Project overview

Aaradhya Highpark Project Iii Of Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700030611. Aaradhya Highpark Project Iii Of Phase 1 is located at S.No. 92 Corresponding New S.No. 13-1. This is a New being developed by Man Vastucon Llp.

Aaradhya Highpark Project Iii Of Phase 1 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 405 to 605 Sq.ft. Carpet. The Project has total 468 of which 2 are currently available for sale.

Aaradhya Highpark Project Iii Of Phase 1 is being developed on a total land area of 15285 Sq.ft. Aaradhya Highpark Project Iii Of Phase 1 has 2 Wings / Towers Elm,Fir

ProjectDeveloperLocationPossession
Aaradhya Highpark - Project 1 Of Phase IMan Vastucon LlpS. No. 92 - Corresponding New S. No. 13-130-03-2025 00:00:00
Aaradhya Highpark - Project 2 Of Phase IMan Vastucon LlpS. No 92 Corresponding New S. No. 13/130-03-2025 00:00:00
127 Raj Homes A WingRaj HomesSurvey No./ Hissa No. 49(127)/10,11,1230-09-2025 00:00:00
S3 SkyriseS3 Smart Spaces Private LimitedS No 102/26 And 88/13 Of Village Mire And S No 11/1 And 11/2 Of Village Mahajanwadi Taluka And District Thane31-12-2027 00:00:00
Aaradhya Highpark Project Iii Of Phase 1Man Vastucon LlpS.No. 92 Corresponding New S.No. 13-131-12-2025 00:00:00
Sector 2A - Wing CEversmile Properties Private LimitedOld S No.233 (New S No. 66 Pt) Of Village Penkarpada30-06-2027 00:00:00
127 Raj Homes B And C WingRaj HomesSurvey No./Hissa No.49(127)/10,11,1231-12-2026 00:00:00
127 Raj Homes D WingRaj Homes49(127)1,2,3,5,6,8,10,11,1231-12-2026 00:00:00
Aaradhya Parkwood 1Man Vastucon LlpOld Survey No 260 Part/New Survey No 12 Hissa No 231-12-2028 00:00:00
S3 SkygreensS3 Smart Spaces Private LimitedS No 102/26 And 88/13 Of Village Mire And S No 11/1 Of Village Mahajanwadi Taluka And District Thane30-06-2028 00:00:00
Crescent Wtc (Western Trade Center)Crescent Shelters4152, 4153, 4316, 4351, 4352, 4354, 4355,4356,4357, 4358, 4359, 4360, 4404, 440530-06-2027 00:00:00
Crescent Wtc - Western Trade Center - Phase - Ii, Building A 1 - 2Crescent Shelters4152, 4153, 4316, 4351, 4352, 4354, 4355, 4356, 4357, 4358, 4359, 4360, 4404, 440530-06-2028 00:00:00
Aaradhya Parkwood 2Man Vastucon LlpOld Survey No 260 Part/New Survey No 12 Hissa No 231-12-2028 00:00:00
Project Details
  • Project:
    Aaradhya Highpark Project Iii Of Phase 1
  • Location:
  • S.No. 92 Corresponding New S.No. 13-1
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Man Vastucon Llp
  • Phone:
  • Address:
  • Krushal Commercial Complex
Project RERA Details
MAHA REARA No: P51700030611
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank INDUSIND BANK
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Jun 2023
Last Retrived 26 Jul 2025
Aaradhya Highpark Project Iii Of Phase 1 QR Code
Aaradhya Highpark Project Iii Of Phase 1
MahaRERA - P51700030611
Apartment Details & Configuration
TypeArea
1 BHK37.62 Sq.mts. ( 405 Sq.ft. )
1 BHK39.5 Sq.mts. ( 425 Sq.ft. )
2 BHK56.2 Sq.mts. ( 605 Sq.ft. )
1 BHK38.92 Sq.mts. ( 419 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya Highpark Project Iii Of Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed (No Receiving Station)
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Aaradhya Highpark Project Iii Of Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya Highpark Project Iii Of Phase 1 by Man Vastucon Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

15285 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

468 apartments in total
Total
468
Booked
466
Available
2

Saleable Area Statistics (Sq. ft.)

221444 Total
Total
221444
Booked
220634
Available
810
Total 468 apartments in project. 466 apartments booked. 99% apartments booked.
Total 221444 Sq.ft. saleable area. 220634 saleable area booked.
100% area booked.

Elm

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ElmDec 20253111120115
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.62 Sq.mts. ( 405 Sq.ft. )90
89 Booked98% Booked
98% Booked
1 BHK39.5 Sq.mts. ( 425 Sq.ft. )54
54 Booked100% Booked
100% Booked
2 BHK56.2 Sq.mts. ( 605 Sq.ft. )90
90 Booked100% Booked
100% Booked
234 total apartments / 233 apartments booked. 99% apartments booked.
Work Description in Building ElmCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Fir

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
FirDec 20253111120116
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.62 Sq.mts. ( 405 Sq.ft. )114
113 Booked99% Booked
99% Booked
1 BHK38.92 Sq.mts. ( 419 Sq.ft. )60
60 Booked100% Booked
100% Booked
2 BHK56.2 Sq.mts. ( 605 Sq.ft. )60
60 Booked100% Booked
100% Booked
234 total apartments / 233 apartments booked. 99% apartments booked.
Work Description in Building FirCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Man Vastucon Llp
for Project
Aaradhya Highpark Project Iii Of Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation