Project overview

Aaradhya Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000362. Aaradhya Residency is located at 885A/1. This is a Ongoing being developed by Man Aaradhya Infraconstruction Llp.

Aaradhya Residency has 1 BHK\REHAB, 1 BHK\SALE, 2 BHK\SALE & MPR\SALE Apartments with carpet areas ranging from 263 to 634 Sq.ft. Carpet. The Project has total 116 of which 2 are currently available for sale.

Aaradhya Residency is being developed on a total land area of 25002 Sq.ft. out of which 3655 Sq.ft. i.e 15% is reserved for recreational purposes. Aaradhya Residency has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Sai PrajaktaSunil Mangilal JainOld Sno 372 New Sno 79 Hno 231-12-2027 00:00:00
Bhaveshwar Nagar Building No. 3Yog RealityCts No. 5953, Final Plot No. 2531-03-2019 00:00:00
Centrona Zest- AElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Anchor ResidencyAnchor Sky Scrapers Llp3386 To 341431-12-2019 00:00:00
Rajshree OrchidLaxmiechand Devji DedhiaBuilding Number 42, Cts Number 5661 Part31-12-2019 00:00:00
Lifescapes PrithviiGirnar Builders & Developers1271-B/131-01-2021 00:00:00
Centrona Zen-AElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Ghatkopar Mahavir PalacePramod Mathurbhai DhabariaFp No 250 Tps 331-12-2017 00:00:00
Trafalgar TowerM/S. Akshay Radha Kishan ConstructionIn T.P Scheme No.Iii In Cts No 5984, Plot Of Land Bearing No.5831-12-2019 00:00:00
Sheth ExoticaM/S Sheth Properties Pvt Ltd4762B, 4758, 4759, 475731-10-2018 00:00:00
Tivon Park Wing G And HD.S. Developers175-D30-06-2018 00:00:00
Heritage Ahura ResidencyKersi Jamshed Randeria177730-12-2022 00:00:00
O And S Business SuitesSuchita Orange Hdm ProjectFinal Plot No 11 Cts No 3214 Tps Ii30-12-2025 00:00:00
Jyoti PalaceWestbury Construction Private LimitedCts No. 5019 To 5034 F.P. No.16 Of Tps 131-12-2018 00:00:00
Parvati HeritageAmi & M.D. DevelopersNew Cts No 703A 703B01-03-2020 00:00:00
Kalika Heights Phase IiSanjay Shreenath PandeyF.P.No 36631-12-2019 00:00:00
Subham BileshwarSubham Developers592331-12-2018 00:00:00
Ghatkopar Park View Chs LimitedEv And Saraf Realty473431-12-2019 00:00:00
The PalmsTanishq Builders1269A30-06-2021 00:00:00
Maithili Residency Phase-2Global Oricon Developers1004 Part31-12-2019 00:00:00
Integrated ArcadeSadgurukrupa Developers181 And 18231-03-2019 00:00:00
Dharmapratap Chs LtdSai Life RealtorsCts No 195/92 Final Plot No 8030-03-2019 00:00:00
Siddh DarshanDeep Associates5105 - 5120 / 30-3131-12-2018 00:00:00
Radhakrishnan Redevelopment ProjectVibrant Properties400077, Mumbai Suburban31-12-2018 00:00:00
9 CrystalKeyland Developers353/330-12-2025 00:00:00
Rajshree StatusJetalaal Laxmiechand DedhiaBuilding Number 15 Cts No. 5681 Part30-12-2020 00:00:00
Odhav K K ResidencyK. K. Patel & Sons182 182 1 To 8030-09-2024 00:00:00
Shree Sati Ashish Co Op Housing SocietySun-VubPlot No 39 Cts No 195/3431-07-2018 00:00:00
Kailas NagarDkp Designers & Creators Pvt. Ltd.Cts No 595530-03-2023 00:00:00
Shanti NiwasD.G. Patel & Co.12 / 596731-12-2018 00:00:00
Kyraa ParkKyraa Infra Projects Private Limited192/3/C And 192/430-12-2023 00:00:00
One CrystalGoldnest Spaces LlpFp 149 150 151 Of Tps Iii31-12-2025 00:00:00
One ApolloGoldnest Spaces LlpFp No 149 150 151 Of Tps Iii31-12-2025 00:00:00
Viki HeightsDivij Developers 586730-11-2018 00:00:00
Om ShyamDhirajlal Narsidas KamdarCts. No. 195/147, Plot No. 17214-04-2021 00:00:00
Skyline Viha Wing BAnkit Overseas460 A Pt 460 3 To 731-12-2018 00:00:00
Value Platinum Redevelopment Project For Rajawadi Arunoday ChslValue Projects Private Limited400077, Mumbai Suburban20-01-2018 00:00:00
Devi ClassicD M RealityF.P. No. 110 Of T.P.S. Iii Of Ghatkopar, Cts No. 590330-06-2018 00:00:00
Sai GrandeurShree Sai RealtorsCts No 5952 Fp No 3030-03-2021 00:00:00
Terraform DwarkaMoney Magnum Nest Pvt Ltd5808Pt Corr Final Plot No274a Pt Of Tpsiii Of Ghatkopar Kirol Adj 60 Ft Wide Jawahar Rd At North30-12-2023 00:00:00
Bindu / VidyaviharDhirajlal Narsidas KamdarFinal Plot No. 169 Tps Iii Ghatkopar Cts No 5831 Village Ghatkopar Kirol31-12-2018 00:00:00
Integrated AryaIntegrated Spaces Limited183C/1 And 183C/231-03-2019 00:00:00
Centrona Nova BElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Suvidha Chs LtdAmi & Monika Developers501 V31-03-2018 00:00:00
Terraform DwarkaMoney Magnum Nest Pvt Ltd5808Pt Corr Final Plot No274a Pt Of Tpsiii Of Ghatkopar Kirol Adj 18.3 Mtr Wide Jawahar Rd At North30-12-2023 00:00:00
Integrated AhanaIntegrated Spaces Limited814 To 816 817/A And 817/B31-12-2018 00:00:00
Redevelopment Of Chandini ChsPunjalal G Dave Realtors LlpCts No - 5743/22, Plot No 353/2230-06-2021 00:00:00
Smita Nagar Chs LtdExcel EnterprisesR.B Mehta Marg18-11-2022 00:00:00
Sai DarshanSai Darshan587830-12-2021 00:00:00
Kahan Jash ResidencyMehta Associates1382 To 1404, 1404A31-12-2019 00:00:00
Centrona Zest- BElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Tivon Park Wing E And FD S DevelopersCts No 175-D31-12-2018 00:00:00
Sapphire Business AnnexeSapphire Developers42 And 42 A30-11-2020 00:00:00
Baldevsingh Thakur Sra Coop Hsg Soc LtdKrishna Narsingrao Pimple489 489 1 To 3515-08-2023 00:00:00
Maithili Residency Phase-1Global Oricon Developers1004 Part31-12-2019 00:00:00
MatruchhayaSujyoti Fininvest Pvt LtdCts Nos. 469, 469/8 And 469/930-03-2019 00:00:00
Centrona Nova-AL&T Avenue Realty Llp194 Part30-12-2026 00:00:00
Tanishq ResidencyPrathamesh Developers636 Pt30-12-2023 00:00:00
Skyline StatusSkyline Enterprises5551 To 556031-12-2018 00:00:00
Shaswat ResidencyShaswat Realty470215-04-2018 00:00:00
Jeerawali ResidencyGopuram DevelopersCts No 5229 To 524331-07-2018 00:00:00
Alag AnantaAlag Square Llp19730-09-2024 00:00:00
Avani SignatureAvani BuildconF.P No.17, C.T.S. No.3747 To 379731-03-2026 00:00:00
KakkadSilver Land Developers Private Limited464731-12-2026 00:00:00
Shree Pinal Project APinal Realty LlpCts No - 4614A, 4615 To 462421-11-2024 00:00:00
Kevli Plaza – A Wing And Kevli Darshan – B WingM/S R K And Company Pvt Ltd5105 To 5111, F.P No 30 Tps-I Ghatkopar (E) In N Ward, 5120 (Pt) Of Village Ghatkopar Kirol31-12-2028 00:00:00
Dhoot Sapphire ResidencyDhoot Developers Pvt. Ltd.587231-12-2028 00:00:00
AnandAastha EnterprisesM. G. Road31-12-2018 00:00:00
Redevelopment Of The State Bank Of India Siddheshwar Co Op Housing Soc LtdOrra Realtors Private Limited5939 Plot No 10231-12-2017 00:00:00
The Ghatkopar Nilkantha Chs LtdSchemaaticsFinal Plot No. 25A31-01-2021 00:00:00
Skyline MagnusSkyline VenturesCts No 5121 To 5129 And 5151/A31-12-2024 00:00:00
Shri Krishin Co-Operative Housing Society LimitedMishal Construction Private LimitedPlot No.72 Cts No.195/6430-06-2019 00:00:00
Parasmani - AParasmani Constructions Pvt .Ltd465, 46314-12-2018 00:00:00
Ishaan EnclaveIshaan Developers40008031-05-2020 00:00:00
Avis ResidencyAvi Housing Realtors22231-12-2019 00:00:00
New Sangeeta Chs/ Valdariya ConstructionsPinkesh Jain400077, Mumbai Suburban31-07-2019 00:00:00
Skye GrandeurV K Developers4756 B28-02-2022 00:00:00
Sai Orchid And Sai Fortune Business CentreM/S Sai Shakti Realtors594830-06-2028 00:00:00
AashrinaM/S. Vira Realspace LlpCts No. 4731, Plot No. 28, S.S. No. Xviii30-09-2022 00:00:00
Project Details
  • Project:
    Aaradhya Residency
  • Location:
  • 885A/1
  • Const. Stage:
    Ongoing
  • Possession:
    30 Apr 2018
Developer Details

  • Developer:
    Man Aaradhya Infraconstruction Llp
  • Phone:
  • Address:
  • Krushal Commercial Complex
Project RERA Details
MAHA REARA No: P51800000362
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Karani And Sanghoi Designers
Funding Bank BANK OF BARODA
Proposed Possession 30 Apr 2018
Revised Possession 30 Apr 2018
Extended Possession 30 Apr 2019
Litigations No Litigations
Last Modified 20 Apr 2018
Last Retrived 26 Jul 2025
Aaradhya Residency QR Code
Aaradhya Residency
MahaRERA - P51800000362
Apartment Details & Configuration
TypeArea
2 BHK\SALE65.1 Sq.mts. ( 701 Sq.ft. )
2 BHK\SALE65.5 Sq.mts. ( 705 Sq.ft. )
2 BHK\SALE66.4 Sq.mts. ( 715 Sq.ft. )
1 BHK\REHAB34.75 Sq.mts. ( 374 Sq.ft. )
1 BHK\SALE47.1 Sq.mts. ( 507 Sq.ft. )
2 BHK\SALE50.3 Sq.mts. ( 541 Sq.ft. )
2 BHK\SALE51 Sq.mts. ( 549 Sq.ft. )
2 BHK\SALE58.9 Sq.mts. ( 634 Sq.ft. )
MPR\SALE24.4 Sq.mts. ( 263 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
COMMON SERVANTS TOILET ONLY FOR A WING100% completed
95% Complete
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting
Na
Open Parking100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
No Septic Tank And No Stp
SOCIETY OFFICE ONLY FOR A WING100% completed
95% Complete
Na
Solid Waste Management And Disposal
Na
STACK PARKING FOR ONLY A WING100% completed
95% Complete
Na
Storm Water Drains100% completed
95% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Only Rain Water Harvesting
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Aaradhya Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya Residency by Man Aaradhya Infraconstruction Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

25002 Sq. ft.

Project Area

3655 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

116 apartments in total
Total
116
Booked
114
Available
2

Saleable Area Statistics (Sq. ft.)

57664 Total
Total
57664
Booked
56767
Available
897
Total 116 apartments in project. 114 apartments booked. 98% apartments booked.
Total 57664 Sq.ft. saleable area. 56767 saleable area booked.
98% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AApr 20191510102531
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK\SALE65.1 Sq.mts. ( 701 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK\SALE65.5 Sq.mts. ( 705 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK\SALE66.4 Sq.mts. ( 715 Sq.ft. )14
14 Booked100% Booked
100% Booked
41 total apartments / 41 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BApr 2019141010183
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK\REHAB34.75 Sq.mts. ( 374 Sq.ft. )70
70 Booked100% Booked
100% Booked
1 BHK\SALE47.1 Sq.mts. ( 507 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK\SALE50.3 Sq.mts. ( 541 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK\SALE51 Sq.mts. ( 549 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK\SALE58.9 Sq.mts. ( 634 Sq.ft. )1
None Booked0% Booked
0% Booked
MPR\SALE24.4 Sq.mts. ( 263 Sq.ft. )1
None Booked0% Booked
0% Booked
75 total apartments / 73 apartments booked. 97% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Man Aaradhya Infraconstruction Llp
for Project
Aaradhya Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation