Sq.mts. ( 442 Sq.ft. )
1.5 BHK41.17 Sq.mts. ( 443 Sq.ft. )
1.5 BHK43.31 Sq.mts. ( 466 Sq.ft. )
1.5 BHK43.92 Sq.mts. ( 473 Sq.ft. )
1.5 BHK43.93 Sq.mts. ( 473 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Acropolis 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
For Entire Project Of Two Phases
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station86% completed
86% Complete
In Progress
Energy management100% completed
95% Complete
Power Backup For Lift &Amp; Staircase
Fire Protection And Fire Safety Requirements100% completed
95% Complete
In Progress
Landscaping & Tree Planting100% completed
95% Complete
For Entire Project Of Two Phases
Open Parking
Na
Podium with Clubhouse100% completed
95% Complete
Part Of Aggregate Area Of Recreational Open Space
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Na
Street Lighting100% completed
95% Complete
Facility Available In Larger Layout
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Facility Start Once Vvcmc Water Supply Commences
Buildings / Wings in Acropolis 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Acropolis 1 by Bhoomi & Arkade Associateslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

35510 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

772 apartments in total
Total
772
Booked
705
Available
67

Saleable Area Statistics (Sq. ft.)

310180 Total
Total
310180
Booked
278433
Available
31747
Total 772 apartments in project. 705 apartments booked. 91% apartments booked.
Total 310180 Sq.ft. saleable area. 278433 saleable area booked.
90% area booked.

G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
GDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.52 Sq.mts. ( 512 Sq.ft. )53
40 Booked75% Booked
75% Booked
53 total apartments / 40 apartments booked. 75% apartments booked.
Work Description in Building GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
HDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.18 Sq.mts. ( 368 Sq.ft. )56
56 Booked100% Booked
100% Booked
2 BHK49.24 Sq.mts. ( 530 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK49.71 Sq.mts. ( 535 Sq.ft. )12
10 Booked83% Booked
83% Booked
SHOP14.1 Sq.mts. ( 152 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP15.72 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.79 Sq.mts. ( 191 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.82 Sq.mts. ( 203 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP22.85 Sq.mts. ( 246 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP23.44 Sq.mts. ( 252 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP25.29 Sq.mts. ( 272 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP30.97 Sq.mts. ( 333 Sq.ft. )1
1 Booked100% Booked
100% Booked
91 total apartments / 89 apartments booked. 97% apartments booked.
Work Description in Building HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
IDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.27 Sq.mts. ( 326 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 BHK31.36 Sq.mts. ( 338 Sq.ft. )58
58 Booked100% Booked
100% Booked
1.5 BHK42.37 Sq.mts. ( 456 Sq.ft. )15
15 Booked100% Booked
100% Booked
SHOP12.75 Sq.mts. ( 137 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.1 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.15 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.27 Sq.mts. ( 143 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.99 Sq.mts. ( 151 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.05 Sq.mts. ( 173 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.27 Sq.mts. ( 175 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.33 Sq.mts. ( 176 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.04 Sq.mts. ( 216 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.99 Sq.mts. ( 237 Sq.ft. )1
1 Booked100% Booked
100% Booked
98 total apartments / 98 apartments booked. 100% apartments booked.
Work Description in Building ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
JDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.79 Sq.mts. ( 342 Sq.ft. )41
41 Booked100% Booked
100% Booked
1 BHK31.95 Sq.mts. ( 344 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 BHK31.96 Sq.mts. ( 344 Sq.ft. )15
14 Booked93% Booked
93% Booked
2 BHK48.77 Sq.mts. ( 525 Sq.ft. )15
14 Booked93% Booked
93% Booked
SHOP7.42 Sq.mts. ( 80 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.94 Sq.mts. ( 118 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.89 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.93 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.99 Sq.mts. ( 151 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.05 Sq.mts. ( 173 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.33 Sq.mts. ( 176 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.45 Sq.mts. ( 177 Sq.ft. )1
1 Booked100% Booked
100% Booked
94 total apartments / 92 apartments booked. 97% apartments booked.
Work Description in Building JCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

K

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
KDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.16 Sq.mts. ( 346 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )15
14 Booked93% Booked
93% Booked
1 BHK32.27 Sq.mts. ( 347 Sq.ft. )26
26 Booked100% Booked
100% Booked
56 total apartments / 55 apartments booked. 98% apartments booked.
Work Description in Building KCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

L

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
LDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.15 Sq.mts. ( 335 Sq.ft. )30
30 Booked100% Booked
100% Booked
2 BHK46.21 Sq.mts. ( 497 Sq.ft. )15
4 Booked26% Booked
26% Booked
2 BHK48.15 Sq.mts. ( 518 Sq.ft. )28
22 Booked78% Booked
78% Booked
2 BHK48.16 Sq.mts. ( 518 Sq.ft. )15
13 Booked86% Booked
86% Booked
88 total apartments / 69 apartments booked. 78% apartments booked.
Work Description in Building LCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

M

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
MDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.63 Sq.mts. ( 340 Sq.ft. )45
43 Booked95% Booked
95% Booked
1.5 BHK40.84 Sq.mts. ( 440 Sq.ft. )13
11 Booked84% Booked
84% Booked
1.5 BHK42.55 Sq.mts. ( 458 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK48.37 Sq.mts. ( 521 Sq.ft. )15
14 Booked93% Booked
93% Booked
2 BHK49.15 Sq.mts. ( 529 Sq.ft. )13
11 Booked84% Booked
84% Booked
101 total apartments / 94 apartments booked. 93% apartments booked.
Work Description in Building MCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

N

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NDec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.27 Sq.mts. ( 326 Sq.ft. )15
14 Booked93% Booked
93% Booked
1 BHK31.21 Sq.mts. ( 336 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK31.36 Sq.mts. ( 338 Sq.ft. )30
28 Booked93% Booked
93% Booked
1.5 BHK42.37 Sq.mts. ( 456 Sq.ft. )15
15 Booked100% Booked
100% Booked
88 total apartments / 85 apartments booked. 96% apartments booked.
Work Description in Building NCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

O

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ODec 202016101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK41.06 Sq.mts. ( 442 Sq.ft. )15
12 Booked80% Booked
80% Booked
1.5 BHK41.17 Sq.mts. ( 443 Sq.ft. )45
35 Booked77% Booked
77% Booked
1.5 BHK43.31 Sq.mts. ( 466 Sq.ft. )15
13 Booked86% Booked
86% Booked
1.5 BHK43.92 Sq.mts. ( 473 Sq.ft. )13
11 Booked84% Booked
84% Booked
1.5 BHK43.93 Sq.mts. ( 473 Sq.ft. )15
12 Booked80% Booked
80% Booked
103 total apartments / 83 apartments booked. 80% apartments booked.
Work Description in Building OCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Bhoomi & Arkade Associates
for Project
Acropolis 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation