Project overview

Aashrina is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800020167. Aashrina is located at Cts No. 4731, Plot No. 28, S.S. No. Xviii. This is a New being developed by M/S. Vira Realspace Llp.

Aashrina has 2 BHK Apartments with carpet areas ranging from 572 to 661 Sq.ft. Carpet. The Project has total 26 of which 3 are currently available for sale.

Aashrina is being developed on a total land area of 6003 Sq.ft. Aashrina has 1 Wings / Towers Aashrina

ProjectDeveloperLocationPossession
Centrona Zen-AElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Ghatkopar Mahavir PalacePramod Mathurbhai DhabariaFp No 250 Tps 331-12-2017 00:00:00
Trafalgar TowerM/S. Akshay Radha Kishan ConstructionIn T.P Scheme No.Iii In Cts No 5984, Plot Of Land Bearing No.5831-12-2019 00:00:00
Bhaveshwar Nagar Building No. 3Yog RealityCts No. 5953, Final Plot No. 2531-03-2019 00:00:00
Kesar ScionKesar Housing & Development Co5692 And 569330-12-2021 00:00:00
Centrona Zest- AElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Sai PrajaktaSunil Mangilal JainOld Sno 372 New Sno 79 Hno 231-12-2027 00:00:00
Sheth ExoticaM/S Sheth Properties Pvt Ltd4762B, 4758, 4759, 475731-10-2018 00:00:00
Prathmesh DarshanJaydeep Mahalaxmi Construction5705/830-12-2023 00:00:00
Vinayak Heights Phase 1 Vinayak Associate194A Part Ghatkoper And Cts 1B Part Of Village Vikroli Taluka Kurla Mumbai25-12-2020 00:00:00
Anchor ResidencyAnchor Sky Scrapers Llp3386 To 341431-12-2019 00:00:00
Rajshree OrchidLaxmiechand Devji DedhiaBuilding Number 42, Cts Number 5661 Part31-12-2019 00:00:00
O And S Business SuitesSuchita Orange Hdm ProjectFinal Plot No 11 Cts No 3214 Tps Ii30-12-2025 00:00:00
Jyoti PalaceWestbury Construction Private LimitedCts No. 5019 To 5034 F.P. No.16 Of Tps 131-12-2018 00:00:00
Parvati HeritageAmi & M.D. DevelopersNew Cts No 703A 703B01-03-2020 00:00:00
Subham BileshwarSubham Developers592331-12-2018 00:00:00
Ghatkopar Park View Chs LimitedEv And Saraf Realty473431-12-2019 00:00:00
Redevelopment Of Chandini ChsPunjalal G Dave Realtors LlpCts No - 5743/22, Plot No 353/2230-06-2021 00:00:00
Dhiren Co Operative Housing SocietyUtkarsh ConstructionPlot No 30 Cts No 194 A 13 Survey No 236A31-12-2017 00:00:00
Sofrance Wing BDaga Developers Private Limited194A Part Of Village Ghatkopar And 1 Part Of Village Vikhroli30-12-2022 00:00:00
Dharmapratap Chs LtdSai Life RealtorsCts No 195/92 Final Plot No 8030-03-2019 00:00:00
Siddh DarshanDeep Associates5105 - 5120 / 30-3131-12-2018 00:00:00
Sofrance Wing ADaga Developers Private LimitedKurla, 400075, Mumbai Suburban31-12-2016 00:00:00
Smita Nagar Chs LtdExcel EnterprisesR.B Mehta Marg18-11-2022 00:00:00
Sai DarshanSai Darshan587830-12-2021 00:00:00
The Baya JunctionM/S. Unique Property Enterprises Pvt. Ltd.Pestom Sagar Rd No 630-12-2023 00:00:00
The PalmsTanishq Builders1269A30-06-2021 00:00:00
Integrated ArcadeSadgurukrupa Developers181 And 18231-03-2019 00:00:00
Dynamic Ultima - BlissTriveni Life Style Developers LlpSurvey No. 121 H.No 1,230-12-2020 00:00:00
Kalika Heights Phase IiSanjay Shreenath PandeyF.P.No 36631-12-2019 00:00:00
Shree SuryodayaHariyana Developers19330-06-2024 00:00:00
Rishabraj ViciniaH Rishabraj Developers195/10 Of Village Ghatkoper29-02-2024 00:00:00
Neelkanth Regent Building 3 - Wing A And Wing BMukesh Patel & Others5686 Pt F P No 265 Of Tps Iii30-11-2018 00:00:00
Yashaswati Chs LtdLakshmi Builders And Developers189 Pt, 189/11 To 189/20 Cs No 23631-07-2023 00:00:00
9 CrystalKeyland Developers353/330-12-2025 00:00:00
SamarpanHs ConstructionC.T.S.No.184 (Pt.)30-06-2025 00:00:00
Bhoomi AntaraBhoomi LifestylePlot No. 63 Cts 195/11128-02-2027 00:00:00
Alag AnantaAlag Square Llp19730-09-2024 00:00:00
Kavya AshwameghKavya Construction Company400075, Mumbai, Mumbai Suburban31-12-2020 00:00:00
Radhakrishnan Redevelopment ProjectVibrant Properties400077, Mumbai Suburban31-12-2018 00:00:00
Shree Sati Ashish Co Op Housing SocietySun-VubPlot No 39 Cts No 195/3431-07-2018 00:00:00
Rajshree Eleven EastPanchsheel 1 Upgrade Llp5681 Pt31-12-2024 00:00:00
Antariksh AvalonAntariksh Realtors Private Limited5740 Part31-12-2025 00:00:00
Royal AltezzaShri Ganesh Developers5740 Pt/236A31-08-2025 00:00:00
Skye GrandeurV K Developers4756 B28-02-2022 00:00:00
Nav VaniGiriraj Builders And DevelopersPlot No 35328 Tps 3 Cts No 57432030-12-2020 00:00:00
Dream Arihant OasisDream Arihant Infrastructure CompanyF P No 83, Cts No 591330-12-2023 00:00:00
Choice Ambe DarshanChoice DeveloperCts No 5661 Survey No 236-A Building No 3931-12-2025 00:00:00
Avani SignatureAvani BuildconF.P No.17, C.T.S. No.3747 To 379731-03-2026 00:00:00
KakkadSilver Land Developers Private Limited464731-12-2026 00:00:00
West WindsGhatkopar Neelkanth Kunj Chsl195/164 195/16831-03-2026 00:00:00
Palazzo 90Blue Crest Developers Llp195/6530-06-2025 00:00:00
Shubham Avalon Co-Operative Housing Society LimitedAvvad Housing LlpFinal Plot No. - 311 (Pt), Plot Bearing Survey No. - 236-A, Cts No. - 5662 (Pt)31-12-2024 00:00:00
Kailas NagarDkp Designers & Creators Pvt. Ltd.Cts No 595530-03-2023 00:00:00
Shanti NiwasD.G. Patel & Co.12 / 596731-12-2018 00:00:00
Sapphire Business AnnexeSapphire Developers42 And 42 A30-11-2020 00:00:00
Rajshree StatusJetalaal Laxmiechand DedhiaBuilding Number 15 Cts No. 5681 Part30-12-2020 00:00:00
Viki HeightsDivij Developers 586730-11-2018 00:00:00
Om ShyamDhirajlal Narsidas KamdarCts. No. 195/147, Plot No. 17214-04-2021 00:00:00
Shree Pinal Project APinal Realty LlpCts No - 4614A, 4615 To 462421-11-2024 00:00:00
Sips JalaramSips Buildcon353B-32, 353B-3130-06-2025 00:00:00
Kevli Plaza – A Wing And Kevli Darshan – B WingM/S R K And Company Pvt Ltd5105 To 5111, F.P No 30 Tps-I Ghatkopar (E) In N Ward, 5120 (Pt) Of Village Ghatkopar Kirol31-12-2028 00:00:00
Value Platinum Redevelopment Project For Rajawadi Arunoday ChslValue Projects Private Limited400077, Mumbai Suburban20-01-2018 00:00:00
Devi ClassicD M RealityF.P. No. 110 Of T.P.S. Iii Of Ghatkopar, Cts No. 590330-06-2018 00:00:00
Sai GrandeurShree Sai RealtorsCts No 5952 Fp No 3030-03-2021 00:00:00
Poonam CelestePl7 Realty Pvt. Ltd.583530-11-2024 00:00:00
Ghatkopar Avenue Aaradhya One Earth H Phase ViiMan Realtors And Holding Private LimitedS No 236A Part And Cts 194A30-06-2025 00:00:00
Rajshree AashiyanaGanesh Chhaya Construction Llp8030-06-2025 00:00:00
AnthuriumVibha Propoerties Llp5681 Part30-05-2023 00:00:00
AnandAastha EnterprisesM. G. Road31-12-2018 00:00:00
Redevelopment Of The State Bank Of India Siddheshwar Co Op Housing Soc LtdOrra Realtors Private Limited5939 Plot No 10231-12-2017 00:00:00
Centrona Nova BElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
ShrirangVirendra Natwarlal Sheth194 A Pt29-06-2020 00:00:00
Suyog ChsAdityaraj Builders35128-02-2021 00:00:00
Terraform DwarkaMoney Magnum Nest Pvt Ltd5808Pt Corr Final Plot No274a Pt Of Tpsiii Of Ghatkopar Kirol Adj 60 Ft Wide Jawahar Rd At North30-12-2023 00:00:00
Natasha AvenueNatasha Enterprises568130-12-2023 00:00:00
Bindu / VidyaviharDhirajlal Narsidas KamdarFinal Plot No. 169 Tps Iii Ghatkopar Cts No 5831 Village Ghatkopar Kirol31-12-2018 00:00:00
Baldevsingh Thakur Sra Coop Hsg Soc LtdKrishna Narsingrao Pimple489 489 1 To 3515-08-2023 00:00:00
Jai Savitri Chs LtdA&Amp;A Aristocrat Realty Private Limited400077, Mumbai Suburban31-03-2019 00:00:00
EmbassyDrushti Realtors Private LimitedCts No 192/1 Pt30-12-2020 00:00:00
Sai Orchid And Sai Fortune Business CentreM/S Sai Shakti Realtors594830-06-2028 00:00:00
Vishal SagarJ R Properties LlpBldg No 12630-12-2022 00:00:00
AashrinaM/S. Vira Realspace LlpCts No. 4731, Plot No. 28, S.S. No. Xviii30-09-2022 00:00:00
Terraform DwarkaMoney Magnum Nest Pvt Ltd5808Pt Corr Final Plot No274a Pt Of Tpsiii Of Ghatkopar Kirol Adj 18.3 Mtr Wide Jawahar Rd At North30-12-2023 00:00:00
Integrated AhanaIntegrated Spaces Limited814 To 816 817/A And 817/B31-12-2018 00:00:00
Aaradhya NineMicl Realty Llp194-A/9/630-03-2021 00:00:00
Aaradhya ResidencyMan Aaradhya Infraconstruction Llp885A/130-04-2018 00:00:00
Mahavir SolitaireInfinity Construction Co.Final Plot No 353-5B31-05-2018 00:00:00
Mahavir AriaMilestone DevelopersFinal Plot No 353-2531-12-2017 00:00:00
Mahavir AquilaMilestone DevelopersFinal Plot No 163B-131-05-2019 00:00:00
VasundharaInfinity Construction Co.Final Plot No 1431-12-2018 00:00:00
Shree Balaji AvenueShree Balaji & Co469/1 Village Of Kirol Vidyavihar East Mumbai 40007730-06-2025 00:00:00
Milan Milap Co Op Housing Society LtdMilan Milap Co Op Housing Society Limited195/131, 195/13731-12-2026 00:00:00
PalatinaTanishq BuildersC.T.S. No.194A(Pt.)28-02-2026 00:00:00
Maithili Residency Phase-1Global Oricon Developers1004 Part31-12-2019 00:00:00
Skyline StatusSkyline Enterprises5551 To 556031-12-2018 00:00:00
Shaswat ResidencyShaswat Realty470215-04-2018 00:00:00
East PointVital Developers Pvt. Ltd.573631-01-2020 00:00:00
Centrona Zest- BElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Shri Krishin Co-Operative Housing Society LimitedMishal Construction Private LimitedPlot No.72 Cts No.195/6430-06-2019 00:00:00
Suvidha Chs LtdAmi & Monika Developers501 V31-03-2018 00:00:00
Shubham SarayuShubham RealtyCts No 195/16130-06-2019 00:00:00
MatruchhayaSujyoti Fininvest Pvt LtdCts Nos. 469, 469/8 And 469/930-03-2019 00:00:00
Nav IndralokNav Indralok Co-Operative Housing. Society Limited195/17731-12-2026 00:00:00
Dhoot Sapphire ResidencyDhoot Developers Pvt. Ltd.587231-12-2028 00:00:00
Sidhivinayak OrchidSidhivinayak Developers186 Part31-12-2026 00:00:00
HemkunjMahendra Ravjibhai Makwana132+133A30-06-2025 00:00:00
Senghani ParadiseMansukhlal Velji Senghani1830-06-2026 00:00:00
Pragati ElanzaPragati Param Realty Llp236A, 18631-12-2025 00:00:00
Terraform Dwarka - Wing CMoney Magnum Nest Pvt Ltd5808Pt Corr Final Plot No274a Pt Of Tps Iii Of Ghatkopar Kirol Adj 18.3 Mtr Wide Jawahar Rd At North30-12-2024 00:00:00
Shubham AuraAvvad Realtty Llp315 Pt, 5676 Pt F P No314 Pt, Cts No 5675 Pt30-12-2024 00:00:00
Jai Arihant Nakoda Infrastructure194A31-12-2026 00:00:00
Garodia Nagar Mahavir Dham Chs LtdGarodia Nagar Mahavir Dham Chs Ltd195/4731-12-2025 00:00:00
Project Details
  • Project:
    Aashrina
  • Location:
  • Cts No. 4731, Plot No. 28, S.S. No. Xviii
  • Const. Stage:
    New
  • Possession:
    30 Sep 2022
Developer Details

  • Developer:
    M/S. Vira Realspace Llp
  • Phone:
  • Address:
  • Haria House, First Floor
Project RERA Details
MAHA REARA No: P51800020167
Project Type Residential / Group Housing
RERA Project Status New
Architect Aakar Architects & Consultants
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Sep 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Aashrina QR Code
Aashrina
MahaRERA - P51800020167
Apartment Details & Configuration
TypeArea
2 BHK53.14 Sq.mts. ( 572 Sq.ft. )
2 BHK58.25 Sq.mts. ( 627 Sq.ft. )
2 BHK61.4 Sq.mts. ( 661 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aashrinalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
New Meters To Be Obtained
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Execution As Per Fire Fighting Design
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Execution As Per Drainage Layout
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Execution As Per Swd Layout
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting80% completed
80% Complete
Execution As Per Rwh Design System
Water Supply100% completed
95% Complete
New Connection To Be Obtained From Mcgm
Buildings / Wings in Aashrina
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aashrina by M/S. Vira Realspace Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6003 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

26 apartments in total
Total
26
Booked
23
Available
3

Saleable Area Statistics (Sq. ft.)

16688 Total
Total
16688
Booked
14828
Available
1860
Total 26 apartments in project. 23 apartments booked. 88% apartments booked.
Total 16688 Sq.ft. saleable area. 14828 saleable area booked.
89% area booked.

Aashrina

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AashrinaMar 2022151010025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.14 Sq.mts. ( 572 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK58.25 Sq.mts. ( 627 Sq.ft. )12
11 Booked91% Booked
91% Booked
2 BHK61.4 Sq.mts. ( 661 Sq.ft. )13
12 Booked92% Booked
92% Booked
26 total apartments / 23 apartments booked. 88% apartments booked.
Work Description in Building AashrinaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Vira Realspace Llp
for Project
Aashrina
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation