Project overview

Aashray Aanand Phase-Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700026268. Aashray Aanand Phase-Ii is located at S.No-140/2A,141/1B And 141/1/E/5/B/1. This is a New being developed by Dream Corpration.

Aashray Aanand Phase-Ii has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 205 to 394 Sq.ft. Carpet. The Project has total 130 of which 108 are currently available for sale.

Aashray Aanand Phase-Ii is being developed on a total land area of 38750 Sq.ft. out of which 3875 Sq.ft. i.e 10% is reserved for recreational purposes. Aashray Aanand Phase-Ii has 4 Wings / Towers A Wing,B Wing,C Wing,D Wing

ProjectDeveloperLocationPossession
Deep Laxmi HeightDeeplaxmi HeightsBhiwandi30-12-2024 00:00:00
Lodha Bellavista - Wing B1Macrotech Developers LimitedGat No.61/1/1,2,3,4 30-12-2025 00:00:00
Fennelia CommercialAcme Housing India Private LimitedGat No 61/1/1,2,330-12-2025 00:00:00
Nasheman-E-ZohraM M Builders &Amp; Developers421302, Thane, Bhiwandi01-03-2026 00:00:00
Sun City Phase ISunrise DevelopersThane15-03-2026 00:00:00
Shree Ganesha EnterprisesShree Ganesha EnterprisesThane, Kopar30-12-2022 00:00:00
Sai Vaibhav ParadiseShree Sai DevelopersOld Survey No. 165, New Survey No. 26 Hissa No.330-06-2022 00:00:00
Salasar Exotica - ISalasar AssociatesSurvey No 7630-06-2025 00:00:00
Pushkar Co Op Hsg Society PraposedAmeya DevelopersCts No 823 824 S No 93A Plot No 88 8912-02-2024 00:00:00
Centrum Business Square Phase 1Squarefeet ConstructionD 130-06-2027 00:00:00
Shruti ApartmentVikrant V Raikar Huf - -Plot No 9 Sector 23 Ghansoli30-11-2023 00:00:00
Jasmine ResidencyA.A.Corp.Survey No 5/9 5/10 6/6A 6/724-11-2025 00:00:00
Sai Aashiyana - IiSai Sakshi DevelopersSurvey No 81 5 A 81 5 B30-06-2026 00:00:00
Aashray Aanand Phase-IiDream CorprationS.No-140/2A,141/1B And 141/1/E/5/B/130-11-2022 00:00:00
Maatr WatersMaatr Enterprises24/1 12/430-09-2023 00:00:00
Bhagwat And Jay VyankateshChaturthi Vastu Developers804 A B30-06-2027 00:00:00
Khushi ApartmentPavan Hastimal JainPlot No 113 22-05-2023 00:00:00
Shree Mangalmurti Builders And DevelopersVasanti Kashinath ChaudhariS No 65/4/1 Part Plot No 1130-09-2022 00:00:00
Larkins 315 Fio-AM/S Pushpak Developers31531-12-2024 00:00:00
Siddhakala HeightsRushabh Developers40060430-06-2024 00:00:00
Samruddhi ResidencyShree Sai Ganesh Developers16630-06-2025 00:00:00
Satyam Seven SkiesJai Jalaram EnterprisesPlot No.7A, Sector 17, Kharghar30-06-2024 00:00:00
Sai Kripa ResidencyGokuldham Builders &Amp; DevelopersThane, 42100310-04-2024 00:00:00
Indra NeelSonam Spark Infra Private Limited444/2B30-06-2026 00:00:00
Project Details
  • Project:
    Aashray Aanand Phase-Ii
  • Location:
  • S.No-140/2A,141/1B And 141/1/E/5/B/1
  • Const. Stage:
    New
  • Possession:
    30 Nov 2022
Developer Details

  • Developer:
    Dream Corpration
  • Phone:
  • Address:
  • Aashray Aanand
Project RERA Details
MAHA REARA No: P51700026268
Project Type Residential / Group Housing
RERA Project Status New
Architect Space Designers
Funding Bank BANK OF BARODA
Proposed Possession 30 Nov 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Sep 2020
Last Retrived 26 Jul 2025
Aashray Aanand Phase-Ii QR Code
Aashray Aanand Phase-Ii
MahaRERA - P51700026268
Apartment Details & Configuration
TypeArea
1 BHK22.22 Sq.mts. ( 239 Sq.ft. )
1 BHK23.4 Sq.mts. ( 252 Sq.ft. )
1RK19.03 Sq.mts. ( 205 Sq.ft. )
2 BHK29.72 Sq.mts. ( 320 Sq.ft. )
1 BHK28.66 Sq.mts. ( 308 Sq.ft. )
1RK19.19 Sq.mts. ( 207 Sq.ft. )
1RK21.89 Sq.mts. ( 236 Sq.ft. )
2 BHK30.12 Sq.mts. ( 324 Sq.ft. )
2 BHK36.56 Sq.mts. ( 394 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aashray Aanand Phase-Iilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Work Is In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Work Not Yet Started.
Treatment And Disposal Of Sewage And Sullage Water
Work Not Yet Started.
Water Conservation, Rain water Harvesting50% completed
50% Complete
Work In Progress
Water Supply
Mjp Get Connection After O.C.
Buildings / Wings in Aashray Aanand Phase-Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aashray Aanand Phase-Ii by Dream Corprationlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

38750 Sq. ft.

Project Area

3875 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

130 apartments in total
Total
130
Booked
22
Available
108

Saleable Area Statistics (Sq. ft.)

32015 Total
Total
32015
Booked
5290
Available
26726
Total 130 apartments in project. 22 apartments booked. 16% apartments booked.
Total 32015 Sq.ft. saleable area. 5290 saleable area booked.
17% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMay 20225101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.22 Sq.mts. ( 239 Sq.ft. )24
8 Booked33% Booked
33% Booked
1 BHK23.4 Sq.mts. ( 252 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK19.03 Sq.mts. ( 205 Sq.ft. )4
4 Booked100% Booked
100% Booked
32 total apartments / 15 apartments booked. 46% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMay 20225101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.22 Sq.mts. ( 239 Sq.ft. )20
2 BHK29.72 Sq.mts. ( 320 Sq.ft. )8
2 Booked25% Booked
25% Booked
28 total apartments / 5 apartments booked. 17% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMay 20225101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.22 Sq.mts. ( 239 Sq.ft. )32
1 BHK28.66 Sq.mts. ( 308 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK19.19 Sq.mts. ( 207 Sq.ft. )4
None Booked0% Booked
0% Booked
38 total apartments / 1 apartments booked. 2% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMay 20225101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.22 Sq.mts. ( 239 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK28.66 Sq.mts. ( 308 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK19.03 Sq.mts. ( 205 Sq.ft. )8
1RK21.89 Sq.mts. ( 236 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK30.12 Sq.mts. ( 324 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK36.56 Sq.mts. ( 394 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dream Corpration
for Project
Aashray Aanand Phase-Ii
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation