Project overview

Aashray Aanand is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700008344. Aashray Aanand is located at 140/2A And 141/1B. This is a Ongoing being developed by Aashray Infra.

Aashray Aanand has RESIDENTIAL Apartments with carpet areas ranging from 244 to 323 Sq.ft. Carpet. The Project has total 205 of which 205 are currently available for sale.

Aashray Aanand is being developed on a total land area of 58879 Sq.ft. out of which 5888 Sq.ft. i.e 10% is reserved for recreational purposes. Aashray Aanand has 6 Wings / Towers A Wing,B Wing,C Wing,D Wing,E Wing,F Wing

ProjectDeveloperLocationPossession
Shree Sai LeelaShree Sai Builders & DevelopersPlot No.6, S.No. 86/330-06-2018 00:00:00
NiloyShree Sai Builders & DevelopersCts No 437831-12-2019 00:00:00
Shree Sai PanacheGyandev Builders & DevelopersCts No 142 Hissa No 530-12-2020 00:00:00
Project Details
  • Project:
    Aashray Aanand
  • Location:
  • 140/2A And 141/1B
  • Const. Stage:
    Ongoing
  • Possession:
    30 May 2023
Developer Details

  • Developer:
    Aashray Infra
  • Phone:
  • Address:
  • Sainiketan Chs
Project RERA Details
MAHA REARA No: P51700008344
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Space Designers
Funding Bank BANK OF BARODA
Proposed Possession 30 May 2023
Revised Possession 30 May 2023
Extended Possession
Litigations No Litigations
Last Modified 18 Aug 2017
Last Retrived 26 Jul 2025
Aashray Aanand QR Code
Aashray Aanand
MahaRERA - P51700008344
Apartment Details & Configuration
TypeArea
RESIDENTIAL19.86 Sq.mts. ( 214 Sq.ft. )
RESIDENTIAL20.33 Sq.mts. ( 219 Sq.ft. )
RESIDENTIAL21.37 Sq.mts. ( 230 Sq.ft. )
RESIDENTIAL22.24 Sq.mts. ( 239 Sq.ft. )
RESIDENTIAL24.62 Sq.mts. ( 265 Sq.ft. )
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )
RESIDENTIAL30.82 Sq.mts. ( 332 Sq.ft. )
RESIDENTIAL31.73 Sq.mts. ( 342 Sq.ft. )
RESIDENTIAL43.19 Sq.mts. ( 465 Sq.ft. )
RESIDENTIAL44.12 Sq.mts. ( 475 Sq.ft. )
RESIDENTIAL19.83 Sq.mts. ( 213 Sq.ft. )
RESIDENTIAL22.7 Sq.mts. ( 244 Sq.ft. )
RESIDENTIAL28.66 Sq.mts. ( 308 Sq.ft. )
RESIDENTIAL20.37 Sq.mts. ( 219 Sq.ft. )
RESIDENTIAL29.35 Sq.mts. ( 316 Sq.ft. )
RESIDENTIAL38.05 Sq.mts. ( 410 Sq.ft. )
RESIDENTIAL19.21 Sq.mts. ( 207 Sq.ft. )
RESIDENTIAL19.32 Sq.mts. ( 208 Sq.ft. )
RESIDENTIAL22.65 Sq.mts. ( 244 Sq.ft. )
RESIDENTIAL23.46 Sq.mts. ( 253 Sq.ft. )
RESIDENTIAL23.92 Sq.mts. ( 257 Sq.ft. )
RESIDENTIAL24.13 Sq.mts. ( 260 Sq.ft. )
RESIDENTIAL25.42 Sq.mts. ( 274 Sq.ft. )
RESIDENTIAL29.25 Sq.mts. ( 315 Sq.ft. )
RESIDENTIAL42.15 Sq.mts. ( 454 Sq.ft. )
RESIDENTIAL23.25 Sq.mts. ( 250 Sq.ft. )
RESIDENTIAL24.01 Sq.mts. ( 258 Sq.ft. )
RESIDENTIAL28.62 Sq.mts. ( 308 Sq.ft. )
RESIDENTIAL29.97 Sq.mts. ( 323 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aashray Aanandlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Work Yet Not Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Yet Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Only Tree Plantation Will Provide
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work Yet Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work Yet Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work Yet Not Started
Water Supply100% completed
95% Complete
After Oc
Buildings / Wings in Aashray Aanand
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aashray Aanand by Aashray Infralast updated on 26 Jul 2025 as per information obtained from MARA RERA.

58879 Sq. ft.

Project Area

5888 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

205 apartments in total
Total
205
Booked
0
Available
205

Saleable Area Statistics (Sq. ft.)

53640 Total
Total
53640
Booked
0
Available
53640
Total 205 apartments in project. 0 apartments booked. 0% apartments booked.
Total 53640 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL19.86 Sq.mts. ( 214 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL20.33 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL21.37 Sq.mts. ( 230 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL22.24 Sq.mts. ( 239 Sq.ft. )8
None Booked0% Booked
0% Booked
RESIDENTIAL24.62 Sq.mts. ( 265 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL30.82 Sq.mts. ( 332 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL31.73 Sq.mts. ( 342 Sq.ft. )8
None Booked0% Booked
0% Booked
RESIDENTIAL43.19 Sq.mts. ( 465 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL44.12 Sq.mts. ( 475 Sq.ft. )1
None Booked0% Booked
0% Booked
36 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL19.86 Sq.mts. ( 214 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL20.33 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL21.37 Sq.mts. ( 230 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL22.24 Sq.mts. ( 239 Sq.ft. )8
None Booked0% Booked
0% Booked
RESIDENTIAL24.62 Sq.mts. ( 265 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL30.82 Sq.mts. ( 332 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL31.73 Sq.mts. ( 342 Sq.ft. )8
None Booked0% Booked
0% Booked
RESIDENTIAL43.19 Sq.mts. ( 465 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL44.12 Sq.mts. ( 475 Sq.ft. )1
None Booked0% Booked
0% Booked
36 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL19.83 Sq.mts. ( 213 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL22.7 Sq.mts. ( 244 Sq.ft. )16
None Booked0% Booked
0% Booked
RESIDENTIAL28.66 Sq.mts. ( 308 Sq.ft. )1
None Booked0% Booked
0% Booked
21 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL19.83 Sq.mts. ( 213 Sq.ft. )12
None Booked0% Booked
0% Booked
RESIDENTIAL20.37 Sq.mts. ( 219 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL22.7 Sq.mts. ( 244 Sq.ft. )12
None Booked0% Booked
0% Booked
RESIDENTIAL28.66 Sq.mts. ( 308 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL29.35 Sq.mts. ( 316 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL38.05 Sq.mts. ( 410 Sq.ft. )1
None Booked0% Booked
0% Booked
33 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL19.21 Sq.mts. ( 207 Sq.ft. )8
None Booked0% Booked
0% Booked
RESIDENTIAL19.32 Sq.mts. ( 208 Sq.ft. )8
None Booked0% Booked
0% Booked
RESIDENTIAL22.65 Sq.mts. ( 244 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL22.7 Sq.mts. ( 244 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL23.46 Sq.mts. ( 253 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL23.92 Sq.mts. ( 257 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL24.13 Sq.mts. ( 260 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL25.42 Sq.mts. ( 274 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL28.66 Sq.mts. ( 308 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL29.25 Sq.mts. ( 315 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL42.15 Sq.mts. ( 454 Sq.ft. )1
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingJan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL22.7 Sq.mts. ( 244 Sq.ft. )24
None Booked0% Booked
0% Booked
RESIDENTIAL23.25 Sq.mts. ( 250 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL24.01 Sq.mts. ( 258 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL28.62 Sq.mts. ( 308 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL28.66 Sq.mts. ( 308 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL29.97 Sq.mts. ( 323 Sq.ft. )1
None Booked0% Booked
0% Booked
37 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Aashray Infra
for Project
Aashray Aanand
last updated on 26 Jul 2025 as per information obtained from MARA RERA.