Project overview

Aaradhya Onepark is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800054477. Aaradhya Onepark is located at 353/5, 353/7, 353/8, 353/9, 353/46, 353/17, 353/11, 353/12. This is a New being developed by Micl Creators Llp.

Aaradhya Onepark has 2.5 BHK REHAB, 2.5 BHK REHAB SALE, 3 BHK REHAB, 3 BHK REHAB SALE, 3 BHK SALE, 4 BHK REHAB, 4 BHK REHAB SALE, 4 BHK SALE & 5 BHK REHAB SALE Apartments with carpet areas ranging from 1106 to 1006 Sq.ft. Carpet. The Project has total 468 of which 146 are currently available for sale.

Aaradhya Onepark is being developed on a total land area of 141310 Sq.ft. out of which 28421 Sq.ft. i.e 20% is reserved for recreational purposes. Aaradhya Onepark has 11 Wings / Towers Building No 1, Tower No 1,Building No 2, Tower No 10,Building No 2, Tower No 11,Building No 2, Tower No 2,Building No 2, Tower No 3,Building No 2, Tower No 4,Building No 2, Tower No 5,Building No 2, Tower No 6,Building No 2, Tower No 7,Building No 2, Tower No 8,Building No 2, Tower No 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Aaradhya Onepark
  • Location:
  • 353/5, 353/7, 353/8, 353/9, 353/46, 353/17, 353/11, 353/12
  • Const. Stage:
    New
  • Possession:
    31 Jul 2028
Developer Details

  • Developer:
    Micl Creators Llp
  • Phone:
  • Address:
  • Krushal Commercial Complex
Project RERA Details
MAHA REARA No: P51800054477
Project Type Residential / Group Housing
RERA Project Status New
Architect Kalpesh L Shah
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Jul 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Jan 2024
Last Retrived 26 Jul 2025
Aaradhya Onepark QR Code
Aaradhya Onepark
MahaRERA - P51800054477
Apartment Details & Configuration
TypeArea
4 BHK SALE364.38 Sq.mts. ( 3922 Sq.ft. )
4 BHK SALE389.27 Sq.mts. ( 4190 Sq.ft. )
4 BHK SALE541.13 Sq.mts. ( 5825 Sq.ft. )
3 BHK RAHAB SALE125.39 Sq.mts. ( 1350 Sq.ft. )
3 BHK REHAB128.35 Sq.mts. ( 1382 Sq.ft. )
3 BHK REHAB SALE125.64 Sq.mts. ( 1352 Sq.ft. )
3 BHK REHAB SALE128.11 Sq.mts. ( 1379 Sq.ft. )
3 BHK SALE117.11 Sq.mts. ( 1261 Sq.ft. )
3 BHK SALE117.39 Sq.mts. ( 1264 Sq.ft. )
5 BHK REHAB SALE257.45 Sq.mts. ( 2771 Sq.ft. )
3 BHK RAHAB SALE98.01 Sq.mts. ( 1055 Sq.ft. )
3 BHK REHAB98.26 Sq.mts. ( 1058 Sq.ft. )
3 BHK REHAB102.5 Sq.mts. ( 1103 Sq.ft. )
3 BHK REHAB114.24 Sq.mts. ( 1230 Sq.ft. )
3 BHK REHAB121.96 Sq.mts. ( 1313 Sq.ft. )
3 BHK SALE98.14 Sq.mts. ( 1056 Sq.ft. )
3 BHK SALE93.19 Sq.mts. ( 1003 Sq.ft. )
3 BHK SALE93.44 Sq.mts. ( 1006 Sq.ft. )
3 BHK SALE93.9 Sq.mts. ( 1011 Sq.ft. )
3 BHK SALE104.16 Sq.mts. ( 1121 Sq.ft. )
3 BHK SALE110.88 Sq.mts. ( 1194 Sq.ft. )
4 BHK SALE159.6 Sq.mts. ( 1718 Sq.ft. )
1.5 BHK REHAB58.99 Sq.mts. ( 635 Sq.ft. )
2.5 BHK REHAB79.38 Sq.mts. ( 854 Sq.ft. )
2.5 BHK REHAB79.94 Sq.mts. ( 860 Sq.ft. )
2.5 BHK REHAB79.93 Sq.mts. ( 860 Sq.ft. )
3 BHK REHAB SALE120.17 Sq.mts. ( 1294 Sq.ft. )
3 BHK SALE111.19 Sq.mts. ( 1197 Sq.ft. )
3 BHK REHAB SALE125.01 Sq.mts. ( 1346 Sq.ft. )
3 BHK SALE115.7 Sq.mts. ( 1245 Sq.ft. )
4 BHK REHAB SALE184.61 Sq.mts. ( 1987 Sq.ft. )
4 BHK SALE209.55 Sq.mts. ( 2256 Sq.ft. )
4 BHK SALE217.09 Sq.mts. ( 2337 Sq.ft. )
4 BHK SALE167.97 Sq.mts. ( 1808 Sq.ft. )
2 BHK SALE85.83 Sq.mts. ( 924 Sq.ft. )
3 BHK REHAB111.66 Sq.mts. ( 1202 Sq.ft. )
3 BHK REHAB111.72 Sq.mts. ( 1203 Sq.ft. )
3 BHK REHAB113.89 Sq.mts. ( 1226 Sq.ft. )
3 BHK REHAB114.18 Sq.mts. ( 1229 Sq.ft. )
3 BHK REHAB125.42 Sq.mts. ( 1350 Sq.ft. )
3 BHK SALE108.61 Sq.mts. ( 1169 Sq.ft. )
3 BHK SALE110.17 Sq.mts. ( 1186 Sq.ft. )
3 BHK SALE116.87 Sq.mts. ( 1258 Sq.ft. )
4 BHK SALE145.41 Sq.mts. ( 1565 Sq.ft. )
4 BHK REHAB201.94 Sq.mts. ( 2174 Sq.ft. )
4 BHK REHAB150.4 Sq.mts. ( 1619 Sq.ft. )
4 BHK SALE244.04 Sq.mts. ( 2627 Sq.ft. )
4 BHK SALE181.3 Sq.mts. ( 1952 Sq.ft. )
4 BHK SALE140.61 Sq.mts. ( 1514 Sq.ft. )
5 BHK SALE259.48 Sq.mts. ( 2793 Sq.ft. )
3 BHK REHAB125.51 Sq.mts. ( 1351 Sq.ft. )
3 BHK REHAB127.11 Sq.mts. ( 1368 Sq.ft. )
3 BHK REHAB SALE125.13 Sq.mts. ( 1347 Sq.ft. )
3 BHK SALE121.59 Sq.mts. ( 1309 Sq.ft. )
4 BHK REHAB145.79 Sq.mts. ( 1569 Sq.ft. )
4 BHK SALE141.87 Sq.mts. ( 1527 Sq.ft. )
3 BHK REHAB97.74 Sq.mts. ( 1052 Sq.ft. )
3 BHK REHAB97.67 Sq.mts. ( 1051 Sq.ft. )
3 BHK REHAB111.98 Sq.mts. ( 1205 Sq.ft. )
3 BHK REHAB SALE111.52 Sq.mts. ( 1200 Sq.ft. )
3 BHK SALE105.89 Sq.mts. ( 1140 Sq.ft. )
3 BHK SALE113.61 Sq.mts. ( 1223 Sq.ft. )
2 BHK REHAB71.76 Sq.mts. ( 772 Sq.ft. )
2 BHK REHAB SALE60.79 Sq.mts. ( 654 Sq.ft. )
2.5 BHK REHAB79.88 Sq.mts. ( 860 Sq.ft. )
3 BHK REHAB93.47 Sq.mts. ( 1006 Sq.ft. )
3 BHK REHAB94.03 Sq.mts. ( 1012 Sq.ft. )
3 BHK REHAB110.77 Sq.mts. ( 1192 Sq.ft. )
3 BHK SALE94.6 Sq.mts. ( 1018 Sq.ft. )
3 BHK SALE96.91 Sq.mts. ( 1043 Sq.ft. )
3 BHK SALE106.67 Sq.mts. ( 1148 Sq.ft. )
3 BHK SALE119.13 Sq.mts. ( 1282 Sq.ft. )
2.5 BHK REHAB72.27 Sq.mts. ( 778 Sq.ft. )
2.5 BHK REHAB79.71 Sq.mts. ( 858 Sq.ft. )
3 BHK REHAB93.42 Sq.mts. ( 1006 Sq.ft. )
3 BHK REHAB113.18 Sq.mts. ( 1218 Sq.ft. )
3 BHK SALE102.73 Sq.mts. ( 1106 Sq.ft. )
4 BHK REHAB157.58 Sq.mts. ( 1696 Sq.ft. )
4 BHK REHAB SALE162.08 Sq.mts. ( 1745 Sq.ft. )
4 BHK REHAB SALE140.59 Sq.mts. ( 1513 Sq.ft. )
4 BHK SALE147.09 Sq.mts. ( 1583 Sq.ft. )
4 BHK SALE148.38 Sq.mts. ( 1597 Sq.ft. )
5 BHK REHAB SALE185.78 Sq.mts. ( 2000 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya Oneparklast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Yet To Start
Water Conservation, Rain water Harvesting
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Yet To Start
Street Lighting
Na
Storm Water Drains
Yet To Start
Solid Waste Management And Disposal
Yet To Start
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Start
Open Parking
Na
Landscaping & Tree Planting
Yet To Start
Fire Protection And Fire Safety Requirements
Yet To Start
Energy management
Yet To Start
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Community Buildings
Na
Aggregate area of recreational Open Space
Yet To Start
Buildings / Wings in Aaradhya Onepark
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya Onepark by Micl Creators Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

141310 Sq. ft.

Project Area

28421 Sq. ft.

Recreational Open Space

Total 11

Wings / Towers in Project

Apartments Statistics

468 apartments in total
Total
468
Booked
322
Available
146

Saleable Area Statistics (Sq. ft.)

631701 Total
Total
631701
Booked
433550
Available
198150
Total 468 apartments in project. 322 apartments booked. 68% apartments booked.
Total 631701 Sq.ft. saleable area. 433550 saleable area booked.
69% area booked.

Building No 1, Tower No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1, Tower No 1Jul 202816130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK SALE364.38 Sq.mts. ( 3922 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK SALE389.27 Sq.mts. ( 4190 Sq.ft. )12
12 Booked100% Booked
100% Booked
4 BHK SALE541.13 Sq.mts. ( 5825 Sq.ft. )1
1 Booked100% Booked
100% Booked
14 total apartments / 14 apartments booked. 100% apartments booked.
Work Description in Building Building No 1, Tower No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress24% done
24% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 10Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK RAHAB SALE125.39 Sq.mts. ( 1350 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK REHAB125.39 Sq.mts. ( 1350 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB128.35 Sq.mts. ( 1382 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE125.64 Sq.mts. ( 1352 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK REHAB SALE128.11 Sq.mts. ( 1379 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE117.11 Sq.mts. ( 1261 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK SALE117.39 Sq.mts. ( 1264 Sq.ft. )10
10 Booked100% Booked
100% Booked
5 BHK REHAB SALE257.45 Sq.mts. ( 2771 Sq.ft. )1
1 Booked100% Booked
100% Booked
33 total apartments / 33 apartments booked. 100% apartments booked.
Work Description in Building Building No 2, Tower No 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress42% done
42% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 11Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK RAHAB SALE98.01 Sq.mts. ( 1055 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK REHAB98.01 Sq.mts. ( 1055 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB98.26 Sq.mts. ( 1058 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB102.5 Sq.mts. ( 1103 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB114.24 Sq.mts. ( 1230 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB121.96 Sq.mts. ( 1313 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE121.96 Sq.mts. ( 1313 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE114.24 Sq.mts. ( 1230 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB SALE98.26 Sq.mts. ( 1058 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK SALE98.14 Sq.mts. ( 1056 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE93.19 Sq.mts. ( 1003 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE93.44 Sq.mts. ( 1006 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE93.9 Sq.mts. ( 1011 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE104.16 Sq.mts. ( 1121 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 BHK SALE110.88 Sq.mts. ( 1194 Sq.ft. )3
3 Booked100% Booked
100% Booked
4 BHK SALE159.6 Sq.mts. ( 1718 Sq.ft. )17
8 Booked47% Booked
47% Booked
51 total apartments / 41 apartments booked. 80% apartments booked.
Work Description in Building Building No 2, Tower No 11Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress21% done
21% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 2Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK REHAB58.99 Sq.mts. ( 635 Sq.ft. )3
3 Booked100% Booked
100% Booked
1.5 BHK REHAB SALE58.99 Sq.mts. ( 635 Sq.ft. )6
6 Booked100% Booked
100% Booked
2.5 BHK REHAB79.38 Sq.mts. ( 854 Sq.ft. )5
5 Booked100% Booked
100% Booked
2.5 BHK REHAB79.94 Sq.mts. ( 860 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK REHAB79.93 Sq.mts. ( 860 Sq.ft. )4
4 Booked100% Booked
100% Booked
2.5 BHK REHAB SALE79.93 Sq.mts. ( 860 Sq.ft. )4
4 Booked100% Booked
100% Booked
2.5 BHK REHAB SALE79.94 Sq.mts. ( 860 Sq.ft. )6
6 Booked100% Booked
100% Booked
2.5 BHK REHAB SALE79.38 Sq.mts. ( 854 Sq.ft. )3
3 Booked100% Booked
100% Booked
2.5 BHK SALE79.94 Sq.mts. ( 860 Sq.ft. )1
None Booked0% Booked
0% Booked
2.5 BHK SALE79.93 Sq.mts. ( 860 Sq.ft. )2
1 Booked50% Booked
50% Booked
3 BHK REHAB SALE120.17 Sq.mts. ( 1294 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK SALE111.19 Sq.mts. ( 1197 Sq.ft. )15
None Booked0% Booked
0% Booked
52 total apartments / 35 apartments booked. 67% apartments booked.
Work Description in Building Building No 2, Tower No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 3Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK REHAB SALE125.01 Sq.mts. ( 1346 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE115.7 Sq.mts. ( 1245 Sq.ft. )14
3 Booked21% Booked
21% Booked
4 BHK REHAB SALE184.61 Sq.mts. ( 1987 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK SALE209.55 Sq.mts. ( 2256 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK SALE217.09 Sq.mts. ( 2337 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK SALE167.97 Sq.mts. ( 1808 Sq.ft. )13
6 Booked46% Booked
46% Booked
32 total apartments / 12 apartments booked. 37% apartments booked.
Work Description in Building Building No 2, Tower No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 4Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK SALE85.83 Sq.mts. ( 924 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB111.66 Sq.mts. ( 1202 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB111.72 Sq.mts. ( 1203 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB113.89 Sq.mts. ( 1226 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK REHAB114.18 Sq.mts. ( 1229 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK REHAB125.42 Sq.mts. ( 1350 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB SALE125.42 Sq.mts. ( 1350 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK REHAB SALE114.18 Sq.mts. ( 1229 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE113.89 Sq.mts. ( 1226 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK SALE108.61 Sq.mts. ( 1169 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK SALE110.17 Sq.mts. ( 1186 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK SALE116.87 Sq.mts. ( 1258 Sq.ft. )4
None Booked0% Booked
0% Booked
4 BHK SALE145.41 Sq.mts. ( 1565 Sq.ft. )17
52 total apartments / 31 apartments booked. 59% apartments booked.
Work Description in Building Building No 2, Tower No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 5Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK REHAB201.94 Sq.mts. ( 2174 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK REHAB150.4 Sq.mts. ( 1619 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK REHAB SALE150.4 Sq.mts. ( 1619 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK REHAB SALE201.94 Sq.mts. ( 2174 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK SALE244.04 Sq.mts. ( 2627 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK SALE181.3 Sq.mts. ( 1952 Sq.ft. )12
9 Booked75% Booked
75% Booked
4 BHK SALE140.61 Sq.mts. ( 1514 Sq.ft. )12
9 Booked75% Booked
75% Booked
5 BHK SALE259.48 Sq.mts. ( 2793 Sq.ft. )1
1 Booked100% Booked
100% Booked
32 total apartments / 26 apartments booked. 81% apartments booked.
Work Description in Building Building No 2, Tower No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 6Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK REHAB125.51 Sq.mts. ( 1351 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB127.11 Sq.mts. ( 1368 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE125.51 Sq.mts. ( 1351 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK REHAB SALE125.13 Sq.mts. ( 1347 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK SALE117.11 Sq.mts. ( 1261 Sq.ft. )11
3 BHK SALE121.59 Sq.mts. ( 1309 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK REHAB145.79 Sq.mts. ( 1569 Sq.ft. )3
3 Booked100% Booked
100% Booked
4 BHK REHAB SALE145.79 Sq.mts. ( 1569 Sq.ft. )5
5 Booked100% Booked
100% Booked
4 BHK SALE141.87 Sq.mts. ( 1527 Sq.ft. )1
1 Booked100% Booked
100% Booked
34 total apartments / 23 apartments booked. 67% apartments booked.
Work Description in Building Building No 2, Tower No 6Completion
Basement (if any)
work-in-progress67% done
67% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 7Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK REHAB97.74 Sq.mts. ( 1052 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB97.67 Sq.mts. ( 1051 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK REHAB111.98 Sq.mts. ( 1205 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK REHAB SALE111.98 Sq.mts. ( 1205 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE111.52 Sq.mts. ( 1200 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB SALE97.67 Sq.mts. ( 1051 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK REHAB SALE97.74 Sq.mts. ( 1052 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK SALE105.89 Sq.mts. ( 1140 Sq.ft. )10
4 Booked40% Booked
40% Booked
3 BHK SALE97.67 Sq.mts. ( 1051 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE113.61 Sq.mts. ( 1223 Sq.ft. )11
None Booked0% Booked
0% Booked
49 total apartments / 32 apartments booked. 65% apartments booked.
Work Description in Building Building No 2, Tower No 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress20% done
20% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 8Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK REHAB71.76 Sq.mts. ( 772 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK REHAB SALE71.76 Sq.mts. ( 772 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK REHAB SALE60.79 Sq.mts. ( 654 Sq.ft. )5
5 Booked100% Booked
100% Booked
2.5 BHK REHAB79.88 Sq.mts. ( 860 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK REHAB SALE79.88 Sq.mts. ( 860 Sq.ft. )3
3 Booked100% Booked
100% Booked
2.5 BHK SALE79.88 Sq.mts. ( 860 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK REHAB93.47 Sq.mts. ( 1006 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB94.03 Sq.mts. ( 1012 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB110.77 Sq.mts. ( 1192 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE110.77 Sq.mts. ( 1192 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB SALE94.03 Sq.mts. ( 1012 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK REHAB SALE93.47 Sq.mts. ( 1006 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK SALE94.6 Sq.mts. ( 1018 Sq.ft. )9
2 Booked22% Booked
22% Booked
3 BHK SALE96.91 Sq.mts. ( 1043 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE106.67 Sq.mts. ( 1148 Sq.ft. )7
None Booked0% Booked
0% Booked
3 BHK SALE119.13 Sq.mts. ( 1282 Sq.ft. )17
None Booked0% Booked
0% Booked
69 total apartments / 37 apartments booked. 53% apartments booked.
Work Description in Building Building No 2, Tower No 8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress32% done
32% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2, Tower No 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, Tower No 9Jul 202818130100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK REHAB72.27 Sq.mts. ( 778 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK REHAB79.71 Sq.mts. ( 858 Sq.ft. )5
5 Booked100% Booked
100% Booked
2.5 BHK REHAB SALE79.71 Sq.mts. ( 858 Sq.ft. )8
8 Booked100% Booked
100% Booked
2.5 BHK REHAB SALE72.27 Sq.mts. ( 778 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK REHAB93.42 Sq.mts. ( 1006 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK REHAB113.18 Sq.mts. ( 1218 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB SALE93.42 Sq.mts. ( 1006 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK SALE93.42 Sq.mts. ( 1006 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SALE102.73 Sq.mts. ( 1106 Sq.ft. )4
1 Booked25% Booked
25% Booked
4 BHK REHAB157.58 Sq.mts. ( 1696 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK REHAB SALE162.08 Sq.mts. ( 1745 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK REHAB SALE140.59 Sq.mts. ( 1513 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK SALE147.09 Sq.mts. ( 1583 Sq.ft. )8
2 Booked25% Booked
25% Booked
4 BHK SALE148.38 Sq.mts. ( 1597 Sq.ft. )4
1 Booked25% Booked
25% Booked
5 BHK REHAB SALE185.78 Sq.mts. ( 2000 Sq.ft. )1
1 Booked100% Booked
100% Booked
50 total apartments / 38 apartments booked. 76% apartments booked.
Work Description in Building Building No 2, Tower No 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress42% done
42% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress33% done
33% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Micl Creators Llp
for Project
Aaradhya Onepark
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation