Project overview

A1 Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000025027. A1 Complex is located at S No 1,Hissa No 13. This is a New being developed by Abdulsamad Mohammed Sitpura.

A1 Complex has UNIT Apartments with carpet areas ranging from 1225 to 1015 Sq.ft. Carpet. The Project has total 14 of which 12 are currently available for sale.

A1 Complex is being developed on a total land area of 128275 Sq.ft. out of which 17298 Sq.ft. i.e 13% is reserved for recreational purposes. A1 Complex has 1 Wings / Towers A1 Complex Building No 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    A1 Complex
  • Location:
  • S No 1,Hissa No 13
  • Const. Stage:
    New
  • Possession:
    30 Mar 2024
Developer Details

  • Developer:
    Abdulsamad Mohammed Sitpura
  • Phone:
  • Address:
  • A K Tower Chs Ltd
Project RERA Details
MAHA REARA No: P99000025027
Project Type Commercial
RERA Project Status New
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Mar 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Mar 2020
Last Retrived 28 Jul 2025
A1 Complex QR Code
A1 Complex
MahaRERA - P99000025027
Apartment Details & Configuration
TypeArea
UNIT37.63 Sq.mts. ( 405 Sq.ft. )
UNIT93.83 Sq.mts. ( 1010 Sq.ft. )
UNIT94.3 Sq.mts. ( 1015 Sq.ft. )
UNIT113.81 Sq.mts. ( 1225 Sq.ft. )
UNIT120.3 Sq.mts. ( 1295 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of A1 Complexlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Msedcl
Energy management
Na
Fire Protection And Fire Safety Requirements
Fire Work As Per Vvcmc
Landscaping & Tree Planting
To Be Provided
Open Parking
As Per Approved Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
To Be Provided
Solid Waste Management And Disposal
As Per Vvcmc
Storm Water Drains
To Be Provided
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
To Be Provided
Water Supply
As Per Vvcmc
Buildings / Wings in A1 Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of A1 Complex by Abdulsamad Mohammed Sitpuralast updated on 28 Jul 2025 as per information obtained from MARA RERA.

128275 Sq. ft.

Project Area

17298 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

14 apartments in total
Total
14
Booked
2
Available
12

Saleable Area Statistics (Sq. ft.)

15225 Total
Total
15225
Booked
2450
Available
12775
Total 14 apartments in project. 2 apartments booked. 14% apartments booked.
Total 15225 Sq.ft. saleable area. 2450 saleable area booked.
16% area booked.

A1 Complex Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A1 Complex Building No 2Mar 202321000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
UNIT37.63 Sq.mts. ( 405 Sq.ft. )2
None Booked0% Booked
0% Booked
UNIT93.83 Sq.mts. ( 1010 Sq.ft. )1
None Booked0% Booked
0% Booked
UNIT94.3 Sq.mts. ( 1015 Sq.ft. )1
None Booked0% Booked
0% Booked
UNIT113.81 Sq.mts. ( 1225 Sq.ft. )8
2 Booked25% Booked
25% Booked
UNIT120.3 Sq.mts. ( 1295 Sq.ft. )2
None Booked0% Booked
0% Booked
14 total apartments / 2 apartments booked. 14% apartments booked.
Work Description in Building A1 Complex Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress20% done
20% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress44% done
44% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Abdulsamad Mohammed Sitpura
for Project
A1 Complex
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation