Project overview

A H Sapphire is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700026430. A H Sapphire is located at 4273,4274,4275. This is a New being developed by A.H. Constructions.

A H Sapphire has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 259 to 687 Sq.ft. Carpet. The Project has total 115 of which 29 are currently available for sale.

A H Sapphire is being developed on a total land area of 30981 Sq.ft. A H Sapphire has 1 Wings / Towers A H Sapphire

ProjectDeveloperLocationPossession
127 Raj Homes B And C WingRaj HomesSurvey No./Hissa No.49(127)/10,11,1231-12-2026 00:00:00
127 Raj Homes D WingRaj Homes49(127)1,2,3,5,6,8,10,11,1231-12-2026 00:00:00
Aaradhya Highpark - Project 1 Of Phase IMan Vastucon LlpS. No. 92 - Corresponding New S. No. 13-130-03-2025 00:00:00
Aaradhya Highpark - Project 2 Of Phase IMan Vastucon LlpS. No 92 Corresponding New S. No. 13/130-03-2025 00:00:00
127 Raj Homes A WingRaj HomesSurvey No./ Hissa No. 49(127)/10,11,1230-09-2025 00:00:00
Aaradhya Parkwood 1Man Vastucon LlpOld Survey No 260 Part/New Survey No 12 Hissa No 231-12-2028 00:00:00
Crescent Wtc (Western Trade Center)Crescent Shelters4152, 4153, 4316, 4351, 4352, 4354, 4355,4356,4357, 4358, 4359, 4360, 4404, 440530-06-2027 00:00:00
Crescent Wtc - Western Trade Center - Phase - Ii, Building A 1 - 2Crescent Shelters4152, 4153, 4316, 4351, 4352, 4354, 4355, 4356, 4357, 4358, 4359, 4360, 4404, 440530-06-2028 00:00:00
Aaradhya Parkwood 2Man Vastucon LlpOld Survey No 260 Part/New Survey No 12 Hissa No 231-12-2028 00:00:00
Shrushti Nirman IiJay Bharati Realty401106, Thane31-12-2018 00:00:00
Krishna PrestigeM/S. Arun Bhoomi Corporation139129-12-2022 00:00:00
Avanya Tower BAniline Properties Private LimitedCts No. 3113-D30-09-2025 00:00:00
Madhuban A And A1 WingM.D. DevelopersCts No 3093 Part31-12-2018 00:00:00
Delta GardenDelta VentureCts1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 21032157 2158 2221 2222 2294 2295 174131-07-2018 00:00:00
Aaradhya Highpark Project Iii Of Phase 1Man Vastucon LlpS.No. 92 Corresponding New S.No. 13-131-12-2025 00:00:00
Sector 2A - Wing CEversmile Properties Private LimitedOld S No.233 (New S No. 66 Pt) Of Village Penkarpada30-06-2027 00:00:00
A H SapphireA.H. Constructions4273,4274,427530-06-2024 00:00:00
GlorisSahakar Developers1113/A To 1113/D31-12-2018 00:00:00
Avanya Tower AAniline Properties Private LimitedCts No 3113D30-12-2023 00:00:00
Db OzoneNeelkamal Realtors Suburban Private Limited4509 - 4513,4517,4547,4548,4572-4575,4604,4609-4611,4652,4691,469231-12-2019 00:00:00
Avanya Tower CAniline Properties Private Limited3113D31-03-2026 00:00:00
Westin Darvesh HorizonDarvesh Properties Private LimitedCts No 4398 To 4403 4436 To 4451 4481 4482 4486 To 4508 4540 To 4546 4565 To 4571 4599 To 4603 469930-06-2021 00:00:00
Vishwa Vihang HeightsLaxmi Lifespaces India Pvt Ltd123615-01-2026 00:00:00
Project Details
  • Project:
    A H Sapphire
  • Location:
  • 4273,4274,4275
  • Const. Stage:
    New
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    A.H. Constructions
  • Phone:
  • Address:
  • Emerald Apts
Project RERA Details
MAHA REARA No: P51700026430
Project Type Residential / Group Housing
RERA Project Status New
Architect Tej's' Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Jul 2024
Last Retrived 26 Jul 2025
A H Sapphire QR Code
A H Sapphire
MahaRERA - P51700026430
Apartment Details & Configuration
TypeArea
1 BHK25.82 Sq.mts. ( 278 Sq.ft. )
1 BHK27.6 Sq.mts. ( 297 Sq.ft. )
1 BHK29.05 Sq.mts. ( 313 Sq.ft. )
1 BHK32.92 Sq.mts. ( 354 Sq.ft. )
1 BHK34.76 Sq.mts. ( 374 Sq.ft. )
2 BHK42.5 Sq.mts. ( 457 Sq.ft. )
2 BHK50.72 Sq.mts. ( 546 Sq.ft. )
2 BHK50.81 Sq.mts. ( 547 Sq.ft. )
Shop55.79 Sq.mts. ( 601 Sq.ft. )
Shop63.78 Sq.mts. ( 687 Sq.ft. )
Shop43.15 Sq.mts. ( 464 Sq.ft. )
Shop43.75 Sq.mts. ( 471 Sq.ft. )
Shop45.69 Sq.mts. ( 492 Sq.ft. )
Shop36.13 Sq.mts. ( 389 Sq.ft. )
Shop38.18 Sq.mts. ( 411 Sq.ft. )
Shop34.15 Sq.mts. ( 368 Sq.ft. )
Shop29.42 Sq.mts. ( 317 Sq.ft. )
Shop28.53 Sq.mts. ( 307 Sq.ft. )
Shop24.05 Sq.mts. ( 259 Sq.ft. )
Shop25.58 Sq.mts. ( 275 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of A H Sapphirelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements20% completed
20% Complete
0
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)20% completed
20% Complete
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in A H Sapphire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of A H Sapphire by A.H. Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

30981 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

115 apartments in total
Total
115
Booked
86
Available
29

Saleable Area Statistics (Sq. ft.)

42794 Total
Total
42794
Booked
30528
Available
12266
Total 115 apartments in project. 86 apartments booked. 74% apartments booked.
Total 42794 Sq.ft. saleable area. 30528 saleable area booked.
71% area booked.

A H Sapphire

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A H SapphireJun 2024141010037
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.82 Sq.mts. ( 278 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK27.6 Sq.mts. ( 297 Sq.ft. )24
23 Booked95% Booked
95% Booked
1 BHK29.05 Sq.mts. ( 313 Sq.ft. )13
11 Booked84% Booked
84% Booked
1 BHK32.92 Sq.mts. ( 354 Sq.ft. )20
20 Booked100% Booked
100% Booked
1 BHK34.76 Sq.mts. ( 374 Sq.ft. )11
9 Booked81% Booked
81% Booked
2 BHK42.5 Sq.mts. ( 457 Sq.ft. )13
7 Booked53% Booked
53% Booked
2 BHK50.72 Sq.mts. ( 546 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK50.81 Sq.mts. ( 547 Sq.ft. )11
8 Booked72% Booked
72% Booked
Shop55.79 Sq.mts. ( 601 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop63.78 Sq.mts. ( 687 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop43.15 Sq.mts. ( 464 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop43.75 Sq.mts. ( 471 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop45.69 Sq.mts. ( 492 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop36.13 Sq.mts. ( 389 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.18 Sq.mts. ( 411 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.15 Sq.mts. ( 368 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.42 Sq.mts. ( 317 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop28.53 Sq.mts. ( 307 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop24.05 Sq.mts. ( 259 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.58 Sq.mts. ( 275 Sq.ft. )1
None Booked0% Booked
0% Booked
115 total apartments / 86 apartments booked. 74% apartments booked.
Work Description in Building A H SapphireCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress45% done
45% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress55% done
55% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
work-in-progress71% done
71% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
A.H. Constructions
for Project
A H Sapphire
last updated on 26 Jul 2025 as per information obtained from MARA RERA.