Project overview

Aaradhya One is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000333. Aaradhya One is located at 561A. This is a Ongoing being developed by Am Developers.

Aaradhya One has 1 BHK\REHAB, 1RK\REHAB, IT OFFICE, IT OFFICE\REHAB, MPR\REHAB, MPR\SALE & SHOP\REHAB Apartments with carpet areas ranging from 153 to 102 Sq.ft. Carpet. The Project has total 125 of which 22 are currently available for sale.

Aaradhya One is being developed on a total land area of 28006 Sq.ft. out of which 4201 Sq.ft. i.e 15% is reserved for recreational purposes. Aaradhya One has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Aaradhya One
  • Location:
  • 561A
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Am Developers
  • Phone:
  • Address:
  • Krushal Commercial Complex
Project RERA Details
MAHA REARA No: P51800000333
Project Type Others
RERA Project Status Ongoing
Architect Daisaria Associates
Funding Bank BANK OF BARODA
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 15 Jul 2017
Last Retrived 26 Jul 2025
Aaradhya One QR Code
Aaradhya One
MahaRERA - P51800000333
Apartment Details & Configuration
TypeArea
2 BHK\SALE62 Sq.mts. ( 667 Sq.ft. )
2 BHK\SALE64 Sq.mts. ( 689 Sq.ft. )
2 BHK\SALE67.8 Sq.mts. ( 730 Sq.ft. )
2 BHK\SALE69.6 Sq.mts. ( 749 Sq.ft. )
2 BHK\SALE\BALCONY64.4 Sq.mts. ( 693 Sq.ft. )
3 BHK\SALE75.3 Sq.mts. ( 811 Sq.ft. )
3 BHK\SALE81.6 Sq.mts. ( 878 Sq.ft. )
3 BHK\SALE\BALCONY82.2 Sq.mts. ( 885 Sq.ft. )
SHOP\REHAB31.9 Sq.mts. ( 343 Sq.ft. )
SHOP\REHAB36.6 Sq.mts. ( 394 Sq.ft. )
SHOP\REHAB13.2 Sq.mts. ( 142 Sq.ft. )
SHOP\REHAB17.1 Sq.mts. ( 184 Sq.ft. )
SHOP\REHAB17.5 Sq.mts. ( 188 Sq.ft. )
SHOP\REHAB17.6 Sq.mts. ( 189 Sq.ft. )
SHOP\REHAB17.8 Sq.mts. ( 192 Sq.ft. )
SHOP\SALE25.7 Sq.mts. ( 277 Sq.ft. )
SHOP\SALE27.6 Sq.mts. ( 297 Sq.ft. )
3 BHK\SALE99.9 Sq.mts. ( 1075 Sq.ft. )
3 BHK\SALE\BALCONY102.5 Sq.mts. ( 1103 Sq.ft. )
SHOP\SALE26.1 Sq.mts. ( 281 Sq.ft. )
SHOP\SALE27.9 Sq.mts. ( 300 Sq.ft. )
SHOP\SALE29.6 Sq.mts. ( 319 Sq.ft. )
1 BHK\REHAB42.6 Sq.mts. ( 459 Sq.ft. )
1RK\REHAB29 Sq.mts. ( 312 Sq.ft. )
1RK\REHAB29.1 Sq.mts. ( 313 Sq.ft. )
IT OFFICE18.7 Sq.mts. ( 201 Sq.ft. )
IT OFFICE\REHAB9.5 Sq.mts. ( 102 Sq.ft. )
MPR\REHAB16.7 Sq.mts. ( 180 Sq.ft. )
MPR\REHAB23.2 Sq.mts. ( 250 Sq.ft. )
MPR\REHAB16.9 Sq.mts. ( 182 Sq.ft. )
MPR\REHAB17 Sq.mts. ( 183 Sq.ft. )
MPR\SALE16.72 Sq.mts. ( 180 Sq.ft. )
SHOP\REHAB14.2 Sq.mts. ( 153 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya Onelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Wip
CAR LIFTS
For Wing A And B Only
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station70% completed
70% Complete
No Substation &Amp; No Receiving Station- Wip
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Wip
GYMNASIUM WITH EQUIPMENT
For Wings A And B Only
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
PODIUM CAR PARKING80% completed
80% Complete
For Wings A And B Only
POWER BACK UP GENERATOR FOR CAR PASSENGER LIFT COMMON AREAS
For Wings A And B Only
POWER BACK UP GENERATOR FOR PASSENGER LIFT AND COMMON AREAS
For Wing C Only
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
No Septic Tank No Stp - Wip
SOCIETY OFFICE70% completed
70% Complete
For Wings A And B Only
Solid Waste Management And Disposal
Na
Storm Water Drains40% completed
40% Complete
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting - Yet To Start
Water Supply50% completed
50% Complete
Wip
Buildings / Wings in Aaradhya One
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya One by Am Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

28006 Sq. ft.

Project Area

4201 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

125 apartments in total
Total
125
Booked
103
Available
22

Saleable Area Statistics (Sq. ft.)

69542 Total
Total
69542
Booked
52100
Available
17442
Total 125 apartments in project. 103 apartments booked. 82% apartments booked.
Total 69542 Sq.ft. saleable area. 52100 saleable area booked.
75% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 2018131012053
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK\SALE62 Sq.mts. ( 667 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK\SALE64 Sq.mts. ( 689 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK\SALE67.8 Sq.mts. ( 730 Sq.ft. )9
8 Booked88% Booked
88% Booked
2 BHK\SALE69.6 Sq.mts. ( 749 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK\SALE\BALCONY64.4 Sq.mts. ( 693 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK\SALE75.3 Sq.mts. ( 811 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK\SALE81.6 Sq.mts. ( 878 Sq.ft. )10
9 Booked90% Booked
90% Booked
3 BHK\SALE\BALCONY82.2 Sq.mts. ( 885 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP\REHAB31.9 Sq.mts. ( 343 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB36.6 Sq.mts. ( 394 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB13.2 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB17.1 Sq.mts. ( 184 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB17.5 Sq.mts. ( 188 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB17.6 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB17.8 Sq.mts. ( 192 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\SALE25.7 Sq.mts. ( 277 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\SALE27.6 Sq.mts. ( 297 Sq.ft. )1
1 Booked100% Booked
100% Booked
43 total apartments / 35 apartments booked. 81% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress80% done
80% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2018131012079
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK\SALE67.8 Sq.mts. ( 730 Sq.ft. )9
6 Booked66% Booked
66% Booked
2 BHK\SALE69.6 Sq.mts. ( 749 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK\SALE62 Sq.mts. ( 667 Sq.ft. )10
6 Booked60% Booked
60% Booked
2 BHK\SALE64 Sq.mts. ( 689 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK\SALE\BALCONY64.4 Sq.mts. ( 693 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK\SALE99.9 Sq.mts. ( 1075 Sq.ft. )10
8 Booked80% Booked
80% Booked
3 BHK\SALE\BALCONY102.5 Sq.mts. ( 1103 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP\SALE25.7 Sq.mts. ( 277 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP\SALE26.1 Sq.mts. ( 281 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\SALE27.9 Sq.mts. ( 300 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\SALE29.6 Sq.mts. ( 319 Sq.ft. )1
1 Booked100% Booked
100% Booked
39 total apartments / 25 apartments booked. 64% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress80% done
80% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 2018111010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK\REHAB42.6 Sq.mts. ( 459 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK\REHAB29 Sq.mts. ( 312 Sq.ft. )8
8 Booked100% Booked
100% Booked
1RK\REHAB29.1 Sq.mts. ( 313 Sq.ft. )18
18 Booked100% Booked
100% Booked
IT OFFICE18.7 Sq.mts. ( 201 Sq.ft. )1
1 Booked100% Booked
100% Booked
IT OFFICE\REHAB9.5 Sq.mts. ( 102 Sq.ft. )1
1 Booked100% Booked
100% Booked
MPR\REHAB16.7 Sq.mts. ( 180 Sq.ft. )5
5 Booked100% Booked
100% Booked
MPR\REHAB23.2 Sq.mts. ( 250 Sq.ft. )1
1 Booked100% Booked
100% Booked
MPR\REHAB16.9 Sq.mts. ( 182 Sq.ft. )1
1 Booked100% Booked
100% Booked
MPR\REHAB17 Sq.mts. ( 183 Sq.ft. )1
1 Booked100% Booked
100% Booked
MPR\SALE16.72 Sq.mts. ( 180 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP\REHAB14.2 Sq.mts. ( 153 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB17 Sq.mts. ( 183 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB17.8 Sq.mts. ( 192 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP\REHAB16.9 Sq.mts. ( 182 Sq.ft. )1
1 Booked100% Booked
100% Booked
43 total apartments / 43 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Am Developers
for Project
Aaradhya One
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation